- pa af cg 'o, UNITED STATES 8'
.,cf'(
NUCLEAR REGULATORY COMMISSION
'
,
g?
"#
c REGION 11 o,,
hk
[
101 MARIETT A sT., N.W., SUITE 3100
'%-
[
ATLANT A, GEORGI A 30303
.....
Report Nos. 50-348/79-24 and 50-364/79-09 Licensee: Alabama Power Company 600 North 18th Street Birmingham, Alabama 35202 Facility Name: Joesph M. Farley Plant, Units 1 and 2 Docket Nos. 50-348 and 50-364 Licensee Nos. NPF-2 and CPPR-86 Inspection at Farley sjte nepr Dothan, Alabama s & /97 7 Inspec or:
m
- - B. 4 Crowley
/DateSigned 1,tr J# 7 f Approved,by: '
n_m s.
g&A.R'.Herdt ief, RCES Branch
_ f Date Signe'd SUMMARY Inspection on June 11-13, 1979 Areas Inspected This routine, unannounced inspection involved twenty one inspector-hours onsite in the areas of steam generator feedwater nozzle to pipe welds (Unit 1) and preservice inspection procedures and activities (Unit 2).
Results Of the two areas inspected, no apparent items of noncompliance or deviations were identified.
qC9
'7, )
'
-
7008240 %
.
,
.
DETAILS 1.
Persons Contacted Licensee Employees
- W.G. Hairston, Plant Manager D. Morey, Maintenance Supervisor
- M. N. Brown, Engineer G. L. Vines, Level III Examiner
- E. A. Wurster, Operations QA Engineer
- R.
D. Hill, Jr., Project QA Engineer Other licensee employees contacted included technicians, security force members and office persoonel.
Other Organizations (1) Southern Company Services (SCS)
- T. B. Caudle, PSI /ISS Coordinator (2) Westinghouse Electric Corporations, Nucler Services Division (W-NSD)
G. E. Conrad, Field Technician J. Vano, Site Coordinator (3) Sonic Systems International T. M. Jones, Supervisor / Level III Examiner (4) DAVCON R. D. Justice, Division Manager S. Norman, Engineer (5) Peabody Testing Services W. F. Pynes, Project Manager
- Attended exit interview 2.
Eait Interview The inspection scope and findings were summarized on June 13,1979 with those persons indicated in Paragraph I above.
The inspeccion included review of site activities relative to investigation of feedwater nozzle to pipe welds for unit I and PSI activites for Unit 2.
The licensee had no questions or comments.
R , O 7 Q2, V"
.
e-2-
.
3.
Licensee Action on Previous Inspection Findings (0 pen) deficiency, 364/78-20-01, bilities for PSI. Alabama Power Company has issued administrativ FNP-0-AP-5 7.
The inspector will examine during future PSI activities.
implementaion of the procedure 4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Independent Inspection Effort welds in feedwater lines at the D. C. Cook plant,Due to rec (APC) is in the process of evaluaing similar feedwater lines in the Farley 1 Alabama Power Company plant.
The following is a summary of observations / reviews made and informa-tion obtained by the inspector relative to this problem:
Configuration of Feedwater Lines a.
The steam generator feedwater nozzle is 16 - inches in diameter.
first piping component in the line is a The welded to the nozzle and a 14-inch, 45 degree ell.16-inch x 14-inch reducer The other end of 45-degree angle.the ell is welded to a straight section of pipe which runs d The welds are identified as follows:
Generator "A": Reducer to Nozzle - FW 11, ISO EG-186 Reducer to Ell - FW 6283, ISO, EG-186 Generator "B" Reducer to Nozzle - FW 6, ISO 187 Reducer to Ell FW 6278, ISO EG-187 Generator "C": Reducer to Nozzle FW-15, ISO EG-187 Reducer to Ell - FW 15, ISO EG-187 b.
Observation / Review of Inspection Results For the welds listed in paragraph a. above the inspector observed /
reviewed the following:
(1) Radiographs taken June 11-12, 1979 by Peabody Testing (2) F-101 " Controlled Weld Joint Record" F-101/W-101 " Controlled Weld Joint Record Continuation"
" Radiographic Reports" (3) Daniels Welding procedures 1-1-BA and 1-12b-BA (4) Isometric drawings EG-186 and EG-187 RG\\
-
o.
.
-3-
.
(5) Weld "End-Prep" Sketches A-170001, Sheets 1 and 9B.
(6) Grinnel NPP-1 Data Reports for original pipe spools.
c.
Materials - Based on Paragraoh b. Above Steam Generator Nozzle-SA508 C1.2 E11-SA234 Reducer-SA234 Pipe-SA196 Gr. B d.
