From: Brinkman C
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148A597 List:
References
LD-97-014, LD-97-14, NUDOCS 9705090094
Download: ML20148A599 (3)


Text

..

r April 30,1997  ;

LD-97-014 Y

Docket 52-002 diention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

System SJ+ Design Control Document

Reference:

NRC Staff Requirements Memorandum, SECY-96-077, Certification of Two Evolutionary Designs, December 6,1996

Dear Sirs:

This letter transmits the final version of the System 80+ Design Control Document (DCD). This final version conforms with the Commission's guidance for the System 80+

Design Certification Rule (Reference). An affidavit for this transmittal is attached. All pages containing revisions needed to conform to the Commission's guidance are identified with the date (1/97). Please note that each section or chapter of the DCD has an elTective page listing, wherein pages revised since the first printing of the DCD (in December,1994) are identified with the date of revision.

In the process of addressing the Commission's guidance, we confirmed that the ITAAC do cover all structures and systems within the System 80+ design scope.

At the request of the NRC Project Manager, we are transmitting herewith four sets of the DCD in paper form enclosed in notebooks. A fif& set has been shipped directly to the NRC's System 80+ Project Manager at his request. Tour copies of the DCD in compact disk (electronic) fbrm will be provided separately in approximately four to six weeks.

Similarly, three sets of the Combustion Engineering Standard Safety Analysis Report for Design Certification (CESSAR-DC), which has been revised to correspond to the DCD, will be transmitted in approximately six to eight weeks.

9705090094 970507 - * *

  • h*a h.'l.

PDR ADOCK 05200002 E. PDR j ABB Combustion Engineering Nuclear Systems Corntxst an Eng,neenng Inc 2000 Day Hill Road Teiephore (860) 688-191

  • PO flom500 Fe (BCG 285-5203 winor,or. CT OEm5-0500

o .

~'

US NRC LD-97-014 i A liril 30,1997. Page 2 f

.. i

. If you have any questions, please call me or Stanley E. Ritterbusch of my staff at (860) j 285-5206.

l Very truly yours, ]!

a t COMBUSTION ENGINEERING,INC.

I

, f '

Charles B. Brinkman, Director Nuclear Systems Licensing i i

3 Attachments: As Stated ,

Enclosure:

System 80+ Design Control Document i l [24 volumes per set]

4 5

l' 4

t I

s e

i E

i I

.,s e ,

i Attachm'ent to LD-97-014 Docket No.52-002 ,

f UNITED STATES OF AMERICA e NUCLEAR REGULATORY COMMISSION 1 In the Matter of >

3

)

. Combustion Engineering, Inc. )

)

Standard Plant Design )

APPLICATION FOR REVIEW OF

~

COMBUSTION ENGINEERING j 2 13YSTEM 80+ DESIGN CONTROL DOCUMENT" -

Regis A. Matzie, being duly sworn, states that he is the Vice-President, ABB Combustion Engineering Nuclear Systems Engineering, of Combustion Engineering, Inc.; that he is authorized on the part of said corporation to sign and file with the Nuclear Regulatory Commission this document; and that all statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

4 COMBUSTION ENGINEERING, INC.

By: / 'tb a' Regis %. Matzie / #

Vice President ABB Combustion Engineering Nuclear Systems Engineering Subscribed and sworn to befo me this dW4 day of , 1997.

f awaQ l otdry PublVc My Commission Expires: