Requests NRC Adoption of Proposed Docketing Process for Forthcoming Revs to C-E Std SAR
ML20235F614
Person / Time
Site: 05000470
Issue date: 09/18/1987
From: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Miraglia F
Office of Nuclear Reactor Regulation
References
LD-87-050, LD-87-50, NUDOCS 8709290234
Download: ML20235F614 (2)


Text

_

- CONBBEISTION ENGINEERIOGS September 18, 1987 LD-87-050 Docket No. STN 50-470F Mr. Frank J. Miraglia

. Associate Director for Projects Office of Nuclear Reactor Regulation Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Combustion Engineering Standard Safety Analysis Report Docket

Dear Mr. Miraglia:

This letter requests NRC adoption of a proposed docketing process for the forthcoming revisions to the Combustion Engineering Standard Safety Analysis Report.

The Combustion Engineering Standard Safety Analysis Report-FSAR (CESSAR-F), which received an NRC Final Design Approval (FDA-2) on December 21, 1983, is in the process of being revised in accordance with the Commission's Severe Accident and Standardization Pclicy Statements.

The revisions, when complete, will describe our enhanced design; System 80+M. These revisions to CESSAR-F will be submitted with the intention that they will result in a Design Certification rule as described in the Severe Accident and Standardization Policy Statements. Our application will thus be designated the Combustion Engineering Standard Safety Analysis Report - Design Certification (CESSAR-DC).

Since the System 80+ design is based on the System 80R design approved by the NRC in FDA-2, it is vital to the efficacy of any future review process that it build on the NRC's previous findings on System 80. These findings were documented in the complete record of correspondence, meetings, submittals, PDAs, FDAs, etc. which exist on docket number STN 50-470F, as well as the NRC's Safety Evaluation Reports (NUREG-0852 and its Supplements). Since FDA-2 was also relied upon in Operating License applications, we recommend that, in the future, two (2) dockets be utilized. The existing docket (STN 50-470F) could continue to be referenced by any plants which obtained a Construction Permit by referencing PDA-2. The new docket could provide the vehicle to take System 80+ throut-b a Design Certification rule. It could be referenced by future applicants seeking a Construction Permit, Operating License, or Power Systems 1000 Prospect Hill Road (203) 688 1911 Combustion Engineering, Inc.

B709290234 870918; Post Office Box 500 Windsor, Connecucut 06095-0500 Telex: 99297

@]

ADOCK 05000470 PDR A PDR /6

t Mr. ' Frank J. Miraglia

  • - LD-87-050 September 18, 1987 Page 2 combined CP/OL. . It is important, however, that the new docket start off as an exact duplicate of the existing docket (STN 50-470F) complete with-all of its previous history and findings up to and including FDA-2.

We believe that creating a new docket for CESSAR-DC, as described above, will facilitate record-keeping and minimize confusion for both the staff and applicants. We must be certain, however, that the creation of a new docket for CESSAR-DC will not prejudice the outcome of the on-going discussions of. Combustion Engineering's position that the Design Certification review should be based on the FDA-2 findings and conducted in accordance with the Backfit Rule.

Combustion Engineering plans to submit the initial change packages to CESSAR-F in the very near future. Your prompt consideration to this matter would, therefore, be greatly appreciated. If you have any questions, please feel free to call me or Dr. M. D. Green of my staff at (203) 285-5204.

Very truly yours, COMBUSTION ENGINEERING, INC.

  1. 9 A. E. Scherer Director Nuclear Licensing AES:ss L