MONTHYEARML20249C1601998-06-24024 June 1998 Transmits Revised Fda for Sys 80+ Design,Per App O of 10CFR52.Duration of Fda Conforms W/Duration of Design Certification Rule for Sys 80+ Std Design LD-98-009, Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant Ssar Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info1998-03-13013 March 1998 Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant Ssar Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info ML20203J3231997-12-17017 December 1997 First Partial Response to FOIA Request for Documents.Records in App a & B Encl & Will Be Available in PDR ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization LD-97-020, Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl1997-06-13013 June 1997 Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl LD-97-015, Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 19971997-05-0707 May 1997 Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 1997 LD-97-014, Transmits Final Version of Sys 80+ Design Control Document (DCD)1997-04-30030 April 1997 Transmits Final Version of Sys 80+ Design Control Document (DCD) ML20138E0301997-04-25025 April 1997 Informs That Portion of Info in Encl 1 of Vendor 960416 Submittal of Presentation Matl on ABB-C-E Licensing Plan for Full Batch Implementation of Abb Advanced Fuel for Meeting Held on 960416 W/Nrc Will Be Withheld,Per 10CFR2.790 ML20147C0881997-01-23023 January 1997 Responds to Requesting Opportunity to Review Design Certification Rule for Abb Combustion Engineering Sys 80+ Before Sending to Office of Fr for Publication ML20133A9791996-12-18018 December 1996 Approves Rules Certifying Asea Brown Boveri-Combustion Engineering Sys 80+ & General Electric Nuclear Energy Advanced Boiling Water Reactor ML20133A9811996-12-18018 December 1996 Informs That NRC Has Approved Rules Certifying Two Evolutionary Reactor Designs:Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energy ABWR ML20133A9871996-12-18018 December 1996 Informs of NRC Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-CE Sys 80+ & GE Nuclear Energy ABWR ML20133A9901996-12-18018 December 1996 Informs That NRC Has Approved Asea Brown Boveri CE Sys 80+ & GE Nuclear Energy ABWR as Evolutionary Reactor Designs ML20133B0191996-12-18018 December 1996 Informs of Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energys Advanced BWR LD-96-062, Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication1996-12-18018 December 1996 Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication LD-96-060, Forwards Rev to Sys 80+ Std Plant Design Control Document1996-12-13013 December 1996 Forwards Rev to Sys 80+ Std Plant Design Control Document ML20149M3091996-12-10010 December 1996 Responds to Which Requested Status of CESSAR-DC Relative to Fda for Sys 80+ Design ML20129E7111996-10-0101 October 1996 Forward RAI Re CENPD-137,Suppl 2-P, Calculative Methods for Abb CE Small Break LOCA Evaluation Model. Submittal Being Withheld from Public Disclosure Pending Staff Final Determination,Per 960523 Request LD-96-042, Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed1996-09-26026 September 1996 Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking LD-96-029, Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking1996-07-25025 July 1996 Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking LD-96-028, Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages1996-07-17017 July 1996 Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages LD-96-024, Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document1996-06-27027 June 1996 Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document LD-96-021, Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval1996-06-11011 June 1996 Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval ML20107G1451996-04-17017 April 1996 Transmits CEOG Task 931 Survey Questionnaire-CEA Insertion Experience W/High Burnup Fuel Mgt ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations LD-95-026, Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER1995-10-0606 October 1995 Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER LD-95-040, Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package1995-09-0505 September 1995 Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package ML20092D2561995-08-23023 August 1995 Forwards Correction to Comment 20 Re Proposed Design Certification Rules for Standardized Advancement Reactors. Last Line of Text May Have Been Lost Due to Word Processing Error ML20092D2871995-08-23023 August 1995 Forwards Correction to Comment 19 Re Proposed