November 03, 2021

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - INTEGRATED INSPECTION REPORT 05000275/2021003 AND 05000323/2021003

Dear Mr. Welsch:

On September 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jeffrey E. Josey, Chief Reactor Projects Branch A Division of Reactor Projects

Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000275 and 05000323

License Numbers:

DPR-80 and DPR-82

Report Numbers:

05000275/2021003 and 05000323/2021003

Enterprise Identifier: I-2021-003-0106

Licensee:

Pacific Gas and Electric Company

Facility:

Diablo Canyon Power Plant, Units 1 and 2

Location:

Avila Beach, CA

Inspection Dates:

July 1, 2021, to September 30, 2021

Inspectors:

R. Alexander, Senior Emergency Preparedness Inspector

C. Alldredge, Health Physicist

A. Athar, Acting Senior Resident Inspector

B. Bergeon, Operations Engineer

M. Hayes, Acting Resident Inspector

S. Hedger, Emergency Preparedness Inspector

D. Krause, Senior Resident Inspector

J. O'Donnell, Senior Health Physicist

C. Young, Senior Project Engineer

Approved By:

Jeffrey E. Josey, Chief

Reactor Projects Branch A

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Diablo Canyon Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 operated at or near rated thermal power for the entire inspection period.

Unit 2 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week, increasing the amount of time on-site as local COVID-19 conditions permitted.

As part of their on-site activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; conducted routine reviews using IP 71152, Problem Identification and Resolution; observed risk significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 emergency diesel generator 1-1 on July 12, 2021
(2) Unit 1 centrifugal charging pump 1-1 and 1-2 on August 24, 2021
(3) Unit 1 and 2 seismic monitoring system on September 29, 2021

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 2 fuel handling building on July 1, 2021
(2) Unit 2 auxiliary building, 73-foot elevation, on July 1, 2021
(3) Unit 1 and 2 intake structure on July 26, 2021
(4) Unit 1 auxiliary building, 64-and 73-foot elevations, on August 24, 2021
(5) Unit 1 turbine building component cooling water heat exchanger room, 85-foot elevation, on September 3, 2021

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Diesel fuel oil underground vault on August 30, 2021

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during performance of Unit 2 train B slave relay testing per Procedures STP M-16F and STP M-16D on September 1, 2021, and September 12, 2021.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a crew of licensed operators during simulator training on August 27, 2021, and September 9, 2021.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample, 1 Partial)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1)

(Partial)

Unit 2 main generator on September 24, 2021

(2) Open phase initiative on September 28, 2021

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 1 loss of reactor protection system protection set 4 on July 1, 2021
(2) Unit 1 auxiliary saltwater pump 1-1 emergent motor replacement on July 5-8, 2021
(3) Unit 1 auxiliary building ventilation supply fan S-32, emergent maintenance due to slipped fan belt, on August 30, 2021
(4) Unit 1 emergency diesel generator 1-2, planned 24-hour load test and hot restart surveillance, protected equipment walkdown on September 23, 2021

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples, 1 Partial)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 1 auxiliary building ventilation supply fan S-32 emergent maintenance due to slipped fan belt on August 30, 2021 (2)

(Partial)

Unit 2 emergency diesel generator 2-3 fuel oil leak, common cause operability evaluation on September 13, 2021

(3) Unit 2 LCV-113 closure time over action high on September 15, 2021
(4) FLEX diesel light tower oil functionality evaluation on September 17, 2021
(5) Unit 2 auxiliary feedwater pump 2-1 returned to service with broken speed probe on September 22, 2021
(6) Unit 1 degraded fire barrier in safety injection pump room functionality evaluation on September 29, 2021

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 2 temporary modification for PC-400 setpoint change, pressurizer relief tank N2 supply, on July 1, 2021
(2) Telemetry equipment installed on September 1, 2021

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) Unit 2 component cooling water pump 2-2 post-maintenance test on July 1, 2021
(2) Unit 2 auxiliary saltwater pump 2-2 post-maintenance test on July 1, 2021
(3) Unit 1 auxiliary saltwater pump 1-1 after emergent motor replacement on July 8, 2021
(4) Unit 2 auxiliary saltwater pump 2-1 post-maintenance test on July 19, 2021
(5) Unit 2 battery charger 232 performance test on August 31, 2021
(6) Unit 2 residual heat removal pump 2-1 after maintenance activities on September 7, 2021

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Emergency core cooling system leakage outside containment, Surveillance Test Procedure M-87, on July 12, 2021
(2) Unit 2 emergency diesel generator 2-1, 24-hour load test and hot restart test, on September 14, 2021

Inservice Testing (IP Section 03.01) (1 Sample)

(1) Unit 2 exercising residual heat removal pump 1 suction valve 8700A in-service test per Surveillance Test Procedure V-3M4A on September 8, 2021

FLEX Testing (IP Section 03.02) (1 Sample)

(1) Units 1 and 2 annual FLEX equipment surveillance testing on July 15, 2021

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1) The inspectors evaluated the biennial emergency plan exercise conducted on September 14 and 15, 2021. The exercise scenario simulated a toxic gas release in the auxiliary building, a steam line break outside containment, an anticipated transient without a reactor scram, a small break loss of coolant accident into containment, and spurious failure of containment isolation valves resulting in a release of radioactive materials offsite requiring the issuance of Protective Action Recommendations to offsite authorities. The exercise also included demonstration of one of the station's extensive damage mitigation guideline strategies per the requirements of 10 CFR 50.155(b)(2).

