IR 05000348/1979044

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-348/79-44 on 791219-21.No Noncompliance Noted.Major Areas Inspected:Matl Control & Accounting. Details Withheld (Ref 10CFR2.790)
ML19262C084
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/10/1980
From: Gillespie F, Hodges J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19064A039 List:
References
50-348-79-44, NUDOCS 8001280267
Download: ML19262C084 (1)


Text

MATERIAL TPf'SE'TTED HEP.B"ITH

.

  1. pp =avy'o C 0'iT.'.""' 9 ' ~ 1 iT SI]Il UNITED STATES

3 7,,o NUCLEAR REGULATORY COMMISSION 5 g s,ja[E

'

REGION li o, *K d 101 MARIETTA ST., N.W., SUITE 3100 Q

e o

ATLANTA, G EORGIA 303o3

J A N 101980 Report No. 50-348/79-44

~

Docket No. 50-348 License No. Sht-1647 Safeguard Group 4 Licensee: Alabama Power Company P. O. Box 2641 Birmingham, Alabama 35291 Facility Name: Farley No. 1 Inspection at Dothan, Alabama Inspection Conducted December 19-21, 1979 Date of Last Material Control and Accounting Inspection Visit: November 29-30, 1976.

Type of Inspection: Unannounced Material Control & Accounting Inspector:

///o[4b

& J. W.

es, Safeguards uditor Date

/k(2)if

.

Im

/ th Approved by:'

'

F.M Gillespie', Cfaigf, MC&A,/

%ection, Datg Safeguards Branch Inspection Summary:

.

areas Inspected: Material Control and Accounting. The inspection involved 18-inspector hours on site by one NRC inspector and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the one area examined.

..

'

1816 061

o3 P

-

s-12 or Ccpies

-

Copy

]

Pa r.c 3 Thi 3 D o c': ~ ~ ~ ',* * "A * '

reprcC,,a..

- q :-ncific

--

eprc.1 of C:71

MATERIAL TPS'S.'J!TTED !!E3YITH CONTA!NS 2.72]i?l.:5.riga!)

8001280 M f

.