Category:CORRESPONDENCE-LETTERS
MONTHYEARML20249C1601998-06-24024 June 1998 Transmits Revised Fda for Sys 80+ Design,Per App O of 10CFR52.Duration of Fda Conforms W/Duration of Design Certification Rule for Sys 80+ Std Design LD-98-009, Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant SSAR Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info1998-03-13013 March 1998 Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant SSAR Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info ML20203J3231997-12-17017 December 1997 First Partial Response to FOIA Request for Documents.Records in App a & B Encl & Will Be Available in PDR ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization LD-97-020, Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl1997-06-13013 June 1997 Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl LD-97-015, Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 19971997-05-0707 May 1997 Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 1997 LD-97-014, Transmits Final Version of Sys 80+ Design Control Document (DCD)1997-04-30030 April 1997 Transmits Final Version of Sys 80+ Design Control Document (DCD) ML20138E0301997-04-25025 April 1997 Informs That Portion of Info in Encl 1 of Vendor 960416 Submittal of Presentation Matl on ABB-C-E Licensing Plan for Full Batch Implementation of ABB Advanced Fuel for Meeting Held on 960416 W/Nrc Will Be Withheld,Per 10CFR2.790 ML20147C0881997-01-23023 January 1997 Responds to Requesting Opportunity to Review Design Certification Rule for ABB Combustion Engineering Sys 80+ Before Sending to Office of Fr for Publication LD-96-062, Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication1996-12-18018 December 1996 Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication ML20133A9791996-12-18018 December 1996 Approves Rules Certifying Asea Brown Boveri-Combustion Engineering Sys 80+ & General Electric Nuclear Energy Advanced Boiling Water Reactor ML20133A9811996-12-18018 December 1996 Informs That NRC Has Approved Rules Certifying Two Evolutionary Reactor Designs:Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energy ABWR ML20133A9871996-12-18018 December 1996 Informs of NRC Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-CE Sys 80+ & GE Nuclear Energy ABWR ML20133A9901996-12-18018 December 1996 Informs That NRC Has Approved Asea Brown Boveri CE Sys 80+ & GE Nuclear Energy ABWR as Evolutionary Reactor Designs ML20133B0191996-12-18018 December 1996 Informs of Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energys Advanced BWR LD-96-060, Forwards Rev to Sys 80+ Std Plant Design Control Document1996-12-13013 December 1996 Forwards Rev to Sys 80+ Std Plant Design Control Document ML20149M3091996-12-10010 December 1996 Responds to Which Requested Status of CESSAR-DC Relative to Fda for Sys 80+ Design ML20129E7111996-10-0101 October 1996 Forward RAI Re CENPD-137,Suppl 2-P, Calculative Methods for ABB CE Small Break LOCA Evaluation Model. Submittal Being Withheld from Public Disclosure Pending Staff Final Determination,Per 960523 Request LD-96-042, Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed1996-09-26026 September 1996 Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking LD-96-029, Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking1996-07-25025 July 1996 Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking LD-96-028, Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages1996-07-17017 July 1996 Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages LD-96-024, Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document1996-06-27027 June 1996 Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document LD-96-021, Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval1996-06-11011 June 1996 Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval ML20107G1451996-04-17017 April 1996 Transmits CEOG Task 931 Survey Questionnaire-CEA Insertion Experience W/High Burnup Fuel Mgt ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations LD-95-026, Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER1995-10-0606 October 1995 Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER LD-95-040, Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package1995-09-0505 September 1995 Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package ML20092D2871995-08-23023 August 1995 Forwards Correction to Comment 19 Re Proposed Design Certification Rules for Standardized Advanced Reactors. Last Line on First Page May Have Been Lost Due to Word Processing Error ML20092D2561995-08-23023 August 1995 Forwards Correction to Comment 20 Re Proposed Design Certification Rules for Standardized Advancement Reactors. Last Line of Text May Have Been Lost Due to Word Processing Error