IR 05000395/2014009; 07201038/2014002; on 10/20/2014 - 10/24/2014: Virgil C. Summer Nuclear Station, Unit 1; Fuel Handling Crane Inspection Report
ML14325A539
Person / Time
Site: Summer, 07201038  South Carolina Electric & Gas Company icon.png
Issue date: 11/21/2014
From: Kowal M G
NRC/RGN-II/DRS/EB3
To: Gatlin T D
South Carolina Electric & Gas Co
Linda K. Gruhler 404-997-4633
References
IR 14002, IR 14009
Download: ML14325A539 (11)


Text

November 21, 2014

Mr. ThomasVice President - Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065

SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT OF FUEL HANDLING CRANE FOR USE DURING INDEPENDENT SPENT FUEL STORAGE INSTALLATION ACTIVITIES - 05000395/2014009 AND 07201038/2014002

Dear Mr. Gatlin:

On October 24, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Virgil C. Summer Nuclear Station, Unit 1, of the fuel handling crane which will be used during Independent Spent Fuel Storage Installation (ISFSI) activities. On that day, the NRC inspector discussed the results of this inspection with Mr. Larry Bennett and members of your staff. The inspection was conducted in accordance with Inspection Procedure (IP) 60854, "Preoperational Testing of Independent Spent Fuel Storage Installations at Operating Plants," and covered aspects associated with the preparation of the crane to move spent fuel into the ISFSI facility, and consisted of field observations, extensive examination of procedures and documents, and interviews with personnel. The enclosed report presents the results of the inspection. No NRC-identified or self-revealing findings were identified during the inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public inspections, exemptions, requests for withholding," of the NRC's "Rules of Practice," a copy of this letter, its Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS)component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Mark G. Kowal, Acting Chief Engineering Branch 3 Division of Reactor Safety

Docket Nos. 50-395 and 72-1038 License No. NPF-12

Enclosure:

IR 05000395/2014009 and 07201038/2014002

w/Attachment:

Supplementary Information cc: Distribution via Listserv

SUMMARY

Inspection Report (IR) 05000395/2014009; 07201038/2014002; 10/20/2014 - 10/24/2014: Virgil C. Summer Nuclear Station, Unit 1; Fuel Handling Crane Inspection Report

This report covers a 1-week period of inspection by a senior reactor inspector from the Region II office. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process."

A. NRC-Identified and Self-Revealing Findings No findings were identified.

B. Licensee-Identified Violations

None.

REPORT DETAILS

Summary of Plant Status Unit 1 operated at Rated Thermal Power during the period of this inspection.

Management of the Virgil C. Summer Nuclear Station, Unit 1, selected the HI-STORM (Holtec International STORage Module) FW (Flood and Wind) dry cask storage system for spent fuel storage at the onsite Independent Spent Fuel Storage Installation (ISFSI). The system is licensed by the U.S. Nuclear Regulatory Commission as Certificate of Compliance (CoC) No. 1032, Amendment 0.

The Virgil C. Summer ISFSI consists of a 36-inch thick concrete pad on which several vertical concrete casks (the HI-STORM FWs) are placed. The HI-STORM FW casks serve as an overpack for the multi-purpose canisters (MPCs), which contain the spent fuel. Each MPC can store up to 37 pressurized water reactor fuel assemblies. During transfer operations and during the drying, helium backfilling, and welding of the MPC; the MPC is placed into a transfer cask (designated as the HI-TRAC VW) to provide shielding for protection of personnel. The MPC is loaded with spent fuel, drained of water, vacuum dried, filled with helium gas, and sealed by welding while in the HI-TRAC VW. Upon completion of the welding, the HI-TRAC VW (loaded with the MPC) is then moved from the cask handling facility (CHF) and placed on top of the HI-STORM FW in the "stackup" configuration, and the MPC is transferred from the HI-TRAC VW into the HI-STORM FW. The loaded HI-STORM FW is subsequently conveyed to the ISFSI pad via the Vertical Cask Transporter (VCT).

Procedures governing the lifting of heavy loads incorporated requirements specified in NRC regulations and industry standards. Controls governing the lifting, handling, and movement of heavy loads were addressed in approved procedures. Maintenance and testing activities for the Fuel Handling Crane, to ensure the ability of the equipment to safely handle anticipated loads, were performed and documented in accordance with approved procedures. Crane operators were qualified per industry standards and the associated documentation was available for verification.