Design Certification Rules for Standardized Advanced Reactors. Last Line on First Page May Have Been Lost Due to Word Processing Error ML20085G2711995-06-14014 June 1995 Proposes to Respond to RAIs on GE TR NEDE-32177P, Tracg Computer Code Qualification, Dtd Jan 1993 in Three Groups as Indicated in Attachment ML20082G5511995-04-10010 April 1995 Provides Documents & Info Requested in NRC Audit (950407- 950410) Re Rv Fabrication ML20203J4371995-04-0404 April 1995 Forwards Fr Notice Re Proposed Amends to Commission Regulations for Commercial Npps,Adding New App a to 10CFR52 Which Will When Promulgated Certify Sys 80+ Std Design of ABWR LD-95-015, Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs1995-03-27027 March 1995 Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs LD-95-013, Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE1995-03-24024 March 1995 Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE LD-95-011, Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page1995-03-17017 March 1995 Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page LD-95-003, Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document1995-03-0303 March 1995 Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document LD-95-007, Forwards Revised Sys 80+ Design Control Document1995-02-22022 February 1995 Forwards Revised Sys 80+ Design Control Document LD-95-006, Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc1995-02-16016 February 1995 Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc LD-95-001, Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design1995-01-0606 January 1995 Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design NRC-94-4383, Comments on Review of Draft NUREG-1512 for Proprietary Info1994-12-27027 December 1994 Comments on Review of Draft NUREG-1512 for Proprietary Info LD-94-072, Provides Justification for Tier 2 Seismic & Valve Testing Expirations1994-12-16016 December 1994 Provides Justification for Tier 2 Seismic & Valve Testing Expirations LD-94-073, Forwards Sys 80+ Design Control Document, Vols 1-241994-12-16016 December 1994 Forwards Sys 80+ Design Control Document, Vols 1-24 LD-94-071, Transmits Addl Input to System 80+ Design Control Document1994-12-15015 December 1994 Transmits Addl Input to System 80+ Design Control Document LD-94-069, Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers1994-12-0808 December 1994 Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers ML20078N8961994-12-0101 December 1994 Forwards Copy of Ltr NFBWR-94-033 ML20149H1941994-11-14014 November 1994 Responds to Indicating Concern Re Application of Set of Interrelated Elements That Defines Technical & Regulatory Aspects of design-basic Accident Source Term for Licensing of Passive Plants LD-94-065, Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule1994-10-28028 October 1994 Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule LD-94-063, Forwards Rev 1 of Technical Support Document for Amends to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design1994-10-10010 October 1994 Forwards Rev 1 of Technical Support Document for Amends to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design 1998-06-24
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARLD-98-009, Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant Ssar Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info1998-03-13013 March 1998 Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant Ssar Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization LD-97-020, Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl1997-06-13013 June 1997 Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl LD-97-015, Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 19971997-05-0707 May 1997 Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 1997 LD-97-014, Transmits Final Version of Sys 80+ Design Control Document (DCD)1997-04-30030 April 1997 Transmits Final Version of Sys 80+ Design Control Document (DCD) LD-96-062, Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication1996-12-18018 December 1996 Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication LD-96-060, Forwards Rev to Sys 80+ Std Plant Design Control Document1996-12-13013 December 1996 Forwards Rev to Sys 80+ Std Plant Design Control Document LD-96-042, Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed1996-09-26026 September 1996 Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking LD-96-029, Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking1996-07-25025 July 1996 Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking LD-96-028, Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages1996-07-17017 July 1996 Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages LD-96-024, Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document1996-06-27027 June 1996 Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document LD-96-021, Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval1996-06-11011 June 1996 Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval ML20107G1451996-04-17017 April 1996 Transmits CEOG Task 931 Survey Questionnaire-CEA Insertion Experience W/High Burnup Fuel Mgt ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations LD-95-026, Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER1995-10-0606 October 1995 Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER LD-95-040, Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package1995-09-0505 September 1995 Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package ML20092D2561995-08-23023 August 1995 Forwards Correction to Comment 20 Re Proposed Design Certification Rules for Standardized Advancement Reactors. Last Line of Text May Have Been Lost Due to Word Processing Error ML20092D2871995-08-23023 August 1995 Forwards Correction to Comment 19 Re Proposed Design Certification Rules for Standardized Advanced Reactors. Last Line on First Page May Have Been Lost Due to Word Processing Error ML20085G2711995-06-14014 June 1995 Proposes to Respond to RAIs on GE TR NEDE-32177P, Tracg Computer Code Qualification, Dtd Jan 1993 in Three Groups as Indicated in Attachment ML20082G5511995-04-10010 April 1995 Provides Documents & Info Requested in NRC Audit (950407- 950410) Re Rv Fabrication LD-95-015, Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs1995-03-27027 March 1995 Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs LD-95-013, Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE1995-03-24024 March 1995 Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE LD-95-011, Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page1995-03-17017 March 1995 Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page LD-95-003, Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document1995-03-0303 March 1995 Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document LD-95-007, Forwards Revised Sys 80+ Design Control Document1995-02-22022 February 1995 Forwards Revised Sys 80+ Design Control Document LD-95-006, Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc1995-02-16016 February 1995 Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc LD-95-001, Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design1995-01-0606 January 1995 Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design NRC-94-4383, Comments on Review of Draft NUREG-1512 for Proprietary Info1994-12-27027 December 1994 Comments on Review of Draft NUREG-1512 for Proprietary Info LD-94-072, Provides Justification for Tier 2 Seismic & Valve Testing Expirations1994-12-16016 December 1994 Provides Justification for Tier 2 Seismic & Valve Testing Expirations LD-94-073, Forwards Sys 80+ Design Control Document, Vols 1-241994-12-16016 December 1994 Forwards Sys 80+ Design Control Document, Vols 1-24 LD-94-071, Transmits Addl Input to System 80+ Design Control Document1994-12-15015 December 1994 Transmits Addl Input to System 80+ Design Control Document LD-94-069, Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers1994-12-0808 December 1994 Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers ML20078N8961994-12-0101 December 1994 Forwards Copy of Ltr NFBWR-94-033 LD-94-065, Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule1994-10-28028 October 1994 Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule LD-94-063, Forwards Rev 1 of Technical Support Document for Amends to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design1994-10-10010 October 1994 Forwards Rev 1 of Technical Support Document for Amends to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design ML20072T2691994-08-30030 August 1994 Advises That Industry Intends to Comment in Opposition to Applicable Regulations Approach & Proposed Text of Applicable Regulations in Design Certification Rulemaking Proceeding for Both ABWR & Sys 80+ LD-94-059, Forwards Draft Notice of Issuance of EA & Draft Fonsi, Together W/Supporting Draft Proposed EA for Consideration,W/ Respect to Draft EA NRC Producing for Proposed Sys 80+ Design Process1994-08-22022 August 1994 Forwards Draft Notice of Issuance of EA & Draft Fonsi, Together W/Supporting Draft Proposed EA for Consideration,W/ Respect to Draft EA NRC