ML20085G2711995-06-14014 June 1995 Proposes to Respond to RAIs on GE TR NEDE-32177P, Tracg Computer Code Qualification, Dtd Jan 1993 in Three Groups as Indicated in Attachment ML20082G5511995-04-10010 April 1995 Provides Documents & Info Requested in NRC Audit (950407- 950410) Re Rv Fabrication ML20203J4371995-04-0404 April 1995 Forwards Fr Notice Re Proposed Amends to Commission Regulations for Commercial Npps,Adding New App a to 10CFR52 Which Will When Promulgated Certify Sys 80+ Std Design of ABWR LD-95-015, Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs1995-03-27027 March 1995 Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs LD-95-013, Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE1995-03-24024 March 1995 Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE LD-95-011, Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page1995-03-17017 March 1995 Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page LD-95-003, Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document1995-03-0303 March 1995 Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document LD-95-007, Forwards Revised Sys 80+ Design Control Document1995-02-22022 February 1995 Forwards Revised Sys 80+ Design Control Document LD-95-006, Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc1995-02-16016 February 1995 Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc LD-95-005, Forwards Proprietary Sys 80+ Parameter List for Safety Analyses. Encl Withheld1995-02-10010 February 1995 Forwards Proprietary Sys 80+ Parameter List for Safety Analyses. Encl Withheld LD-95-001, Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design1995-01-0606 January 1995 Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design NRC-94-4383, Comments on Review of Draft NUREG-1512 for Proprietary Info1994-12-27027 December 1994 Comments on Review of Draft NUREG-1512 for Proprietary Info LD-94-073, Forwards Sys 80+ Design Control Document, Vols 1-241994-12-16016 December 1994 Forwards Sys 80+ Design Control Document, Vols 1-24 LD-94-072, Provides Justification for Tier 2 Seismic & Valve Testing Expirations1994-12-16016 December 1994 Provides Justification for Tier 2 Seismic & Valve Testing Expirations LD-94-071, Transmits Addl Input to System 80+ Design Control Document1994-12-15015 December 1994 Transmits Addl Input to System 80+ Design Control Document LD-94-069, Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers1994-12-0808 December 1994 Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers ML20078N8961994-12-0101 December 1994 Forwards Copy of Ltr NFBWR-94-033 ML20149H1941994-11-14014 November 1994 Responds to Indicating Concern Re Application of Set of Interrelated Elements That Defines Technical & Regulatory Aspects of design-basic Accident Source Term for Licensing of Passive Plants LD-94-065, Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule1994-10-28028 October 1994 Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule 1998-06-24
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARLD-98-009, Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant SSAR Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info1998-03-13013 March 1998 Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant SSAR Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization LD-97-020, Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl1997-06-13013 June 1997 Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl LD-97-015, Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 19971997-05-0707 May 1997 Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 1997 LD-97-014, Transmits Final Version of Sys 80+ Design Control Document (DCD)1997-04-30030 April 1997 Transmits Final Version of Sys 80+ Design Control Document (DCD) LD-96-062, Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication1996-12-18018 December 1996 Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication LD-96-060, Forwards Rev to Sys 80+ Std Plant Design Control Document1996-12-13013 December 1996 Forwards Rev to Sys 80+ Std Plant Design Control Document LD-96-042, Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed1996-09-26026 September 1996 Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking LD-96-029, Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking1996-07-25025 July 1996 Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking LD-96-028, Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages1996-07-17017 July 1996 Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages LD-96-024, Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document1996-06-27027 June 1996 Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document LD-96-021, Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval1996-06-11011 June 