I
.
8[pa arcg
o,
UNITED STATES
7'j
NUCLEAR REGULATORY COMMISSION
,
1
"
- .
',. [
101 M ARIETTA sT., N.W., SUITE 3100
c
FIEGION 11
0, .....[
'%d
ATLANTA, GEORGI A 30303
In Reply Refer To:
JUL 0 21979
RII:BRC
50-348/79-24
50-364/79-9
Alabama Power Company
Attn:
F. L. Clayton, Jr.
Senior Vice President
Post Office Box 2641
Birmingham, Alabama 35291
Gentlemen:
This refers to the inspection conducted by B. R. Crowley of this office
on June 11-13, 1979 of activities authorized by NRC License No. NPF-2
and Construction Permit No. CPPR-86 for the Joseph M. Farley plant
facility, Units 1 and 2, and to the discussion of our findings held with
W. G. Hairston at the conclusion of the inspection.
Areas e7amined durinE the inspection and our findings are discussed in
the encloced inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously identi-
fied enforcement matters.
These are discussed in the enclosed inspection
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to m
%1d
such information from public disclosure.
Any such application m.
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Roc .
,
_
7908240$j
.
Alabama Power Company
2-
JUL 0 2 7979
.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
"
t-
.
C. E. Murphy, Chief
Reactor Construction and
Engineering Branch
Enclosures:
Inspection Report Nos. 50-348/79-24
and 50-364/79-9
cc w/ enclosures:
A. R. Barton
Executive Vice President
Post Office BoF 2641
Birmingham, A1.abama 35291
J. T. Young
Vice President-Production
Post Office Box 2641
Birmingham, Alabama 35291
H. O. Thrash
Manager-Nuclear Generation
Post Office Box 2641
Birmingham, Alabama 35291
C. Biddinger, Jr.
Manager-Corporate Quality Assurance
Post Office Box 2641
Birmingham, Alabama 35291
W. G. Hairston III
Plant Manager
Drawer 470
Ashford, Alabama 35312
R. E. Hollands, Jr.
QA Supervisor
Post Office Box U
Ashford, Alabama 36312
(\\ S^
G