LD-94-073, Forwards Sys 80+ Design Control Document, Vols 1-24

From kanterella
Jump to navigation Jump to search
Forwards Sys 80+ Design Control Document, Vols 1-24
ML20149H560
Person / Time
Site: 05200002
Issue date: 12/16/1994
From: Brinkman C
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20149H561 List:
References
LD-94-073, LD-94-73, NUDOCS 9412280070
Download: ML20149H560 (2)


Text

',7  :.

ABB l

December 16,1994 LD-94-073 Docket No.52-002 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

System 80+" Des.*gn Contml Document

References:

1. ABB-CE Letter LD-94-063, dated October 10,1994
2. ABB-CE Letter LD-94-069, dated December 8,1994
3. ABB-CE Letter LD-94-071, dated December 15,1994

Dear Sirs:

This letter transmits the Combustion Engineering System 80+' Design Control Document (DCD) and an affidavit. This DCD is based on the Combustion Engineering Standard Safety Analysis Report for Design Certification (CESSAR-DC) with revisions through Amendment W, the System 80+ Certified Design Material, the System 50+ Emergency Operations Guidelines, and supplemental material submitted in References 1,2, and 3. This supplemental material includes changes agreed upon with the NRC Staff for the development of the System 80+ DCD, a design change (Reference 2),

significant editorial changes, and minor technical consistency corrections. Minor editorial revisions such as spelling corrections and format changes (e.g., using bullets to identify lists) have been described generally to the NRC Project Managers but have not been transmitted formally. There have been no other changes in the development of this DCD.

If you have any questions, please call me or Mr. Stanley Ritterbusch of my staff at (203) 285-5206.

Very truly yours, COMBUSTION ENGINEERING, INC.

~

C. B. Brinkman Director Nuclear Systems Licensing l CBB/vp *

Enclosure:

System 80+ Design Control Document

[24 volumes per set] j

/ .,

hCS h:

ABB Combustion Engineering Nuclear Power L

ggj Comtwon Engenng. Mc. P.O hm 600 Telechone (M3) 688-1911 [

9412280070 941216 E', *cIN[

PDR ADOCK 05200002 A PDR

Docket No.52-002 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of: )

)

Combustion Engineering, Inc. )

)

Standard Plant Design )

APPLICATION FOR REVIEW OF "SYST "

Regis A. Matzie, being duly sworn, states that he is the Vice President, ABB Combustion Engineering Nuclear Systems Engineering, of Combustion Engineering, Inc.; that he is authorized on the part of said corporation to sign and file with the Nuclear Regulatory Commission this document; and that all statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief. ,

COMBUSTION ENGINEERING, INC.

l By: _ .h -

Regis vA. Matzie U

)

Vice President ABB Combustion Engineering Nuclear Systems Engineering Subscribed and sworn to before me this //s M day of []/>e , 1994.

aD.

chary Pub %t'c laLt My Commission Expires: W.3/,9 9 t