1996 Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval ML20107G1451996-04-17017 April 1996 Transmits CEOG Task 931 Survey Questionnaire-CEA Insertion Experience W/High Burnup Fuel Mgt ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations LD-95-026, Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER1995-10-0606 October 1995 Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER LD-95-040, Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package1995-09-0505 September 1995 Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package ML20092D2561995-08-23023 August 1995 Forwards Correction to Comment 20 Re Proposed Design Certification Rules for Standardized Advancement Reactors. Last Line of Text May Have Been Lost Due to Word Processing Error ML20092D2871995-08-23023 August 1995 Forwards Correction to Comment 19 Re Proposed Design Certification Rules for Standardized Advanced Reactors. Last Line on First Page May Have Been Lost Due to Word Processing Error ML20085G2711995-06-14014 June 1995 Proposes to Respond to RAIs on GE TR NEDE-32177P, Tracg Computer Code Qualification, Dtd Jan 1993 in Three Groups as Indicated in Attachment ML20082G5511995-04-10010 April 1995 Provides Documents & Info Requested in NRC Audit (950407- 950410) Re Rv Fabrication LD-95-015, Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs1995-03-27027 March 1995 Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs LD-95-013, Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE1995-03-24024 March 1995 Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE LD-95-011, Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page1995-03-17017 March 1995 Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page LD-95-003, Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document1995-03-0303 March 1995 Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document LD-95-007, Forwards Revised Sys 80+ Design Control Document1995-02-22022 February 1995 Forwards Revised Sys 80+ Design Control Document LD-95-006, Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc1995-02-16016 February 1995 Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc LD-95-005, Forwards Proprietary Sys 80+ Parameter List for Safety Analyses. Encl Withheld1995-02-10010 February 1995 Forwards Proprietary Sys 80+ Parameter List for Safety Analyses. Encl Withheld LD-95-001, Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design1995-01-0606 January 1995 Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design NRC-94-4383, Comments on Review of Draft NUREG-1512 for Proprietary Info1994-12-27027 December 1994 Comments on Review of Draft NUREG-1512 for Proprietary Info LD-94-072, Provides Justification for Tier 2 Seismic & Valve Testing Expirations1994-12-16016 December 1994 Provides Justification for Tier 2 Seismic & Valve Testing Expirations LD-94-073, Forwards Sys 80+ Design Control Document, Vols 1-241994-12-16016 December 1994 Forwards Sys 80+ Design Control Document, Vols 1-24 LD-94-071, Transmits Addl Input to System 80+ Design Control Document1994-12-15015 December 1994 Transmits Addl Input to System 80+ Design Control Document LD-94-069, Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers1994-12-0808 December 1994 Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers ML20078N8961994-12-0101 December 1994 Forwards Copy of Ltr NFBWR-94-033 LD-94-065, Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule1994-10-28028 October 1994 Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule LD-94-063, Forwards Rev 1 of Technical Support Document for Amends to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design1994-10-10010 October 1994 Forwards Rev 1 of Technical Support Document for Amends to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design ML20072T2691994-08-30030 August 1994 Advises That Industry Intends to Comment in Opposition to Applicable Regulations Approach & Proposed Text of Applicable Regulations in Design Certification Rulemaking Proceeding for Both ABWR & Sys 80+ LD-94-059, Forwards Draft Notice of Issuance of EA & Draft Fonsi, Together W/Supporting Draft Proposed EA for Consideration,W/ Respect to Draft EA NRC Producing for Proposed Sys 80+ Design Process1994-08-22022 August 1994 Forwards Draft Notice of Issuance of EA & Draft Fonsi, Together W/Supporting Draft Proposed EA for Consideration,W/ Respect to Draft EA NRC Producing for Proposed Sys 80+ Design Process ML20072B9641994-08-12012 August 1994 Requests That Author Name Be Added to Sys 80+ Service List. Author Counsel to Westinghouse in AP600 Design Certification ML20072E3561994-08-0909 August 1994 Requests Addition of Author Name to Sys 80+ Svc List ML20073E1721994-07-25025 July 1994 Forwards Rept Entitled, Analysis of Ex-Vessel