ML041410315
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/13/2004
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2004-106
Download: ML041410315 (3)


Text

MAY 13 2004 FPL L-2004-106 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - April 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the April 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry O. Jo s Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 05/04/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period April, 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 __ ;____________--_

Maximum Dependable Capacity (MWe-Net) 693 ___, _>,_+ _.___:

Month Year-to-date Cumulative No. of hours reactor was critical 719 2903 205436.2 No. of hours generator was on line (service hours) 719 2903 203043.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 514477 2094422 132899067 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/LUcense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of April 2004.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 05104/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period April, 2004 Design Electrical Rating (MWe-Net) 720 l Maximum Dependable Capacity (MWe-Net) 693 .. _--:_- ... -.

Month Year-to-date Cumulative No. of hours reactor was critical 719 2903 202322.8 No. of hours generatorwas on line (service hours) 719 2903 197881.4 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 514706 2095150 130616718 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summarv Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of April 2004.