Producing for Proposed Sys 80+ Design Process ML20072B9641994-08-12012 August 1994 Requests That Author Name Be Added to Sys 80+ Service List. Author Counsel to Westinghouse in AP600 Design Certification ML20072E3561994-08-0909 August 1994 Requests Addition of Author Name to Sys 80+ Svc List ML20073E1721994-07-25025 July 1994 Forwards Rept Entitled, Analysis of Ex-Vessel Steam Explosions for Combustion Engineering Sys 80+ Using Gtsf Computer Code. Provides Comments on Central,Outer & Multiple Instrument Tube Failures LD-94-054, Forwards Errata to Sys 80+ Certified Design Matl,In Response to Editorial & Word Processing Errors1994-07-21021 July 1994 Forwards Errata to Sys 80+ Certified Design Matl,In Response to Editorial & Word Processing Errors LD-94-052, Requests That Service List for Docket 52-002 Be Updated in Accordance W/Encl Listing,Due to Changes in Position Titles, Affiliations & Organizations.Correspondence on Docket 52-002 Should Be Addressed to Listed Address1994-07-20020 July 1994 Requests That Service List for Docket 52-002 Be Updated in Accordance W/Encl Listing,Due to Changes in Position Titles, Affiliations & Organizations.Correspondence on Docket 52-002 Should Be Addressed to Listed Address LD-94-053, Seeks Confirmation of Vendor Understanding of NRC Fee Regulations in 10CFR170 as Pertaining to Sys 80+ Design Certification Rulemaking as Set Forth in Encl1994-07-20020 July 1994 Seeks Confirmation of Vendor Understanding of NRC Fee Regulations in 10CFR170 as Pertaining to Sys 80+ Design Certification Rulemaking as Set Forth in Encl LD-94-048, Forwards Certified Design Matl Related to Design Reliability Assurance Program & Corresponding Errata Pages for CESSAR-DC (Section 1.0,17.3 & 19.15) Amend W,To Resolve NRC Comments Received by Telcon Over Past Two Wks1994-07-12012 July 1994 Forwards Certified Design Matl Related to Design Reliability Assurance Program & Corresponding Errata Pages for CESSAR-DC (Section 1.0,17.3 & 19.15) Amend W,To Resolve NRC Comments Received by Telcon Over Past Two Wks ML20077F4111994-07-0808 July 1994 Forwards Technical Evaluation Rept Entitled, an Analysis of Core Meltdown Accidents in CE Sys 80+ Plant Using Melcor LD-94-047, Forwards Replacement Page for System 80+ Emergency Operations Guidelines1994-06-28028 June 1994 Forwards Replacement Page for System 80+ Emergency Operations Guidelines LD-94-046, Submits Sys 80+ Design & Operational Features Re Deviations from Regulations1994-06-27027 June 1994 Submits Sys 80+ Design & Operational Features Re Deviations from Regulations LD-94-044, Forwards Revised Combustion Engineering Standard Safety Analysis Rept - Design Certification,Amend W & Affidavit1994-06-20020 June 1994 Forwards Revised Combustion Engineering Standard Safety Analysis Rept - Design Certification,Amend W & Affidavit 1998-03-13
[Table view] |
Text
^
^}
cL- ABB July 20, 1994 LD-94-053 Dockef, No.52-002 Att'.1: Document Control Desk U.S. Nuclear Regulatory Commission fiashington, D.C. 20555
Subject:
NRC's Fee Regulations for Design Certification
Dear Sirs:
ABB Combustion Engineering (ABB-CE) , applicant for NRC approval under Part 52 of System 80+' , a standard evolutionary Advanced Light Water Reactor (ALWR) design, has reviewed NRC's fee regulations in 10 CFR Part 170 as they pertain to the System 80+
design certification rulemaking and understands them as set forth in the attachment to this letter. The purpose of this letter is to obtain your confirmation of our understanding.
Our understanding of these fee regulations was discussed with members of-your staff and the staff of the Office of General Counsel in a meeting at OWFN on June 7, 1994. Representatives of
' Westinghouse Electric Corporation and General Electric Company were also present at that meeting. We are informed that our understanding of the fee regulations is shared by these applicants for design certification of the AP-600 and the ABWR and SBWR designs.
Because we are at a critical juncture-in the schedule for design certification and expect very soon to be issued a Final Design Approval (FDA) for System 80+, your timely confirmition of our understanding will be greatly appreciated.
If you have questions related to this matter please contact me or Mr. Joseph Egan at 202-663-9200.
f 7 l' <
GCs aod ABB Combustion Engineering Nuclear Power $D Cantustm Engnrenng. Inc P.O Box 500 Telephone (203) ft18-1911 I
. tCOO Prospect Hdi Rd f ax (203);.%5203 Wedsor,croruas 9407250204 940720 PDR ADOCK 05200002
.A. PDR
Thank you for your prompt consideration.
Very truly yours, COMBUSTION ENGINEERING, INC.