OTHER ACTIVITIES

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity, Emergency Preparedness, Public Radiation Safety, and Occupational Radiation Safety

4OA5 Other Activities Preoperational Testing of an Independent Spent Fuel Storage Installation

a. Inspection Scope

The NRC inspector reviewed the licensee's implementation of the control of heavy loads program for independent spent fuel storage installation (ISFSI) operations, including procedures and inspection, testing, and maintenance documentation associated with the crane, wire rope, slings, etc. The inspector also reviewed the responsibilities for employees, including operators and riggers, who participate in the lifting process, including personnel training and planning of lifts.

The inspector verified that the licensee had modified its fuel handling crane by installing a new trolley to upgrade the crane to single-failure proof, and that the modified fuel handling crane was certified and documented by the manufacturer to conform to the requirements of NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants," and NUREG-0554, "Single-Failure-Proof Cranes for Nuclear Power Plants." The inspector reviewed the results of the licensee's functional tests to verify compliance with the NUREG requirements, and noted that the crane retained its original 125-ton capacity.

The inspector also reviewed the results of the Factory Acceptance Test (FAT) and selected crane design features for compliance to the NUREG requirements, and determined that, for those features reviewed, the crane met the single-failure proof criteria established by the NRC. The inspector noted that the crane, slings, and wire rope had been load tested, and operated in accordance with the applicable American Society of Mechanical Engineers (ASME) Code, ASME B30.2-2005 "Overhead and Gantry Cranes," ASME B30.9-2006, "Slings," NUREG-0554, and NUREG-0612. The inspector reviewed work orders associated with the loading and functional testing of special lifting devices used for ISFSI activities, and determined that the crane, hooks, and wire rope were inspected, tested, and maintained in accordance with the ASME Code, NUREG-0554, NUREG-0612, and the crane manufacturer's recommendations. The inspector walked down the fuel handling building to directly observe the material condition of the crane and its components (bridge, trolley, rails, limit switches, rail stops, etc.), and interviewed the ISFSI Program Manager to discuss the planned sequence to be employed during the MPC loading and transfer activities, in and around, the fuel handling building. The inspector also interviewed the Crane Maintenance Supervisor to verify that the crane inspection, maintenance, and testing programs were in accordance with ASME and NUREG requirements, and that crane operators meet the qualifications required by the ASME Code and have been trained to carry out the ISFSI operations. The inspector reviewed records of crane inspections, maintenance, and testing, as well as records of crane operator qualifications for compliance to Code standards.

b. Findings

No findings were identified.

4OA6 Meetings, Including Exit

On October 24, 2014, the inspector presented the inspection report results to Mr. Larry Bennett and other members of the licensee staff. The licensee acknowledged the results of these inspections. The inspector confirmed that inspection activities discussed in this report did not contain proprietary material, and all proprietary material was returned to the licensee.

ATTACHMENT:

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

J. Andrescavage, ISFSI Program Manager
R. Antonow, CBI/ISFSI Project Manager
L. Bennett, Manager, Project Management Organization
T. Johnson, Manager, Outage Management
R. Russell, SCE&G Design Engineering
T. Stewart, Nuclear Licensing Engineer
R. Sturkie, Maintenance Supervisor
B. Thompson, Manager, Nuclear Licensing
S. Zarandi, General Manager, Nuclear Support Services NRC
J. Reece, V. C. Summer Senior Resident Inspector

LIST OF ITEMS OPENED, CLOSED, DISCUSSED AND UPDATED

Opened

None

Closed

None

Discussed

None

LIST OF DOCUMENTS REVIEWED

Section 4OA5: Other Activities

Licensee Documents

Calculations

DC01600-027, Comparison to NUREG 0612 for XCR0003 (Auxiliary Hoist), Revision 2 DC01600-028, Comparison to NUREG 0612 for XCR0003 (Main Hoist), Revision 2 DC01600-029, NUREG 0554 Compliance Matrix for XCR0003 (Main Hoist), Revision 0

Condition Reports

CR-12-00516, Delivery of Replacement FHB Overhead Crane Trolley Was in Jeopardy Due to Welding Issues
CR-13-02951, FHB Crane Main Hoist Cables Found to be Over 75 Feet Longer than Required
CR-13-02972, QC Identified that the Installation of Wire Rope for XCR0003 Auxillary Hoist Was Not in Accordance with
ECR 50717 Drawing Number S-07463354-D

