Text

0FPL f0014 10o '%

L-2002-107 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - May 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the May 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, John P. McElwain Vice President Turkey Point Plant SM Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 6/4/2002 COMPLETED BY: Stavroula Mihalakea TELEPHONE: (305) 246-6454 Reporting Period May, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 744 3623 189402.8 No. of hours generator was on line (service hours) 744 3623 187071.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 530248 2582137 121725784 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% for the month of May 2002.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 6/4/2002 COMPLETED BY: Stavroula Mihalakea TELEPHONE: (305) 246-6454 Reporting Period May, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month

-t 3256.2 186225.71 144 No. of hours generator was on line (service hours) 744 3247.5 181822.6 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) J 512399 2259525 119364536 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)

E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operatina Experience Unit 4 operated at essentially 100% for the month until May 17, 2002 when power was reduced to 20% to repair the 4B CRDM cooling fan. Power was subsequently returned to 100% on May 19, 2002 and remained at essentially 100% for the rest of the month.