Text

w

UNITED STATES

'o*t NUCLEAR REGULATORY COMMISSION

,

.'

{

E REGION 11

~'

o

.t 101 MARIETTA ST., N.W., SUITE 3100 o

ATLANTA, GEORGIA 303o3

OCT 12 E79

.

Report No. 50-364/79-13 Licensee: Alabama Power Company 600 North 18th Street Birmingham, Alabama 35201 Facility Name: Joseph M. lirley Nuclear Plant, Docket No. 50-364 License No. CPPR-86 Inspection at Farley site near Ashford, Alabama Inspector:

bh

/

//)79 u

M. D. Hunt D6te Signed Approved by:

/#//z/94 J. C ifant, S(pfion Chief, RC&ES Branch Dat6 ' Signed SUMMARY Inspection on September 17-20, 1979 Areas Inspected This routine unannounced inspection involved 25 inspector-hours onsite in the areas of unresolved items, IE Bulletins and Circulars, calibration of electrical crimping tools, calibration of test gauges, and review of a management audit.

Results Of the areas inspected, no apparent items of noncompliance or deviations were identified.

1396 351

'

7911270 0 6

w

.

.

DETAILS 1.

Persons Contacted Licensee Employees

  • J. A. Mooney, Project Manager, Construction
  • D. E. Mansfield, Startup Superintendent
  • D. B. Hartline, QA Engineer, Mechanical
  • J. C. Payson, QA Engineer
  • C. R. Kualheim, QA Engineer, Electrical R. E. Hollands, Jr., QA Supervisor L. D. Bradshaw, Supervisor, Generating Plant Technical Services (GPTS)

L. E. Easter, Senior Engineer (GPTS)

J. D. Woodard, Assistant Plant Manager, Operations K. W. McCracken, Technical Superintendent, Operations

  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on September 20, 1979 with those persons indicated in Paragraph I above.

3.

Licensee Action On Previous Inspection Findings (0 pen) Unresolved Item 364/78-09-01, Verification of anchor bolt length.

The licensee has now determined that the 18 large hangers with 42 bolts in question and the one small hanger involving one bolt will be corrected at the time of the inspection required by IEB 79-02.

(Closed) Unresolved Itee 364/79-07-01, Extra steel under steam generator supports. The licensee presented a letter from Westinghouse Electric Corpoc.-tion and a letter from Bechtel Power Corporation stating thta the

"as built" condition does not affect the structural intregrity of the supports. The inspector agrees with the statement that the steel beams and shims have a greater load bearing capacity than the concrete grout placed under the supports. RII has no further questions at this time.

(0 pen) Unresolved Item 364/79-10-01, Adequacy of access to the escape hatch. The licensee has submitted an Operating Change Request to the A-E for review of the effectively blocked Containment Emergency Access Hatch.

4.

Unresolved Items Unresolved items were not identified during this inspection.

1396 3S2

-2-

.

.

5.

Independent Inspectiot The inspector selected nine terminator identification numbers from 15 cable termination records for verification that the crimping tool used was in calibration at the time the termination lug was installed. Records indicated

'

all the crimping tool used were checked each month and were in satisfactory condition. Records also indicated that crimping tools found out of calibra-tion were destroyed as witnessed b3 a QC inspector. All work reviewed was in accordance with construction procedure 5.4.3.1A, Cable Terminations.

The inspector selected the two pressure guages used for the cold hydro test of the coolant loop for verification of calibration. Manufacturer's certifi-cation of accuracy were examined as were the calibration records. All were found in accordance with construction procedure 5.3.3, Calibration and Control of Test and Measuring Equipment.

,

The inspector reviewed a management audit of the Farley Nuclear Plant that the QA Section performed in August 1978. The revier was to determine if deficiencies found had been resolved. All have been resolved except two items. These items involved revision to the QA Manual and are being reviewed now for issue in the near future.

Within the areas examined, no items of noncompliance or deviation were identified.

6.

Part 21 The licensee is reviewing three purchase orders listed in a letter from Gould Incorporated, Electrical Products Group, involving a potential defect in NEMA Size 3 Starters and Contactors. The letter advised that Gould had notified the NRC of this potential product defect. The licensee is reviewing the purchase orders listed in the letter to determine if the materials are installed in safety related systems.

The inspector also reviewed the licensee's evaluation of a General Electric Company service letter relating to the replacement of bearings on Magne-Blast Breakers with the ML-13 operating mechanism. The licensee advised the inspector that to date none of the breakers have been found to be in safety related circuits.

7.

IE Bulletins (IEB) and IE Circulars (IEC)

(Closed) IEB 79-11, Faulty overcurrent trip device in circuit breakers for engineered safety systems. The licensee response dated May 29, 1979, to RII advised that the type breakers listed in this bulletin are not used at Farley Units 1 and 2.

(0 pen) IEB 79-02, Pipe support plate designs using concrete expansion anchor bolts. An evaluation of the anchor bolts for Unit 2 will begin once Unit 1 is completed.

1396 3S3

.

-3-

-

.

(Closed) IEC 78-19 Hanual override (by pass) of safety system actuation signals. The licensee's A-E has reviewed this bulletin and changes have been made where required.

(Closed) IEB 9-05,79-05A, 79-06,79-06A, 79-06B, These bulletins related to the TMI incident and do not require a response.

.

1396 454

.