Drawings

1MS-20-718, SH1, XCR003, Sketch 20, Rev. B, Page 5.0-24 (PaR, Inc. Drawing A-07452503-D, Frame; (SR) Trolley Fabrication & Machining (125/15 Ton Capacity), Sheet 1 of 7,
Revision 01
1MS-20-718, SH2, XCR003, Sketch 21, Rev. B, Page 5.0-25 (PaR, Inc. Drawing A-07452503-D, Frame; (SR) Trolley Fabrication & Machining (125/15 Ton Capacity), Sheet 2 of 7,
Revision 01 1MS-20-718, SH3, XCR003, Sketch 22, Rev. B, Page 5.0-26 (PaR, Inc. Drawing A-07452503-D, Frame; (SR) Trolley Fabrication & Machining (125/15 Ton Capacity), Sheet 3 of 7, Revision 01) 1MS-20-718, SH4, XCR003, Sketch 23, Rev. B, Page 5.0-27 (PaR, Inc. Drawing A-07452503-D, Frame; (SR) Trolley Fabrication & Machining (125/15 Ton Capacity), Sheet 4 of 7, Revision 01 1MS-20-718, SH5, XCR003, Sketch 24, Rev. B, Page 5.0-28 (PaR, Inc. Drawing A-07452503-D, Frame; (SR) Trolley Fabrication & Machining (125/15 Ton Capacity), Sheet 5 of 7, Revision 01 1MS-20-718, SH6, XCR003, Sketch 25, Rev. B, Page 5.0-29 (PaR, Inc. Drawing A-07452503-D, Frame; (SR) Trolley Fabrication & Machining (125/15 Ton Capacity), Sheet 6 of 7, Revision 01 1MS-20-718, SH7, XCR003, Sketch 26, Rev. B, Page 5.0-30 (PaR, Inc. Drawing A-07452503-D, Frame; (SR) Trolley Fabrication & Machining (125/15 Ton Capacity), Sheet 7 of 7, Revision 0) 1MS-20-719, SH1, XCR003, Sketch 27, Rev. B, Page 5.0-31 (PaR, Inc. Drawing A-07452505-D, Trolley; Structure Assembly, Sheet 1 of 1, Revision 03) 1MS-20-725, XCR003, Sketch 69, Page 5.0-73 (PaR, Inc. Drawing P-07463100-D, Arrangement; Hook Coverage, V. C. Summer Cask Crane SFP Trolley Replacement, Sheet 1 of 1, Revision 0 1MS-20-745, SH1, XCR003, Sketch 114, Page 5.0-118 (PaR, Inc. Drawing A-07463220-D, Assembly; Trolley Travel Limit Switch & Bumper Stop, Sheet 1 of 2, Revision 02 1MS-20-745, SH2, XCR003, Sketch 115, Page 5.0-119 (PaR, Inc. Drawing A-07463220-D, Assembly; Trolley Travel Limit Switch & Bumper Stop, Sheet 2 of 2, Revision 02 1MS-20-751, XCR003, Sketch 130, Page 5.0-134 (PaR, Inc. Drawing I-07463104-D, Interface; Seismic Uplift Restraint, Sheet 1 of 1, Revision 0 1MS-20-811, SH1, XCR003, Sketch 218, Page 5.0-221 (PaR, Inc. Drawing A-07463310-D, Hoist; Main Assembly, Sheet 1 of 2, Revision 02 1MS-20-811, SH2, XCR003, Sketch 219, Page 5.0-222 (PaR, Inc. Drawing A-07463310-D, Hoist; Main Assembly, Sheet 2 of 2, Revision 02 1MS-20-812, SH1, XCR003, Sketch 222, Page 5.0-226 (PaR, Inc. Drawing A-07463320-D, Assembly; (SR) Drum Brake, Main Hoist Cask Crane, Sheet 1 of 1, Revision 0 1MS-20-813, SH1, XCR003, Sketch 225, Page 5.0-228 (PaR, Inc. Drawing A-07463345-D, Assembly; Weighted Limit Switch, Main Hoist, Sheet 1 of 1, Revision 0 1MS-20-814, SH1, XCR003, Sketch 227, Page 5.0-230 (PaR, Inc. Drawing A-07463347-D, Assembly; Electrical Reel Hook Rotate, Main Hoist, Sheet 1 of 1, Revision 0 1MS-20-815, SH1, XCR003, Sketch 229, Page 5.0-232 (PaR, Inc. Drawing A-07463350-D, Assembly; Upper Block and Equalizer, Sheet 1 of 1, Revision 0 1MS-20-817, SH1, XCR003, Sketch 233, Page 5.0-236 (PaR, Inc. Drawing A-07463360-C, Assembly; Turnaround Sheave, Sheet 1 of 1, Revision 0
1MS-20-847, SH1, XCR003, Sketch 308, Page 5.0-34 (PaR, Inc. Drawing D-07452385-D, Hook; (SR) Lower Block, Sheet 1 of 1, Revision 01
Specifications Engineering Services Specification
SP-514, Reactor and Fuel Handling Building Cranes, Revision 0C Engineering Services Specification
SP-0973, Fuel Handling Building Crane Upgrade, Revision 1A