Steam Explosions for Combustion Engineering Sys 80+ Using Gtsf Computer Code. Provides Comments on Central,Outer & Multiple Instrument Tube Failures LD-94-054, Forwards Errata to Sys 80+ Certified Design Matl,In Response to Editorial & Word Processing Errors1994-07-21021 July 1994 Forwards Errata to Sys 80+ Certified Design Matl,In Response to Editorial & Word Processing Errors LD-94-052, Requests That Service List for Docket 52-002 Be Updated in Accordance W/Encl Listing,Due to Changes in Position Titles, Affiliations & Organizations.Correspondence on Docket 52-002 Should Be Addressed to Listed Address1994-07-20020 July 1994 Requests That Service List for Docket 52-002 Be Updated in Accordance W/Encl Listing,Due to Changes in Position Titles, Affiliations & Organizations.Correspondence on Docket 52-002 Should Be Addressed to Listed Address LD-94-053, Seeks Confirmation of Vendor Understanding of NRC Fee Regulations in 10CFR170 as Pertaining to Sys 80+ Design Certification Rulemaking as Set Forth in Encl1994-07-20020 July 1994 Seeks Confirmation of Vendor Understanding of NRC Fee Regulations in 10CFR170 as Pertaining to Sys 80+ Design Certification Rulemaking as Set Forth in Encl LD-94-048, Forwards Certified Design Matl Related to Design Reliability Assurance Program & Corresponding Errata Pages for CESSAR-DC (Section 1.0,17.3 & 19.15) Amend W,To Resolve NRC Comments Received by Telcon Over Past Two Wks1994-07-12012 July 1994 Forwards Certified Design Matl Related to Design Reliability Assurance Program & Corresponding Errata Pages for CESSAR-DC (Section 1.0,17.3 & 19.15) Amend W,To Resolve NRC Comments Received by Telcon Over Past Two Wks ML20077F4111994-07-0808 July 1994 Forwards Technical Evaluation Rept Entitled, an Analysis of Core Meltdown Accidents in CE Sys 80+ Plant Using Melcor LD-94-047, Forwards Replacement Page for System 80+ Emergency Operations Guidelines1994-06-28028 June 1994 Forwards Replacement Page for System 80+ Emergency Operations Guidelines LD-94-046, Submits Sys 80+ Design & Operational Features Re Deviations from Regulations1994-06-27027 June 1994 Submits Sys 80+ Design & Operational Features Re Deviations from Regulations 1998-03-13
[Table view] |
Text
. - _ - _ _ -
The Best Performm,de/A g g CE Plants Are Fueled l-g lf With ABB FUEL j
52 -re l
B Hr J m~, MM/tvec- **"" & %jm i
'"""'"b*f-So/ - Mf 359 g l
Depa* net 8d2d-AD/O l
e///7/9/,
'*"'*'**7& _ M-Mx Total Pages (including cover):
Fax Number:
g g_
,g f
tf (E d h ~94 ~// G i
A
)
(cos /d NI Q%~
CEA W AW
%MP 1
i b
W 1
i i
ABB COMBUSTION ENGINEERING NUCLEAR OPERATIONS Iv j
COMBUSTION ENGINEERING, INC.
r%
j 102 ADDISON ROAD 1
y l
WINDSOR, CT 06095-0500 1
i l
$.9 _0 0 D
_ ['3'(s l
9604230120 960417
- o"
^oockosaoma EC FM MNM CFf
ABB COMBUSTION ENGINEERING OWNERS GROUP April 1,1996 CEOG-96-116 Analysis Subcommittee Licensing Subcommittee Participants in Task 031 Gentlemen:
Subject:
CEOG Task 931 Survey Questionnaire-CEA Insertion Experience with High Burnup Fuel Management The purpose of this le"?r is to transmit a questionnaire developed under CEOG Task 931. CEOG Te V 31 has been designed to allow the CEOG to proactively address NRC Bulletin
- 01. NRC Bulletin 96-01 was irecently ssued based upon control rod insertiu problems in higher bumup fuel assemblies at several Westinghouse PWR units. Although formal action is required only from PWR licensees of Westinghouse units, the NRC requested in a March 27,1996 meeting that CEOG and B&WOG proactively respond to the issues of the Bulletin. CEOG Task 931 has been authorized to provide a formal response through the development of a CEA insertion experience data base for all CE plant designs and a technical report on this issue for CEOG member use and reference. The questions in this survey are intended to produce a comprehensive CEA insertion experience data base.
The Analysis Subcommittee member is requested to coordinate the response to the enclosed questionnaire. Additionally, the Analysis Subcommittee member is requested to provide the name and telephone number of a technical point of contact for this task to the Task Leader listed below. Resoonses to the auestionnaire are reauested bv Aoril 15.1996.
Mr. Ron Freeburn ABB Combustion Engineering 2000 Dayhill Road CEP Code 5327-AD10 Windsor, CT 06095 Phone:
(860)687-8042, Fax: (860) 687-8051 H. Ronald. Freeburn@ussev. mail.abb.com ABB Combustion Engineering Nuclear Operations enow m ~
g g uo rggage,w13
_ _. _ - - _ _ ~
WMeat f.awleut (W1Q4tWY)
~ ASC April 1,1996 Pcgn 2 CEOG-96-116 if you are aware of additional information relevant to this topic that is not specifically requested in the survey, please discuss the information with Ron Freeburn. If you have any questions, please contact Ron or me at (860) 285-3115.
