|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20249C1601998-06-24024 June 1998 Transmits Revised Fda for Sys 80+ Design,Per App O of 10CFR52.Duration of Fda Conforms W/Duration of Design Certification Rule for Sys 80+ Std Design LD-98-009, Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant Ssar Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info1998-03-13013 March 1998 Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant Ssar Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info ML20203J3231997-12-17017 December 1997 First Partial Response to FOIA Request for Documents.Records in App a & B Encl & Will Be Available in PDR ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization LD-97-020, Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl1997-06-13013 June 1997 Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl LD-97-015, Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 19971997-05-0707 May 1997 Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 1997 LD-97-014, Transmits Final Version of Sys 80+ Design Control Document (DCD)1997-04-30030 April 1997 Transmits Final Version of Sys 80+ Design Control Document (DCD) ML20138E0301997-04-25025 April 1997 Informs That Portion of Info in Encl 1 of Vendor 960416 Submittal of Presentation Matl on ABB-C-E Licensing Plan for Full Batch Implementation of Abb Advanced Fuel for Meeting Held on 960416 W/Nrc Will Be Withheld,Per 10CFR2.790 ML20147C0881997-01-23023 January 1997 Responds to Requesting Opportunity to Review Design Certification Rule for Abb Combustion Engineering Sys 80+ Before Sending to Office of Fr for Publication ML20133A9791996-12-18018 December 1996 Approves Rules Certifying Asea Brown Boveri-Combustion Engineering Sys 80+ & General Electric Nuclear Energy Advanced Boiling Water Reactor ML20133A9811996-12-18018 December 1996 Informs That NRC Has Approved Rules Certifying Two Evolutionary Reactor Designs:Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energy ABWR ML20133A9871996-12-18018 December 1996 Informs of NRC Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-CE Sys 80+ & GE Nuclear Energy ABWR ML20133A9901996-12-18018 December 1996 Informs That NRC Has Approved Asea Brown Boveri CE Sys 80+ & GE Nuclear Energy ABWR as Evolutionary Reactor Designs ML20133B0191996-12-18018 December 1996 Informs of Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energys Advanced BWR LD-96-062, Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication1996-12-18018 December 1996 Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication LD-96-060, Forwards Rev to Sys 80+ Std Plant Design Control Document1996-12-13013 December 1996 Forwards Rev to Sys 80+ Std Plant Design Control Document ML20149M3091996-12-10010 December 1996 Responds to Which Requested Status of CESSAR-DC Relative to Fda for Sys 80+ Design ML20129E7111996-10-0101 October 1996 Forward RAI Re CENPD-137,Suppl 2-P, Calculative Methods for Abb CE Small Break LOCA Evaluation Model. Submittal Being Withheld from Public Disclosure Pending Staff Final Determination,Per 960523 Request LD-96-042, Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed1996-09-26026 September 1996 Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking LD-96-029, Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking1996-07-25025 July 1996 Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking LD-96-028, Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages1996-07-17017 July 1996 Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages LD-96-024, Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document1996-06-27027 June 1996 Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document LD-96-021, Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval1996-06-11011 June 1996 Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval ML20107G1451996-04-17017 April 1996 Transmits CEOG Task 931 Survey Questionnaire-CEA Insertion Experience W/High Burnup Fuel Mgt ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations LD-95-026, Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER1995-10-0606 October 1995 Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER LD-95-040, Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package1995-09-0505 September 1995 Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package ML20092D2561995-08-23023 August 1995 Forwards Correction to Comment 20 Re Proposed Design Certification Rules for Standardized Advancement Reactors. Last Line of Text May Have Been Lost Due to Word Processing Error ML20092D2871995-08-23023 August 1995 Forwards Correction to Comment 19 Re Proposed Design Certification Rules for Standardized Advanced Reactors. Last Line on First Page May Have Been Lost Due to Word Processing Error ML20085G2711995-06-14014 June 1995 Proposes to Respond to RAIs on GE TR NEDE-32177P, Tracg Computer