IR 05000364/1979008

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-364/79-08 on 790503-04.No Noncompliance Noted.Major Areas inspected:pre-operational Test Procedures
ML19247A012
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/15/1979
From: Martin R, Wagner A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19247A010 List:
References
50-364-79-08, 50-364-79-8, NUDOCS 7907270043
Download: ML19247A012 (3)


Text

9 UNITED STATES 988800g

jo,,

NUCLEAR REGULATORY COMMISSION REGloN il 7(

,],t '.

g 101 M AR;ETTA STREET, N.W.

g g d [ :. r

,

[

ATLANTA, GEORGI A 3o303 o

.....

Report No. 50-364/79-08 Licensee:

Alabama Power Company 600 North 18th Street Birmingham, Alabama 35291 Facility Name: Farley Unit 2 Docket No. 50-364 License No. CPPR-86 Inspection at Farl Dite near Ashford, Alabama

/

- g

/

Inspector:

D1te Sigded G.

a ner_

f/J/77

[jy_h ;

~

Approved by:

s gt R. D. Marna, Section Chief, ROSS Branch D te Signed SUMARY Inspection on May 3-4, 1979

Areas Inspected This routine, announced inspection involved 10 inspector-hours onsite in the area of preoperational test procedure witnessing.

Results 7n the one area inspected, no apparent items of noncompliance or deviations were identified.

790727c0C

'

-

..

-

-

,

.

.

..

DETAILS 1.

Persons Contacted Licensee Employees

  • W. Hairston, Plant Manager
  • J. Woodard, Assistant Plant Manager
  • D. Mansfield, Startup Superintendent L. Ward, Startup Supervisor K. Burr, Test Supervisor
  • R.

Hill, Operations QA

  • J.

Kale, Jr., Operations QA

  • L. Bailey, Jr., Operations QA
  • Attended exit interview.

2.

Exit Interview The inspection scope and findings were summarized on May 4, 1979 with those persons indicated in Paragraph 1 above. There were no objections raised by the licensee regarding the findings.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Preoperational Test Witnessing Parts of two preoperational tests were witnessed.

a.

024-5-004 Diesel Generator 1-2A, IC, IB and 2C Response to LOSP and Safety Injection Signals, Unit 1 and Unit 2, approved 3-9-79.

  • No Comments.

b.

024-5-001 Diesel Generator Load Sequencing Preoperational (Train

A), approved 3-20-79.

During review of recordt data, the inspector noted that the recorder

,,.

speed was less than the required value in paragraph S.15.8 of the procedure. The speed requirement was reviewed by the licensee and

'

.

+#

'tL 00L

!

...

.

.

.

-2-an approximate speed value was intended for use during test conduct.

A test procedure modification request was processed to change the procedure to state the approximate speed required.

c.

024-5-002 Diesel Generator 1-2A, IC, 2C to Unit 2 Pre-op, approved 2-14-79.

No comments.

6.

Plant Tours The inspector toured portions of Unit I and 2 control logs and auxiliary building and auxiliary building.

No items of noncompliance or deviations were identified.

.

b

&

G

g

-

}

.-Q bb v

/

,

.

.