Sincerely, l
l Paul J. Hijeck l
Assistant Project Manager C-E Owners Group l
Attachment cc:
G. C. Bischoff, ABB P. W. Richardson, ABB R. Freebum, ABB
- 1. Rickard, ABB i
l ANALYSIS SUBCOMMITTEE J. Brown, APS (Tonopah)
J. A. Mihalcik, BGE (Lusby)
G. Jarka, CPC (Covert)
- 8. T. Lubin, ABB (Windsor)
- 8. Daiber, Entergy Operations-ANO (Russellville)
L.A. Martin, FPL (Juno)
J. Holman, Entergy Operations-Waterford (Killona)
H. Jones, MY (Brunswick)
H. Thompson, NU (Waterford)
K. Holthaus, OPPD (Ft. Calhoun)
A. Brough, SCE (Irvine)
LICENSING SUBCOMMITTEE i
J. Provasoli, APS (Tonopah)
S. Bauer, APS (Tonopah)
C. M. Molnar, ABB (Windsor)
J. Osborne, BGE (Lusby)
E. J. Weinkam Ill, FPL (Jensen Beach)
- 8. Vincent, CPC (Covert)
G. Ashley, Entergy Operations-ANO (Russellville)
J. Brinkler, MY (Brunswick)
P. Caropino, Entergy Operations-Waterford (Killona)
M. Robles, Jr., NU (Millstone)
W. Hansher, OPPD (Omaha)
B. Woods, SCE (San Clemente) l-
Attrchm::nt to CEOG-96-116 Questionnaire-CEA Insertion Experience with High Burnup Fuel Management Questions:
1.
Provide copies of any Licensing Event Reports (LERs) written on CEA operability issues within the last 10 years, including any problem related to slow CEA insertions, restricted CEA insertions or failure of CEAs to fully insert.
Indicate the type of CEA affected (e.g., shutdown, part length). Wrthin this same time period, have rod bottom lights ever failed to light after a reactor trip or during rod drop testing?
2.
Provide copies of any root cause analyses performed related to CEA operability issues in Question 1.
3.
Have CEAs ever been noted to be stuck within fuel assemblies or difficult to withdraw or insert during refueling or maintenance operations within 2
containment or at the spent fuel pool, where LERs were not required? Provide details of each event.
4.
Provide CEA drop time test data obtained over a minimum of the last five years (four or more cycles), including reactor cycle number, time in cycle, drop time by CEA, type of CEA and raw data if available. Provide average bumup of each assembly under a CEA for each such test. Indicate when replacement CEAs are first used.
5.
Provide CEA scram data obtained over a minimum of the last five years (four or more cycles), including reactor cycle number, time in cycle, scram time by CEA, type of CEA and raw data if available. Provide average burnup of each assembly under a CEA for each scram experienced.
6.
Has your review of drop time test data or scram data indicated that these data may provide precursor information relative to CEAs sticking within guide tube or dashpot region (e.g., such as the lack of rod recoil observed in traces for Westinghouse control rods at higher bumup)?
7.
Have you ever performed CEA drag tests at any of your CE units? If so, please provide results.
8.
Have you performed visual (e.g., boroscopic) inspections of guide tube inner diameter wall within the last 10 years? If so, please provide results.
~,,.. -.. -
.res.# aw.s
-a*
3
m
.m n
.p,
1 Attachment to CEOG-96-116 9.
Hava indications cycr been documented of unusual crud or corrosion buildup on interior walls of guide tubes or dashpot regions? Have these deposits been tied to a change in CEA insertion times? Please provide details.
10.
Excessive fuel assembly distortions (e.g., abnormal bow and twist) have been suggested as a possible contributing factor to stuck Westinghouse control rods. Has fuel assembly distortion been noted to be any more severe in higher bumup fuel assemblies such that unusual handling situations result? Please provide specific details of any event.
11.
What suggestions do you have for reasonably obtaining supplemental operating data that assures acceptable CEA operability on a continuing basis?
In particular, what are important considerations (pros and cons) for performing a rod drop test from low power at EOC and/or CEA drag testing in higher bumup discharged fuel assemblies?
t l
wwa
-, e,-4 * -
.i.