L-2004-226, September 2004 Monthly Operating Report for Turkey Point Units 3 and 4

From kanterella
(Redirected from L-2004-226)
Jump to navigation Jump to search
September 2004 Monthly Operating Report for Turkey Point Units 3 and 4
ML042940497
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/13/2004
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2004-226
Download: ML042940497 (3)


Text

OCT 1 3 2004 FPL L-2004-226 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - September 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the September 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, vla*

Terry OJoh(es Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 10/06/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period September. 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 . 4 >

Maximum Dependable Capacity (MWe-Net) 693 -

Month Year-to-date Cumulative No. of hours reactor was critical 614.1 6469.1 209002.3 No. of hours generator was on line (service hours) 614.1 6396.7 206537.2 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 416568 4463145 135267790 UNIT SHUTDOWNS No. Date Type Duration I Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20040019 9/26/04 S 105.9 C 1 REFUELING (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator TrainingfLicense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summarv Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of September, 2004, until the unit was shutdown for a scheduled refueling outage on September 26, 2004. Unit 3 was ramped down and manually tripped in accordance with plant procedures from approximately 30% power to commence the Cycle 21 refueling outage.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 10/06/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period September, 2004 Design Electrical Rating (MWe-Net) 720 - -,

Maximum Dependable Capacity (MWe-Net) 693 _-i--;  ;-- .-  :; .

Month Year-to-date Cumulative No. of hours reactor was critical 720 6533.9 205953.7 No. of hours generator was on line (service hours) 720 6480.5 201458.9 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 504329 4523750 133045318 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operatincg Experience Unit 4 operated at essentially 100% power for the month of September, 2004

Text

OCT 1 3 2004 FPL L-2004-226 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - September 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the September 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, vla*

Terry OJoh(es Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 10/06/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period September. 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 . 4 >

Maximum Dependable Capacity (MWe-Net) 693 -

Month Year-to-date Cumulative No. of hours reactor was critical 614.1 6469.1 209002.3 No. of hours generator was on line (service hours) 614.1 6396.7 206537.2 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 416568 4463145 135267790 UNIT SHUTDOWNS No. Date Type Duration I Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20040019 9/26/04 S 105.9 C 1 REFUELING (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator TrainingfLicense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summarv Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of September, 2004, until the unit was shutdown for a scheduled refueling outage on September 26, 2004. Unit 3 was ramped down and manually tripped in accordance with plant procedures from approximately 30% power to commence the Cycle 21 refueling outage.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 10/06/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period September, 2004 Design Electrical Rating (MWe-Net) 720 - -,

Maximum Dependable Capacity (MWe-Net) 693 _-i--;  ;-- .-  :; .

Month Year-to-date Cumulative No. of hours reactor was critical 720 6533.9 205953.7 No. of hours generator was on line (service hours) 720 6480.5 201458.9 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 504329 4523750 133045318 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operatincg Experience Unit 4 operated at essentially 100% power for the month of September, 2004