Text
,
- <t-
=u ABB
- ASEA BROWN DOVERI i
October 3, 1990-LD-90-075:
4 Project No..675 Mr.: Thomas V.-Wambach, Project-Manager Division of Reactor Projects III/IV/V and Special' Projects Officecof Nuclear Reactor Regulation U.
S.
Nuclear Regulatory Commission i
Attn: ' Document-Control Desk Washington, D.
C.
20555 i
Subject:
Combustion Engineering Standard Safety Analysis Report - Design Certification, Amendment H t
Reference:
Letter'LD-89-035, A. E. Scherer (C-E) to T. E.
.Murley (NRC), dated March 30, 1989
Dear Mr. Wambach:
This' letter transmits an advance copy of. Amendment H.to_the-Combustion Engineering Standard Safety. Analysis Report -
Design Certification (CESSAR-DC).
Our-application for design certification was submitted via the reference-letter.
l For your convenience, we have summarized-the contents of-H
-Amendment H in Enclosure I.
This-copy of Amendment-H-l~
_(Enclosure II) is prov.ided for your information and planning i
purposes..The formal amendment is currently.being printed
-and, together with the affidavit required by 10 CFR 50.4(b) and 10:CFR 50.30(b), will be submitted in approximately one o
l month.
k b Dks\\
ABB Combustion Engineering Nuclear Power
..._.._~;,...._......--._.____
., c 4 j, q Ccumuon Ergneerity inc o es <
1000 Papect Kit Rmd Teephone (203) 680191i ts Post Ot!ce B0x 500 Fa < (203) 285 0512 901012O205 901003 P
W a1*' connectcu cco n osco tem 09297 coMnen wsoe
.PDR, PROJ
'675K PDC
Mr. Thomas V. Wambach LD-90-075 October 3, 1990 Page 2
.If you have any questions, please feel free to call me or Mr.
S. E.
Ritterbusch of my staff at (203) 285-5206.
Sincerely yours, COMBUSTION ENGINEERING, INC.
7
'W E. H. Kennedy Manager Nuclear Systems Licensing EHK:lw
Enclosures:
As Stated cc:
C. L. Miller (NRC) w/o encl.
T.
E.
Murley (NRC) w/o encl.
F. W. Ross (DOE - Germantown)
G. L. Vine (EPRI)
Enclosure I to LD-90-075
SUMMARY
OF CESSAR-DC. AMENDMENT H Chapter 1 (General Arranaements The reactor building arrangement drawings of Section 1.2 have been replaced with general arrangement drawings for the site layout, reactor building, and the reactor building nuclear annex.
Chapter 2 (Site Characteristics) 1.
Restrictions on site selection have been added to preclude certain external events (e.g., aircraft hazards).
2.
Section 2.3 has been modified to include the site envelope for radiological release dispersion (i.e.,
X/Qs).
Chanter 6 (Encineered Safety Features 1.
The small break LOCA and long-term cooling analyses have been added to Section 6.3.
2.
Inservice inspection guidelines have been provided in Section 6.6.
Chaoter 14 (Startu.p Testinal The startup test program has been expanded to cover the
" balance-of-plant".
Some changes have also been made to the test program for the nuclear steam supply system.
Chapter 15 (Safety Analysis) l The design-basis safety analyses have been provided.
ADoendix B (Probabilistic Risk Assessment Level II and III PRA results have been added.
A concise summary of the PRA will be provided in the next amendment to CESSAR-DC (December 1990).