Code Qualification, Dtd Jan 1993 in Three Groups as Indicated in Attachment ML20082G5511995-04-10010 April 1995 Provides Documents & Info Requested in NRC Audit (950407- 950410) Re Rv Fabrication ML20203J4371995-04-0404 April 1995 Forwards Fr Notice Re Proposed Amends to Commission Regulations for Commercial Npps,Adding New App a to 10CFR52 Which Will When Promulgated Certify Sys 80+ Std Design of ABWR LD-95-015, Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs1995-03-27027 March 1995 Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs LD-95-013, Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE1995-03-24024 March 1995 Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE LD-95-011, Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page1995-03-17017 March 1995 Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page LD-95-003, Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document1995-03-0303 March 1995 Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document LD-95-007, Forwards Revised Sys 80+ Design Control Document1995-02-22022 February 1995 Forwards Revised Sys 80+ Design Control Document LD-95-006, Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc1995-02-16016 February 1995 Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc LD-95-001, Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design1995-01-0606 January 1995 Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design NRC-94-4383, Comments on Review of Draft NUREG-1512 for Proprietary Info1994-12-27027 December 1994 Comments on Review of Draft NUREG-1512 for Proprietary Info LD-94-072, Provides Justification for Tier 2 Seismic & Valve Testing Expirations1994-12-16016 December 1994 Provides Justification for Tier 2 Seismic & Valve Testing Expirations LD-94-073, Forwards Sys 80+ Design Control Document, Vols 1-241994-12-16016 December 1994 Forwards Sys 80+ Design Control Document, Vols 1-24 LD-94-071, Transmits Addl Input to System 80+ Design Control Document1994-12-15015 December 1994 Transmits Addl Input to System 80+ Design Control Document LD-94-069, Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers1994-12-0808 December 1994 Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers ML20078N8961994-12-0101 December 1994 Forwards Copy of Ltr NFBWR-94-033 ML20149H1941994-11-14014 November 1994 Responds to Indicating Concern Re Application of Set of Interrelated Elements That Defines Technical & Regulatory Aspects of design-basic Accident Source Term for Licensing of Passive Plants LD-94-065, Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule1994-10-28028 October 1994 Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule LD-94-063, Forwards Rev 1 of Technical Support Document for Amends to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design1994-10-10010 October 1994 Forwards Rev 1 of Technical Support Document for Amends to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design 1998-06-24
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20249C1601998-06-24024 June 1998 Transmits Revised Fda for Sys 80+ Design,Per App O of 10CFR52.Duration of Fda Conforms W/Duration of Design Certification Rule for Sys 80+ Std Design ML20203J3231997-12-17017 December 1997 First Partial Response to FOIA Request for Documents.Records in App a & B Encl & Will Be Available in PDR ML20138E0301997-04-25025 April 1997 Informs That Portion of Info in Encl 1 of Vendor 960416 Submittal of Presentation Matl on ABB-C-E Licensing Plan for Full Batch Implementation of Abb Advanced Fuel for Meeting Held on 960416 W/Nrc Will Be Withheld,Per 10CFR2.790 ML20147C0881997-01-23023 January 1997 Responds to Requesting Opportunity to Review Design Certification Rule for Abb Combustion Engineering Sys 80+ Before Sending to Office of Fr for Publication ML20133A9871996-12-18018 December 1996 Informs of NRC Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-CE Sys 80+ & GE Nuclear Energy ABWR ML20133B0191996-12-18018 December 1996 Informs of Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energys Advanced BWR ML20133A9811996-12-18018 December 1996 Informs That NRC Has Approved Rules Certifying Two Evolutionary Reactor Designs:Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energy ABWR ML20133A9901996-12-18018 December 1996 Informs That NRC Has Approved Asea Brown Boveri CE Sys 80+ & GE Nuclear Energy ABWR as Evolutionary Reactor Designs ML20133A9791996-12-18018 December 1996 Approves Rules Certifying Asea Brown Boveri-Combustion Engineering Sys 80+ & General Electric Nuclear Energy Advanced Boiling Water Reactor ML20149M3091996-12-10010 December 1996 Responds to Which Requested Status of CESSAR-DC Relative to Fda for Sys 80+ Design ML20129E7111996-10-0101 October 1996 Forward RAI Re CENPD-137,Suppl 2-P, Calculative Methods for Abb CE Small Break LOCA Evaluation Model. Submittal Being Withheld from