$ 4M:
C. B. Brinkman Director Nuclear Systems Licensing Attachment cc: Ronald M. Scroggins (NRC)
Irwin (Trip) Rothschild (NRC)
Peter Lang (DOE)
John Trotter (EPRI)
Thomas Wambach (NRC)
" .- . j
)
NRC'S FFR REGULATIONS FOR DESIGN CERTIFICATION ,
Prepared by ABB Combustion Engmeermg, j Applicant for the System 80+ Evolutionary ALWR Standard Design July 1994 Introduction _
ABB-Combustion Engineering (ABB-CE) submitted its original application for i approval of a standardized design for the System 80+ evolutionary Advanced Light Water Reactor (" System 80+"), Docket No.52-002, in 1988. That application, 1 submitted under 10 C.F.R. Part 52, Subpart B, has since undergone extensive review and re-review by ABB-CE and NRC staff. The standardized safety analysis report for i System 80+, CESSAR-DC, now represents some 26 volumes of material, not j including supporting documentation. l Pursuant to NRC's fee regulations under Part 170, as amended in 1991 (ace 56 Fed. Reg. 31472 (July 10,1991)), ABB-CE has paid to NRC millions of dollars in -
fees for NRC Staff's review of the System 80+ application. In 1991, tite Nuclear Management end Resources Council ("NUMARC", now a component of the Nuclear l Energy Institute) supported requests by ABB-CE and the other vendors seeking standardized design approval that fees for NRC Staff review should continue to be ;
deferred, as was then in accordance with the provisions of Psrt 170, until application 1 had actually been received by NRC for a combined construction and operating license
(" COL") under Part 52, Subpart C. M. at 31475. NRC declined, however, to continue to defer vendors' fees. M. at 31476.
The System 80+ design is now completing its final review by NRC, and NRC's schedule for design certification, SECY 94-117, calls io. System 80+ to receive its Final Design Approval ("FDA") no later than Augu41994. Indeed, it presently appears that the FDA may be issued in July.
With the issuance of the FDA, System 80+ will constitute a complete and ,
r.pproved standardized design.
After issuance of NRC's " approval" of the design, any further regulatory review of the System 80+ will necessarily pertain only to.the proposed generic rulemaking for design certification of System 80+ under Part 52, including preparation of the so-called standard " Design Control Document," as well as Staff and -
1-vw-+n--w v er -
-w us Tw-v er r--ww--'
Office of General Counsel ("OGC") review associated with the proposed generic rulemaking processes described in NRC's Advanced Notice of Proposed Rulemaking for the evolutionary designs. Sm Rulemakings to Grant Standard Design Certification for Evolutionary Light Water Reactor Designs,58 Fed. Reg. 58664 (November 3, 1993). The final rule promulgating the certified design will be available to the general I public, and any applicant may reference this design in its application for a COL for building and operating the certified plant. I It is ABB-CE's understanding of the regulations under Part 170 that no further assessment of NRC review fees is to be imposed once A.BB-CE has been issued its FDA.
I Fee Regulations for Standani Designs l With reference to NRC review fees, Part 52 states only that fees are as set forth in Part 170 and are payable in accordance with $ 170.12. 10 C.F.R. 6 52.49. !
Part 170 applies simply to an " applicant for ... standard design certification...." 10 C.F.R. @ ;70.2(g). Under Part 52, however, the " standard design certification" process is divided into two parts -- one the product of intensive interaction between NRC Staff and the vendor leading to an FDA that is owned by the vendor, and the other the product of NRC rulemaking activity leading to a rule applicable to the public generally. Issuance of an FDA constitutes final " approval" of the design by NRC and ;
is a prerequisite for proceeding with design certification rulemaking.10 C.F.R. 6 !
52.43(b) and (c), and Appendix 0.
As explained in the Statement of Considerations accompanying NRC's 1991 Part 170 amendments, Part 170 was intended to limit a vendor's payment of NRC review fees to that period preceding issuance of an FDA. As stated there, NRC 1
The language of Part 170 offers further evidence that NRC intended to distinguish between pre-FDA and post-FDA review periods. In discussing the deferral of " approval fees" incurred prior to the effective da.e of amendments ;
to the Part 170 rule, Sections 170.12(e)(2)(ii)(A) and (e)(2)(ii)(B) distinguish i between two cases, respectively, where, on the one hand, a design "has been I approved but not certified and for which no applicadon for certification is l pending," and where, on the other hand, a design "has been approved and for which an application for certification is pending." In the former case, review I fees are payable within five years of FDA issuance. In the latter case, review l fees are not payable until af1er the certifration is complete. This provision indicates that " approval fees" -- the title of 5170.12(e) -- though payable at (continued...)
explicitly resolved to exclude from Part 170 " generic rulemaking and guidance (e.g.
