LD-98-009, Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant Ssar Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info

From kanterella
Jump to navigation Jump to search
Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant Ssar Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info
ML20216F552
Person / Time
Site: 05200002
Issue date: 03/13/1998
From: Brinkman C
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216F556 List:
References
LD-98-009, LD-98-9, NUDOCS 9803180442
Download: ML20216F552 (2)


Text

" "- " ' " ' ' " - -

l, f ?

p x.

March 13 ,1998 LD-98-009 nocket 52-002 Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Combustion Engineering Standard Safety Analysis Report - Design Certification (CESSAR-DC), Amendment X

Dear Sirs:

This letter transmits three (3) copies of Amendment X to CESS AR-DC, the System 80+* Standard Plant Standard Safety Analysis Report. Amendment X makes CESSAR-DC consistent with the latest version of the Design Control Document (DCD) which has been certified in 10 CFR 52 Appendix B. The enclosed copies of CESSAR-DC have Amendment X incorporated, and are complete replacements for the existing version of CESSAR-DC. An affidavit for this tot :ittal is attached.

Amendment X is essentially a reprint of CESSAR-DC that incorporates revisions made to the Approved Design Material in the DCD during the Design Certification process. For tbc most part, CESSAR-DC was reprinted using the DCD clectronic files to make the format of CESSAR-DC and the DCD as consistent as feasible. All CESSAR-DC pages are designated Amendment X, except for the following:

  • CESSAR-DC Chapter 19, Probabilistic Risk Assessment,is much more extensive than DCD Chapter 19. Therefore, CESSAR-DC Chapter 19 was not reprinted in its entirety. Only the pages affected by DCD changes were revised and designated Amendment X; ' ' '

e CESSAR-DC Chapter 16, Technical Specifications. was not reprinted in its

- entirety. Only the few pages affected by DCD changes were revised and y' 10 .

" l g' designated Amendment X; The only 11x17 figures that were reprinted were those that required revision due to DCD changes. The revised CESSAR-DC 1lx17 figures are designated dj fy Amendment X.

ABB Combustion Engineering Nuclear Systems OY g $

Combustion Engineennu he. 2000 Day Hdl Road Telephone (860) 6fi8-1911 "9 Box M0 Fax (800) 285-5203 , t 9903190442 990313 esc.. c: oces es y

^ p

p. . .

P . .. .

LD-98-009

.bNNRC March 13,1997 Page 2 l,

If you have any questions, please call me or George Hess of my staff at (860) 285-5218.

l l Very truly yours, COMBUSTION ENGINEERING, INC.

.b $W g Charles B. Brinkman, Director Nuclear Licensing ec: J. Wilson (NRC)

Attachments: As stated

Enclosure:

As stated b

- ' . _ . _ . . . . .