ML20148D324
| ML20148D324 | |
| Person / Time | |
|---|---|
| Site: | 05000470 |
| Issue date: | 01/19/1988 |
| From: | Scherer A ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| To: | Miraglia F Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20148D327 | List: |
| References | |
| LD-88-005, LD-88-5, NUDOCS 8801250367 | |
| Download: ML20148D324 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _._.
January 19, 1988 LD-88-095 Docket No:
STN 50-470F Mr. Frank J. Miraglia Associate Director for Projects Office of Nuclear Reactor Regulation l
Attn: Document Control Desk U.S. Nuclear Regulatory Commission l
Washington, DC 20555
Subject:
Licensing Review Bases Document
References:
(A) Letter, LD-87-036, A. E. Scherer (C-E) to Frank J. Miraglia (NRC), dated July 2,1987 (B) Letter, G. S. Vissing (NRC) to A. E. Scherer (C-E), dated December 7,1987
Dear Mr. Miraglia:
This letter transmits our input to the Licensing Review Bases document being developed for Combustion Engineering's Standard Safety Analysis Report - Design Certification (CESSAR-DC). Our draft input was first l
transmitted to you by Reference ( A).
Since that time, we have had several meetings with the Staff to describe our Design Certification Program and obtain feedback.
As a result of those discussions, we have revised the draft Licensing Review Bases document, which is provided as
& closure (1).
Enclosure (2) lists the initial review comraents outlined in Leference (B) and references the appropriate section ir. Enclosum (1) where we have addressed that particular comment.
Enclosure (1) is based, to the extent practical, on tha Licensing Review Bases issued to another vendor.
Combustion Enginevring's approach differs, however, in that CESSAR-DC will be based on the already approved CESSAR-FSAR and the corresponding FDA-2.
In addition, we have added text and appendices to provide a process for establishing and documenting review acceptance criteria and demonstrating the System 80+ M Standard Design's compliance with the guidance of the Severe Accident, Safety Goal and Standardization Policies. A fourth appendix, entitled "Instrumentation and Controls", will be forwarded to you in the near future.
O i
g O
A rower Systems 1000 Prospect Hdi Road
(<.03) 688-1911 Combucoon Eng neenng. Inc.
Post Offcc 53ox 500 Telex: 99297 Windsor, Connectcut 06095 0500
Mr. Frank J. Miraglia LD-88-005 January 19, 1988 Page 2 We will very much appreciate your early review of the enclosed draft.
In the near future we will be contacting your staff to discuss a schedule for issuance of these Licensing Review Bases.
If yon have any questions, please call me or Dr. M. D. Green of my staff at (203) 285-5204.
Very truly yours, COMBUSTION ENGINEERING, INC.
A. E. #Scherer Direc.or Nue". ear Licensing AES:ss Enclosures e
a.