Welding and Heat Treatment Based on Paragraph b. Above (1) Reducer to nozzle welds:
root - GTA consumable insert, up to 3 additional layers - GTA with E705-2 bare wire, remainder - SMA with E-7018; preheat -250 degrees F min; PWHT - 1150 degrees F; joint design - 37 1/2 - degree
"J" with a counterbore taper of 15 degrees.
(2) Reducer to Ell:
root - GTA open butt, second layer - GTA with E70S-2 bare wire, remainder - SMA with E-7018; preheat - 200 degrees F min; PWHT - 1150 degrees F; joint design - extended land vee groove with a counterbore taper of 15 degrees.
In the areas inspected, no items of noncompliance or deviations were identi-fied.
6.
Pre-Service Inspection - Review of Procedures (Unit 2)
The inspector reviewed the pre-service inspection (PSI) procedures indicated below to determine whether the procedures were consistent with regulatory requirements and licensee committments. The applicable code for the PSI is the ASME Boiler and Pressure Vessel Code,Section XI,1974 Edition, with addenda through the summer of 1975, as required by paragraph 5.2.8 of the FSAR.
a.
ISI-205, revision 2, amendment 3, " Manual Ultrasonic Examination of Full Penetration Circumferential and Longitudinal Butt Welds" This procedure was reviewed in the areas of:
(1) Procedure approval, requirements for qualification of NDE personnel, procedure scope and compilation of required records.
(2) Procedure technical content relative to:
type of apparatus, extent of coverage including beam angle and scanning techniques, calibration requirements, search units, DAC cu rves, reference level for monitoring discontinuities, method of demonstrating penetration, levels for evaluation and recording indications, and acceptance standards.
n'?
-n" e
-4-
-
b.
ISI-11, revision 9, amendment 3, " Liquid Penetrant Procedure" This procedure was reviewed in the areas of:
(1) Procedure approval, requirements for qualification of NDE personnel and procedure scope.
(2) Procedure technical content relative to: method consistent w nh ASME Code, specification of brand names of penetrant materials, specification of limits for sulfur anf total halogens for penetrant materials, preexamination surface preparatics, minimum drying time following surface cleaning, penetrant time, temperature requirements, solvent removal, method of surface drying, type of developer and method of application, examination technique, technique for evaluation and acceptance standards.
ISI-15, Revision 6, Amndment 2, " Ultrasonic Examaination of Studs, c.
Bolts, and Nuts" This procedure was revieved in the areas of:
procedure approval, requirements for qualification of NDE personnel and procedure scope.
d.
ISI-47, Revision 2., Amendment 6, " Manual Ultrasonic Examination of Circumferential and Longitudinal Butt Welds in Ferritic Vessels of 2\\"
Thick and Greater This procedure was reviewed in the areas of:
procedure approval, requirements for qualification of NDE personnel and procedure scope.
In the areas inspected, no items of noncompliance or deviation were identified.
7.
Pre-Service Inspection - Observation of Work and Work Activities (Unit 2)
The inspector observed the PSI activities described below to determine whether these activities were being performed in accordance with regulatory requirements and licensee procedures.
See paragraph 6.
above for the applicable code.
Personnel qualification records for one level I, four level II and one a.
level III examiners were reviewed.
b.
In process ultrasonic (LTI') inspection, including demonstration of calibration on applicable calibration block, was observed for Weld 28, ISO APR-2-2313 and weld 22, ISO APR-2-2311. The inspection was compared with applicable procedures in the following areas:
(1) Availability of and compliance with approved NDE procedures (2) Use of knowledgeable NDE personnel
"
q( ' '!
q l
L
,
-5-
.
(3) Use of NDE personnel qualified to the proper level (4) Recording of inspection results (5) Type of apparatus used (6) Extent of coverage of weldment (7) Calibration requirements (8) Search Units (9) Beam Angles (10) DAC Curves (11) Reference level for monitoring discontinuities (12) Method for demonstration penetration (13) Limits for evaluating and recording indications (14) Recording significant indications (15) Acceptance limits In process Liquid Penetrant (PT) inspection was observed for Weld WS-2 c.
(Lug to pipe Welds) on ISO-APR-2-2311. The inspection was compared with applicable procedures in the following areas:
(1) Availability of and compliance with approved NDE procedures (2) Use of knowledgeable NDE personnel (3) Use of NDE personnel qualified to the proper level (4) Recording of inspection results (5) Method consistent with procedure (6) Penetrant materials identified and consistent with ASME Code (7) Certification of Sulfur and Halogen content for penetrant materials (8) Surface preparation (9) Drying time following surface cleaning (10) Penetrant application and penetration time q/ b L'
.
,
-
f L
.
'
6-(11) Examination surface temperature (12) Penetrant removal (13) Drying of surface prior to developing (14)
loper type, application, and time interval after penetrant (15) Time interval between developer application and evaluation (16) Evaluation technique (17) Reporting examination results In the areas inspected, no items of noncompliance or deviation were identified.
rg /, G L
('{
.