Public Disclosure Pending Staff Final Determination,Per 960523 Request ML20203J4371995-04-0404 April 1995 Forwards Fr Notice Re Proposed Amends to Commission Regulations for Commercial Npps,Adding New App a to 10CFR52 Which Will When Promulgated Certify Sys 80+ Std Design of ABWR ML20149H1941994-11-14014 November 1994 Responds to Indicating Concern Re Application of Set of Interrelated Elements That Defines Technical & Regulatory Aspects of design-basic Accident Source Term for Licensing of Passive Plants ML20149F4231994-08-0505 August 1994 Updates Guidance on Preparation of Design Control Document Contained in .Requests Submittal of Listed Info,In Order to Preclude Iterations & Amends to Design Control Document ML20059F4031994-01-0707 January 1994 Comments on TS Sections 4 & 5 for Sys 80+.Markup Copy of Affected TS Encl.Responses to Comments Requested No Later than 2 Wks from Receipt of Ltr ML20058L3811993-12-0707 December 1993 Forwards Staff Comments on Markup Copy of Affected TS & Requests That Responses to Comments Be Provided No Later than Two Wks from Receipt of Ltr ML20058L2651993-12-0303 December 1993 Forwards Initial Staff Comments on ABB-CE Sys 80+ Tier 1 931020 & 1112 Submittals.Submittals Adequately Reflected Agreements Reached for Tier 1 Matl During 931004-06 Meetings.Several Open Items Remain Unresolved ML20058A0931993-11-16016 November 1993 Forwards Comments on TS for Sys 80+.Requests Responses to Comments No Later than 2 Weeks from Ltr Receipt to Maintain Review Schedules ML20059J0771993-11-0404 November 1993 Provides Update on Status of Review of Nuplex 80+ Control Complex for Sys 80+ Design Certification.Review Essentially Complete & NRC Preparing SER ML20057F8641993-10-14014 October 1993 Forwards Llnl Comments on ABB-CE Sys 80+ I&C Ts. Attachments 1 & 2 to Rept Provide Sample Definitions for Channels & Functional Tests NUREG/CR-6105, Forwards Preliminary Draft Version of NUREG/CR-6105, Human Factors Engineering Guidelines for Review of Advanced Alarm Sys & Draft of NUREG/CR-5908, Advanced Human Sys Interface Design Review Guideline1993-09-28028 September 1993 Forwards Preliminary Draft Version of NUREG/CR-6105, Human Factors Engineering Guidelines for Review of Advanced Alarm Sys & Draft of NUREG/CR-5908, Advanced Human Sys Interface Design Review Guideline ML20057A9391993-09-0202 September 1993 Forwards NRC Comments on CE Sys 80+ Tier 1 Submittals Dtd 930430,0503-08,0604,0618 & 0629 ML20056H6361993-08-26026 August 1993 Responds to Informal Inquiries from Design Certification Applicants Re Form & Content of Design Control Document. Forwards Presentation of Current Staff Views Re Document ML20056F3741993-08-12012 August 1993 Requests That ABB-CE Comprehensively & Systematically Evaluate Potential Design Alternatives Proposed to Reduce Probability of SGTR Containment Bypass Accident Sequences ML20056D9431993-07-30030 July 1993 Forwards Preliminary Comments on TS Sys 80+ (Chapter 16 CESSAR-DC) Submitted in App K.Status Sheet Also Encl ML20128G1051993-02-10010 February 1993 Discusses ITAAC Submittal for ABB-CE Sys 80+ & Provides Proposed Schedule for Review ML20127J2821993-01-15015 January 1993 Discusses Level of Design Detail for Sys 80+ Structures & Lists Expected Level of Completion ML20126G5571992-12-23023 December 1992 Forwards Request for Addl Info on CESSAR-DC,system 80+ Shutdown Risk Evaluation Rept ML20126F6021992-12-22022 December 1992 Forwards Llnl 921208 Rept Entitled, Review of CE 80+ FMEA & D&Did Analysis, to Be Discussed at 930106 Public Meeting 1998-06-24
[Table view] |
Text
r U,0, NUCLE AR CE!ULATO3Y COMMISSION Nat 5 aiA uumt NAtt Hist FOIA - 97_384 ntSPONSE TYPE
- hgY(g
.[ HESPONGE TO FREEDOM OF jfmu lxxi PARTIAL ( } $t )
g INFORMATION ACT (FOlA) REQUEST o^u s n .c. DEC 171997 DOCAL T NUMbt HIS)(ff ant <ahde/
M OVE 511 W M,3 Carol 0, t. e o n n i a PART 1.-AGENCY RECORDS RELE ASED OR NOT LOCATED /De checArd boarsi No agency records subject io the request have been located.
Na additional agency records subject to the request have been located.
Requested iscords are avaHable through another pubhc distrib:, tion progren See Comments section.
Agency records subject to the request that are kjentified in AppendMes) A are s,eady andable for pubhc inspection and copying at tw X NRC Pubhc Document Room 2120 L Street. N.W., Washington. DC.
m are being made avaaabic for pubhc iriwton and reprin9 Agerry records subject to the request that are identif sd in Appendia(est B
= )( tt the NRC Pubhc Document Room 2120 L Street, N.W., Washington, DC. m a folder under this FOi A number.
The nonpNorietary version of the preposal(s) that you agreed to accept in a telephone conversation vth a mernber of my staff is now being made avadab:c frw pubhc inspection and copying at de N RC Pubhc Document Room. 2120 L Sweet, N.W., Wa.hinaten, DC, in a folder under this FOI A number.