Procedures

Electrical Maintenance Procedure (EMP)-165.002, Fuel Building Crane Preventative Maintenance, Revision 7 General Maintenance Procedure (GMP)-100.026, Crane Operations and Rigging, Revision 4 Change E
GMP-102.001, Primary Inspection of Rigging Equipment, Revision 9, Change B Mechanical Maintenance Procedure (MMP)-160.001, Fuel Transfer Gate Movement and Maintenance, Revision 9, Change B
MMP-165.005, Static and Dynamic Load Testing of Miscellaneous Hoist, Cranes and Lifting Devices, Revision 11
MMP-165.007, Fuel Handling Building Crane XRC0003 Maintenance, Revision 10

Work Orders

WO 1109274-002, Perform Electrical Inspection of Fuel Handling Building 125-Ton / 25-Ton / Aux 3-Ton Crane XCR0003
WO 1109297-001, Periodic Inspection of Fuel Handling Building Crane XCR0003
WO 1109297-002, Perform NDE on Hook
WO 1314374-006, Perform 125% Load Test on the Main Hoist Crane
WO 1316237-001, Perform Periodic Inspection and Annual NDE of FHB Crane 3-Ton Hoist IAW
MMP-165.007
WO 1316237-002, Perform Annual NDE of FHB Crane 3-Ton Hoist Hook IAW
QSP-504
WO 1413685-001, Periodic Inspection of FHB Crane, Inspect IAW
MMP-165.007
WO 1413685-002, Perform Annual NDE of FHB Crane Hooks

Other Documents

Reviewed Engineering Change Request (ECR) 50717, Fuel Handling Building (FHB) Crane Upgrade, dated August 24, 2012
ECR 50717A, FHB Crane Upgrade, dated January 18, 2013
ECR 50717C, FHB Crane Upgrade, dated June 12, 2013
Engineering Services Technical Report
TR 03920-003, Fuel Handling Building Crane Upgrade Plan, Revision 0 Technical Report TR03920-002, Control of Heavy Loads at Virgil C. Summer Nuclear Station, Revision 9 Technical Report TR03920-004 Fuel Handling Building Crane Hook Approach and Trolley Clearance Verification, Revision 0 Technical Report TR03920-005, FHB Crane Cold Proof Test Weld Inspections, Revision 0
PaR Nuclear, Inc. Documents Drawings S-07463344-D, Wire Rope; (SR) Reeving Diagram, Main Hoist. 1 3/8 Dia. Rope, Sheet 1 of 1, Revision 03

Procedures

Procedure
70589683, Factory Acceptance Test (FAT) Procedure, Cask Handling Crane Upgrade, V. C. Summer 1 Nuclear Power Station Procedure
70590054, Cold Proof Load Testing Procedure
70590905, FAT Hoist Loads

Other Documents

1MS-94B-1701, PAR Operations and Maintenance Manual, Revision 0

LIST OF ACRONYMS

AS [[]]
ME American Society of Mechanical Engineers
CHF Cask Handling Facility CoC Certificate of Compliance
FAT Factory Acceptance Test
FW Flood and Wind
HI -STORM Holtec International
STOR age Module
ISFSI Independent Spent Fuel Storage Installation
MPC s Multi-purpose Canisters
VCT Vertical Cask Transporter