10 CFR Part 52 and Regulatory Guides) for standard plants and contested hearings."
56 Fed. Reg. at 31476. Upon issuance of the System 80+ FDA, further regulatory review by NRC involving the design wh! pertain only to generic rulemaking and/or contested hearings, as described below.
Generic Rulemaking. NRC's rulemaking for design certification of the System 80+ standard plant is a " generic rulemaking." Once a rule is issued certifying the System 80+ design, applicants for a combined construction and operating license may reference the rule knowing that issues concerning the safety of the design, including radiological issues and specified environmental issues, have previously been
" resolved." Sec 10 C.F.R. 5 52.63(a)(4) and 58 Fed. Reg, at 58666. Unlike the situation existing under the Part 50 nuclear licensing regime, the rulemaking certifying System 80+ is applicable to and can be utilized by a broad variety of COL applicants referencing the plant for many years to come.
" Generic rulemaking" is typically undertaken, as is the case here, to resolve broad issues of general applicability in lieu of individual adjudications, such as those witnessed under Part 50. Sn Weinberger v. Hynson. Westcott. & Dunning,412 U.S.
609, 624-25 (1973); American Commercial Lines v. Louisville and Nashville R.R.,
392 U.S. 571, 591-92 (1968); F.P.C. v. Texaco. Inc., 377 U.S. 33, 42-44 (1964);
United States v. Storer Broadcasting Co.,351 U.S.192 (1955).
Had NRC wished to resolve " generic" issues in the context of individual adjudications, it could well have done so. S.qq Union of Concerned Scientists v. AEC, 499 F.2d 1069 (D.C.Cir.1974). Instead, NRC chose rulemaking to resolve the many generic issues arising from certification of a standard design. Sn Statement of Considerations for Part 52, where NRC noted that "a design certification will, like a rule, have generic application." 54 Fed. Reg. 15372,15375 (April 18,1989).
In the words of the rule itself:
Standard design means a design which is sufficiently detailed and complete to support certification in accordance with subpart B of this part, and which is usable for a multiple number of units or at a muhiple number of sites without reooening or repeating the review.
'(... continued) different times, accrue in both cases only through " approval" (Lg , issuance of the FDA).
l 10 C.F.R. 52.3(c) (emphasis added). NRC's rulemaking for the standard design i accomplishes the stated objective and is therefore " generic" with respect to the design. j The history of the adoption of Part 52 supports the generic nature of the design ,
certification rulemaking. NRC's proposed rule provided for certification by I rulemaking. 53 Fed. Reg. 32060, 32064 (August 23,1988). Various commenters argued that design certification should also be accomplishable by license. Some argued that the applicant for design certification should have the option of proceeding ,
either by rulemaking or by licensing. Se, g, comment filed by Westinghouse !
I Electric Corporation to Samuel J. Chilk (NRC), November 7,1988. Other commenters, such as NUMARC, endorsed standardized design certification by !
rulemaking, but also urged that the proposed rule be amended to provide the holder of !
a certified design with the procedural protections afforded to NRC licensees. 54 Fed. j Reg.15372,15375 (April 18,1989).
