b (_
'
UNITED STATES
!e' ** 49'o
NUCLEAR REGULATORY COMMISSION
'
fg
(f ,,g
REGloN ll
101 M ARIETT A STR E ET, N.W.
g g g. p/ '. r#
ATE ANTA, GEORGIA 30303
.
'-
o .p'g%
%*****f
In Reply Refer To.
VM
1N
RII:PKV
50-327/79-23
50-328/79-12
Tennessee Valley Authority
Attn:
H. G. Parris
ManaEer of Power
500A Chestnut Street Tower II
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by P. K. Van Doorn of this
office on April 10-12, 1979 of activities authorized b, NRC License Nos.
CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant facility, Units 1 and
2, and to the discussion of our findings held with G. G. Stack at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the er. closed inspectica report. Within these areas, the inspection
consisted of selective examinations of procedurcs and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Pa rt 2, litle 10, Code et Federal Regulations, a copy of this letter and
the enclosed inst;ecticu report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this of fice to withhold
si:ch information f rom public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should te prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear fr>m you in this
regard within the specified period, the report will be placed in the
Public Document Room.
s
] 107 050
M
,-
,
I
'
.
.
.
.
MAY
18U
s
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
2c J /
yr-
, ,,
,
Charles E.
u rp6y ,
ef
Reactor Construction and
Engin ering Support Branch
Enclosures:
Inspection Report Nos. 50-327/79-23
and 50-328/79-12
cc w/ enclosures:
J. E. Gilleland
Assistant Manager of Power
500C Chestnut Ftreet Tower II
Chattanooga, Tennessee 37401
G. G. Stack, Project Manager
Sequoyah Nuclear Plant
Post Office Box 2000
Daisy, Tennessee 37319
J. M. Ballentine
Plant Superintendent
Sequoyah Nuclear Plant
Post Office Box 2000
Daisy, Tennessee 37319
J. F. Cox
400 Commerce Street
W9D214
Knoxville, Tennessee 37902
-
285 31(i