IR 05000275/2021301

From kanterella
(Redirected from IR 05000323/2021301)
Jump to navigation Jump to search
Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301
ML23221A044
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/09/2023
From: Heather Gepford
NRC/RGN-IV/DORS/OB
To: Gerfen P
Pacific Gas & Electric Co
References
Download: ML23221A044 (3)


Text

August 09, 2023

SUBJECT:

ERRATA FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EXAMINATION REPORT 05000275/2021301 AND 05000323/2021301

Dear Ms. Gerfen:

By letter dated July 27, 2023, (ML23221A086), Diablo Canyon requested to extend the date the examination materials from the 2021 NRC initial license examination were released. We have determined that, based on the circumstances described in your request, the release date of the exam materials can be extended from August 12, 2023, to September 30, 2024. However, this creates an error in NRC Examination Report 05000275/2021301 and 05000323/2021301 (ML21076A614). The delayed release date for the final written exams (ML21075A088) and final operating test (ML21075A087) is now September 30, 2024. Please replace the attachment page of the examination report with the attached page.

Sincerely, Signed by Gepford, Heather on 08/09/23 Heather J. Gepford, Ph.D., Chief Operations Branch Division of Operating Reactor Safety Docket No. 05000275, 05000323 License No. DPR-80, DPR-82 cc: Electronic distribution via LISTSERV

ML23221A044 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: Yes No Publicly Available Sensitive NRR-079 OFFICE SOE:DORS/OB C:DORS/OB NAME JKirkland HGepford SIGNATURE /RA/ /RA/

DATE 08/09/23 08/09/23

SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel P. Gerfen, Site Vice President J. Rogers, Operation Training Manager A. Kadir, Exam Supervisor R. Fortier, Examination Development Lead C. Mehigan, Examination Operations Representative L. Toribio, Examination Developer NRC Personnel D. Krause, Senior Resident Inspector A. Athar, Resident Inspector ADAMS DOCUMENTS REFERENCED Accession No. ML21075A088 - FINAL WRITTEN EXAMS (delayed released until 9/30/2024)

Accession No. ML21075A087 - FINAL OPERATING TEST (delayed released until 9/30/2024)

Accession No. ML21075A080 - POST-EXAMINATION ANALYSIS Attachment