The Commission rejected those proposals in its final rule. Section 52.51 I prescribed rulemaking as the sole procedure for standardized design certification. M. l at 15391. Importantly, moreover, whereas the proposed rule referred to the " holder I of a design certification," the Commission eliminated all such references to the
" holder" in its final rule. The certified design, in the form of a Commission rule, will be available for implementation by qualified organizations other than the design ;
certification applicant; indeed, Q 52.47 provides that "any person" (rather than just the
" holder," as in the proposed rule) could apply for renewal of the certification. Id. at 15392. Note, in contrast, the continuing reference to EDA " holder" in Appendix 0 to Part 52. Moreover,10 C.F.R. 6 52.73 provides that upon an appropriate demonstration of qualifications, NRC will issue a COL where the applicant is using a ;
vendor other than the vendor that sponsored the design certification. l l
The Commission's comments regarding the final Part 52 rule likewise reflect an intent to make the design certification process truly " generic." The Commission
' declared that the " design certification will, like a rule, have generic. application," id.
at 15375, and made it clear that it did not consider a rule certifying a design as belonging solely to the designer. Thus, one. of the basic rights of ownership -- the right to transfer property -- did not exist for the entity which had secured the design certification:
. .[A] rule certifying a design does not, strictly speaking, belong to the designer. Therefore, such a rule cannot be transferred or revoked by adjudicatory enforcement.
Id. See also, id. at 15382-83.
)
l
In sum, the history of Part 52 establishes that the design certification rulemaking process is indeed " generic" by any accepted definition of that term, and that the benefits of the certification rulemaking were intended by NRC to inure to the public generally, and not just to the design certification applicant.
Contested Hearings. The System 80+ rulemaking is exempted from Part 170 i fees on the grounds that this rulemaking will, as well as being generic, constitute a
" contested hearing."
NRC's rulemaking for design certification of the System 80+ will constitute a ,
" contested hearing," whether formal or informal, or if only by virtue of comments l expected to be filed that may oppose one or more of the many aspects of NRC's approval of the standard design. Sec 10 C.F.R. % 52.51(b); SECYs92-287 (August 18,1992) and 92-287A (March 26,1993), and SRMs on SECYs92-287 and 92-287A dated September 30,1992 and June 23,1993, respectively.
Under the Administrative Procedure Act, even notice and comment rulemaking constitutes a " hearing." United States v. Florida East Coast Railway,410 U.S. 224 (1973). Although the law does not provide a precise delineation of the meaning of the l word " contested," it is likely that the System 80+ design certification will be
"' contested" by one or more commenters on one or more issues. It is also possible l that individual utilities or other industry entities may take issue with one or more of I the policy decisions applicable to System 80+ that were required by the NRC. Here, moreover, the applicable rulemaking procedures go well beyond NRC's traditional rulemaking processes in affording those who would contest the certification opportunities to do so -- both in the number of possible opportunities and in the possible levels of formality that may be obtained. Sec SECY's92-287 and 92-287A.
Proposed New Amendments to Part 170 In proposed new amendments to Part 170 issued on May 10,1994,50 Fed. l Reg. 24069, NRC clarified its view that fees incurred to support NRC's " development i of generic guidance and regulations (e.g. rules, regulatory guides, and policy statements) and resolution of safety issues applicable to a class oflicensee such as those addressed in generic letters should not be assessed under Part 170." Id. at 24067, 24069. Although the relevant proposed amendments deal with NRC's I definition of "special projects" exempt from fees, they nevertheless confirm NRC's general policy, articulated in the Statement of Considerations accompanying the 1991 amendments to Part 170, not to assess Part 170 fees for generic rulemaking activities I l
and other generically applicable endeavors.
I i
Conclusion Unlike issuance of an FDA, the benefits of which, in the absence of a referencing COL application, appear to inure principally to the FDA's " holder,"
issuance of the System 80+ final design certification rule will clearly bestow a benefit upon the public generally by providing an advanced evolutionary standardized design certification available for reference by a broad variety of COL applicants now or in the future. That rule, moreover, will have resolved the principal safety issues assmiated with the standard design, including radiological and specified environmental issues, for all plants of the referenced design.
For all the above reasons, ABB-CE understands that Part 170 does not provide for the imposition of NRC review fees for System 80+ design certification rulemaking, and that review fees for System 80+ will cease to accrue to ABB-CE upon issuance by NRC of the FDA for the standard design. Your confirmation of our understanding will be greatly appreciated.
Respectfully submitted, Yl L
- Charles B. Brinkman Director, Nuclear Systems Licensing I