Agency records subject to the request that are identihed in Anpendiu(es) may be inspected and cop;ed at the N RC Local Put>he Document Roorn identified in the Comrvents section.
Enclosed rs information on how you may obtain access to and the charges foi copying records located at the NRC Public Document Roo n. 2t 20 L Street, X N W , Washington DC y Agency records subrect to the request are enclosed Records subject to the request have been referred to another Federal agencybes) for review and direct response to you Fees You will be baled by the N RC for fees to'ahng S You will receive a refund from the N RC in the amount of S in view of NRC's respone so this request, no further action is being taken on appeal ietter dated ,No PART ll. A-INFORMATION WITHHELD F ROM PUBLIC DISCLOSURE I Ccrttin inf ormation in the requested records is being withheld from public disclosure pursuant to the nemg., sons described in arid f or the reasons stated in Pcrt li, B, C, and D. Any released portions of the documents for which only part of the record is being withhekt are being made avadable f or pubile inspection and copying in the NRC Pubhc Document Room,2120 L Street, N.W , Washington, DC in a folder under this FOIA number.
COMME NTS The records identmed on enctooed Appendices A and B we responswe to your repest, As q repeded h your @ conversehon e Nine Pugh on November 25,1997, I am encloemg the 100 pages W rooords to which you are ontmed at no charge, h renander d h rooords seier are skoody maintuned on the at NRC's Putec Document Room (PDR) or are being pleoed at the PDR. I am encineing instructions to seest you when you contmot the PDR.
The review d adstonal focords is contnuing, You we be noemed orn this nmew is co@M f
V, j \
l j GM i4N A T UWt i, Ot H L C f DiMSION Of f itE L D I JORMATION ANO PUBLICAllONS SLHViCf".
L y
D n.f(%di!u y I
h21 88 971217 7 IEONNIQ97-38,4 PDR y
e -
(
- V Re
- FOIA 97 384 t-APPENDIX A RECORDS ALREADY AVAILABLE IN THE PDR ACCESSION NO2 DATE _ NUMBER. DESCRIPl1QNIIPAGE COUNT)
- 1. 6/1/95 9506290384 Letter to Senator Faircloth from Chairman Selin transmitting NRC Inspector Generats Semi-Annual Report.
2, 2/15/96 9601180269 Letter to Senator Faircloth from Chairman Jackson transmitting NRC's Response to GAO Recommendations in the " Uranium Mill Tailiva: Cleanup Continues, but Further Costs are Uncertain," report.
- 3, 3/7/96 9603180052 Letter to Senator Faircloth from Chairman Jackson transmitting Remarks to NRC Employees re: Time Magazine article on Recent Events at Millstone Unit 1.
- 4, 5/23/96 9606260245 Letter to Senator Faircloth from J. Taylor Transmitting the FU 95 Accountability Report w/o attachment.
5, 7/10/96 9607220243 Letter to Senator Faircloth from Chairman Jackson Responding to Lir of 6/7/96, Expressing Concern about Potential Conflict Between NRC's Fitness for Duty Requirements.
- 6. 9/20/96 9610090193 Letter to Senator Faircloth from Chairman Jackson Informing NRC Staff has issued initial Certification Decision on US Enrichment Corporation's Two Gaseous Diffusion Uranium Enrichment Plants in Paducah, Kentucky,
-1 i
l
- 7. 10/31/96 9611080251 Letter to Senator Faircloth from Chairman Jackson Providing the Status of Fee 1 Collection Activities for FY 96. l
- 8. 12/6/96 9708250073 Letter to Senator Faircloth from Chairman Jackson Responding the National Academy l of Sciences, inst of Medicine's Report entitled," Radiation Medicine: A Need for Regulatory Reform."
- 9. 12/18/96 9701020203 Letter to Senator Faircloth from Chairman Jackson, re: NRC approval of Rules Certifying Two Evolutionary Reactor Designs.
l l
I 1
l
b Re: FOIA 97 384 -
APPENDIX B RECORDS MAINTAINED IN THE PDR UNDER THE ABOVE REQUEST NUMBER N!!MBER' DATE DESCRIPTION /PAGES 1; 3/17/95 Letter to Senator Faircloth from D. Rathbun regarding Proposal to Amend Part 60, w/o enclosures, (1 pg.).
- 2. 3/20/95 Letter to Senator Faircloth from J. Cordes re: General Atomics v.
NRC, (1 pg.).
