IE Insp Rept 50-348/79-05 on 790122-24.No Noncompliance Noted.Major Areas Inspected:Area of Preparations for Refueling
ML19261C088
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/20/1979
From: Martin R, Vogtlowell R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19261C083 List:
References
50-348-79-05, 50-348-79-5, NUDOCS 7903140546
Download: ML19261C088 (4)


Text

.

.

pm Ri%

UNITED STATES

'o,,

NUCLEAR REGULATORY COMMISSION o

REGION ll

$

101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 30303 o,

+*****/

Report No. : 50-348/79-05 Licensee: Alabama Power Company 600 North 18th Street Birmingham, Alabama 35291 Facility Name: Farley Unit 1 Docket No. - 50-348 License No. : NPF-2 Inspection at Farley site Inspector:

h d'#A 2-13 '7 't R. Vogt-Lowe],1 Date Signed Approved by:

74Yd d

2 - w-77 R. D. Martin, Section Chief, RONS Branch Date Signed SUMMARY Inspection on January 22-24, 1979 Areas Inspected This routine, unannounced inspection involved 16 inspector-hours onsite in the area of preparations for refueling.

Results In the area inspected, no apparent items of noncounliance or deviations were identified.

79031405%

,

.

t DETAILS 1.

Persons Contacted Licensee Employees

  • W.

G. Hairston, Plant Manager

  • J.

Woodard, Assistant Plant Manager

  • K. W. McCracken, Technical Superintendent
  • R.

D. Hill, Plant QA Engineer C. Nesbitt, Chemical and Health Physics Supervisor M. Mitchell, Assistant Chemical and Health Physics Supervisor D. Cox, QA Engineer R. Marlow, Reactor Engineer W. MacDonald, Plant Engineer G. Foster, Plant Engineer

  • Attended exit interview.

2.

Exit Interview The inspection scope and findings were summarized on January 24, 1979, with those persons indicated in Paragraph I above.

During the exit interview the licensee committed to making available for inspection the documentation of the review of all safety-related refueling procedures prior to their use during the upcoming refueling outage.

3.

Unresolved Items Unresolved items were not identified during this inspection.

4.

Preparation for Refueling a.

Procedure Review The inspector reviewed the following procedures as they relate to the upcoming Farley Unit 1 Cycle I to Cycle II refueling outage:

FNP-0-AP-1

" Development, Review and Approval of Plant Proce-dures" FNP-0-FHP-3.0 " Receipt and Storage of New Fuel" Draf t Copy of

" Refueling Procedures for Cycle I-II," prepared by Westinghouse

4' :fW :

-

'

-

-

-

'

'

,

..

-

-

',

Rg%,..

_

n := -

u

-.

?

.

,

,

,

.

't f

Y

),~

'

,

' ;

-2-x

.m h

!-

!

s

.

.,

FNP-0-RCP-2.0 " Radiation Work Permits"

!"3 ~

-

FNP-0-RCP-4.0 " Initial Refueling Survey"

' -

  • <m FNP-0-AP-42

" Access Control"

{",

.

During the review of the Westinghouse draft of the " Refueling

.

il Procedures for Cycle I-II," the inspector noted that the proposed (

,

organizational responsibility involves a Westinghouse " Refueling i '

Coordinator" who will be responsible for the entire refueling l

-

program and who will report directly to the Alabama Power Company

"

,e (APCO) plant manager. Further, an APC0 " Refueling Shif t Supervisor"

,

will hold an SRO license and will be responsible for all core

-

alterations.

-

,,

The following table highlights several of the supporting functions

;

'

.,

'1 for the outage and their respective responsible parties as delin-

.

%f -

eated in the draft procedure:

+

~

i Supporting Function Responsibility

'f

.

H Procedure Preparation Westinghouse (W)

'

'

  • !

Procedure Review and Approval W/APC0

'

J Procedure Change Control APC0

$

Radiological Control APC0

'

Establishment and Control of

'

D Restricted Areas APC0

,

Personnel Access Control APC0

'

Rigging and Rigging Control W

QA and QC APC0

, '

x M

Core Video Tape Mapping W

Core Mapping Verification W/APC0

!

.

+ *

L

.

~l The plant Technical Superintendent informed the inspector that the

{

,

"!

draft procedure is expected to be in its final approved form by the

}*

second week in February 1979.

l

--

}

,

1:

Within the areas inspected, no items of noncompliance or deviations were identified.

  • ',

,

,

,

b.

Observation of Activities

,

9 While observing implementation of portions of FNP-0-FHP-3.0, " Receipt

!

,,

l and Storage of New Fuel," the inspector witnessed activities asso-

!.

  1. j ciated with the opening of Jestinghouse new fuel shipping containers,
:- i

.l the removal, unpacking and inspection of the enclosed fuel assemblies

-

..

. 3:

%

b

  • 'k-

...,

..

E

+.

.g..

.._......;.......,.

-.,_-.._m m.-

--...,s..

.....-...j.

3.

.....

m..

._... _..._ _ _.. _.... -... _.,

,

.._.=_,....y

.............

.

e

.

m

.

.

- '

'

s

-

,

.

.

.

.

-3-and the subsequent placement of these assemblies into the Spent Fuel Pit. The inspector noted the presence of a Westinghouse " Fuel Site Surveillance Engineer" during the new fuel handling activities.

Within the areas inspected, no items of noncompliance or deviations were identified.

c.

Licensee Documentation of Procedural Reviews Paragraph 9.0 of procedure FNP-0-AP-1 requires the perforn:ance and documentation of periodic reviews of safety-related procedures.

While reviewing the implementation of this reqairement, the' inspector was informed by the licensee that the onsite Operation Qrality Assurance (0QA) group had identified an inadequacy in this' arer in that not all ensite groups were performing the required reviews and that a uniform system was not available for documenting any reviews that had been performed.

In the Corrective Action Report, CAR-328, approved by the Plant Manager on January 5,1979, the corrective action for this condition identified by the OQA group is as follows:

Document Control will provide each group supervisor with a list of safety-related procedures which they are responsible for reviewing.

Each supervisor shall assign personnel to perform the required review.

Reviews shall be documented by initialing and dating the procedure listings. Procedure listings will be returned to Document Control upon review completion.

In the future, Document Control will issue periodic printouts of procedures that are due for review.

The estimated completion date for this corrective action is July 1, 1979.

During the exit interview, the licensee committed to making available for inspection documentation of the review of all safety-related refueling procedures prior to their use during the upcoming refueling outage.