Inspection 05000333-10-201, on 08/12/2010, James A. FitzPatrick Nuclear Power Plant - Target Set (Letter)
ML102510104
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/13/2010
From: West G
Division of Security Operations
To: Peter Dietrich
Entergy Nuclear Northeast
Shared Package
ML102510085 List:
References
IR-10-201
Download: ML102510104 (2)


Text

ber 13, 2010

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - TARGET SET INSPECTION 05000333/2010201

Dear Mr. Dietrich:

On August 12, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a Target Set Inspection at the James A. FitzPatrick Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed at the exit on August 12, 2010, with Mr. J. LaPlante and other members of the site staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Garmon West, Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-333 License No.: DPR-59 Enclosure: Inspection Report 05000333/2010201 w/Attachment: Supplemental Information cc w/encl: J. LaPlante, Site Security Manager F. Murray, President and CEO, NYSERDA, State of New York R. Frazier, New York State Office of Homeland Security J. Curry, NSIR S. Coker, NSIR J. Trapp, RI M. Ernstes, RII E. Duncan, RIII M. Shannon, RIV cc w/o encl: Senior Vice President and COO, Entergy Nuclear Operations Vice President, Oversight, Entergy Nuclear Operations Senior Manager, Nuclear Safety and Licensing, Entergy Nuclear Operations Assistant General Counsel, Entergy Nuclear Operations E. Dorman, Licensing, Entergy Nuclear Operations P. Eddy, New York State Department of Public Service P. Church, Oswego County Administrator Supervisor, Town of Scriba C. Donaldson, New York Department of Law S. Lousteau, Treasury Department, Entergy Services J. Spath, New York State Energy Research and Development Authority