- 3. 3/20/95 Letter to Senator Faircloth from J. Cordes re: Cajun Electric Power Cooperative, Inc. v. NRC, (1 pg ).
- 4. 3/21/95 Letter to Senator Faircloth from D. Rathbun re: Amendment to Parts 20 and 61, w/ encl., (62 pgs.).
- 5. 4/4/95 Letter to Senator Faircloth from D. Rathbun re: Proposed Amendments to Commission's Regulations, (103 pgs.).
- 6. 4/5/95 Letter to Senator Faircloth from Chairman Selin re: Thank you for Extending Courtesy regarding Chairman Jackson's Nomination, (1 pg )
- 7. 4/25/95 Letter to Senator Faircloth from D. Rathbun re: Notice of Final Rule, w/o encl., (1 pg.).
- 8. 4/26/95 Letter to Senator Faircloth from D. Rathbun re: Petition by American Mining Congress to NRC to Amend relating to inequitable NRC Fees, w/o encl., (1 pg.).
- 9. 5/b/95 Letter to Senator Faircloth from J. Taylor re: Certification of U.S.
Enrichment Corp. Gaseous Diffusion Plants in Paducan, Kentucky and Piketon, Ohio, w/encls., (7 pgs.).
- 10. 5/17/95 Letter to Senator Faircloth from D. Rathbun re: Final Amendment to Commission's Rules, w/ encl., (10 pgs.).
- 11. 6/12/95l Letter to Senator Faircloth from D. Rathbun re: Report on Nondisclosure of Safeguards information for Quarter Beginning 1/1/95. (/,)
.r Re: FOIA-97-384-a? APPENDIX B ~'
LRECORDS MAINTAINED IN THE PDR UNDER THE ABDVF REQUEST NUMBER
.(Continucd)
NUMBER DATE . DESCRIPTION I
l12; .7/5/95 . Letter to Senator Faircloth from D. Rathbun re:- NRC's FY 95 l Second Quarter Base Table, (3 pgs.).
- 13. 11/6/95- Letter to Senator Faircloth from W. Russell re:~ Section 189 of the Atomic Energy Act, w/ encl., (21 pgs.). j 14.' l 2/23/96 - Letter to Senator Faircloth from D. Rathbun re: .NRC's Report to Congress on Abnormal Occurrences, w/o encl., (2 pgs.). .'
l 15. 4/10/96 Letter to Senator Faircloth from D. Rathbun re: The Omnibus Budget Reconciliation Act of 1990, (135 pgs.).
- 16. 5/2/96 Letter to Senator Faircloth from D. Rathbun re: Proposed Amendment to Fitness for Duty Rule, w/ encl., (193 pgs.).
Letter to Senator Faircloth from D. Rathbun re: Federal Advisory
( 17. 5/31/96 Committee Act, w/ encl., (3 pgs.).
- 18. 7/3/96- Letter to Senator Faircloth from D Rathbun re: Final Rule Amending Commission's Erport F.ogulations, w/ encl., (38 pgs.).
1 19, 7/26/96 Letter to Senator Faircleth from D. Rathbun re: Results of NRC
's Fiscal Year 1996 Third Quartet Reprogramming Changes, w/ encl., (2 pgs.).
i 1- 20. 8/1/96 Letter to Senator Faircloth from D. Rathbun re: Proposed Amendment to Commission's Rules, w/ encl., (59 pgs.).
2
- 21. 9/23/96 Letter to Senator Faircloth from J. Taylor, re: Meeting Between NRC and NEl, w/ encl., (96 pgs.).
22, 12/23/96 Letter to Senator Faircloth from D. Rathbun re: Denialof a Petition for Rulemaking, w/ encl., (10 pgs.).
- 23. 12/30/96- Letter to Senator Faircloth from D, Rathbun re: Notice of Withdrawal of Petition for Rulemaking, w/ encl.,'(3 pgs.).
I b
d.
E' -
, , , , , ,-.,,..e. - . . _ ,
Re: -FOIA-97-384 h- AM ENDIX B RECORDS MAINTAINED IN THE PDR UNDER THE ABOVE REQUEST NUMBER (Continued)
NUMBER DATE DESCRIPTION
- 24. 12/30/96 Letter to Senator Faircloth from D. Rathbun re:- Filing of the Required Charters for the Advisory Committee on Reactor Safeguards and the Licensing Support System Advisory Review Panel, w/ encl., (4 pgs.),
- 25. 8/12/97 Letter to Senator Faircloth from Chairman Jackson re: National '
Academy of Sciences, Institute of Medicine report entitled,
' Radiation in Medicine: A Need for Regulatory Reform," w/encls.,
(142 pgs.).
.