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following 10 CFR 50.54(q) change evaluations for Emergency Action Level and Emergency Plan changes:
  • Effectiveness Evaluation 2021-10, Revise Section 7.2.1 of the DCPP Emergency Plan, dated 07/12/2021
  • LBIE 2004-003, Operations Support Center (OSC) Relocation (Emergency Plan Sections 7.1.4.1 and 7.1.5.1), dated 02/13/2004

This evaluation does not constitute NRC approval.

71114.08 - Exercise Evaluation Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

(1) The inspectors reviewed the licensee's preliminary exercise scenario that was submitted to the NRC on July 15, 2021, (ADAMS Accession No. ML21196A487) for the exercise scheduled to occur on September 15, 2021. The inspectors discussed the preliminary scenario with Mr. A. Warwick, Manager, Emergency Preparedness, and other members of the emergency preparedness staff on August 16, 2021. The inspectors' review does not constitute NRC approval of the scenario.

RADIATION SAFETY

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Walkdowns and Observations (IP Section 03.01) (4 Samples)

The inspectors evaluated the following radioactive effluent systems during walkdowns:

(1) Unit 1 liquid radwaste system
(2) Unit 2 liquid radwaste system
(3) Unit 2 gaseous radwaste system
(4) Unit 2 auxiliary building ventilation system

Sampling and Analysis (IP Section 03.02) (3 Samples)

Inspectors evaluated effluent samples, sampling processes and compensatory samples, as available.

(1) Laundry radwaste vent particulate effluent sample - September 21, 2021
(2) Radwaste vent particulate effluent sample - September 21, 2021
(3) Unit 2 plant vent, particulate, iodine, noble gas, and tritium samples - September 23, 2021

Dose Calculations (IP Section 03.03) (2 Samples)

The inspectors evaluated the following dose calculations:

(1) Doses to the members of the public associated with gaseous radioactive waste permits: G-2019-0379, G-2020-0373, G-2021-0115
(2) Doses to the members of the public associated with liquid radioactive waste permits:

L-2019-0604, L-2020-0022, L-2021-0199

Abnormal Discharges (IP Section 03.04)

There were no abnormal discharges during the assessment period.

71124.07 - Radiological Environmental Monitoring Program

Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.

Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.

Groundwater Protection Initiative Implementation (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative program to identify incomplete or discontinued program elements.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS08: Heat Removal Systems (IP Section 02.07)===

(1) Unit 1 (July 1, 2020, through June 30, 2021)
(2) Unit 2 (July 1, 2020, through June 30, 2021)

MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)

(1) Unit 1 (July 1, 2020, through June 30, 2021)
(2) Unit 2 (July 1, 2020, through June 30, 2021)

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 1 (July 1, 2020, through June 30, 2021)
(2) Unit 2 (July 1, 2020, through June 30, 2021)

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) July 1, 2020, through June 30, 2021

EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)

(1) July 1, 2020, through June 30, 2021

EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)

(1) July 1, 2020, through June 30, 2021

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Labeling of environmentally qualified devices on September 21,

INSPECTION RESULTS

Observation: Failure to Label Environmentally Qualified (EQ) Devices 71152 In July 2021, the NRCs power-operated valves design basis assurance team identified issues associated with the stations failure to adequately label an environmentally-qualified motor-operated valve. The licensees Procedure CF3.DC1, Maintenance and Surveillance of Electrical Environmentally Qualified Equipment, Section 5.3.3, required EQ devices to be identified by tags or labels in such a manner as to clearly inform any personnel working with the equipment that the equipment is environmentally qualified. The inspectors followed up on this issue and identified three additional EQ motor-operated valves that were not labeled as well as one electrical penetration box with a badly degraded EQ identification sign.

Subsequently, the licensee performed a partial extent-of-condition walkdown on EQ electrical penetrations and motor-operated valves. From the sample of EQ devices examined by the licensee, 51 percent of motor-operated valves and 15 percent of electrical penetrations were missing EQ labeling. The stations work control process identifies any EQ component involved in work orders as such, and the inspectors did not identify any work orders where an EQ component was not identified as such. The stations corrective actions include revising EQ program procedures to remove the requirement for labeling EQ devices.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 23, 2021, the inspectors presented the public radiation safety inspection results to Ms. P. Gerfen, Site Vice President, and other members of the licensee staff.
  • On September 30, 2021, the inspectors presented the integrated inspection results to Mr. J. Welsch, Senior Vice President and Chief Nuclear Officer, and other members of the licensee staff.
  • On October 14, 2021, the inspectors presented the emergency preparedness exercise inspection results to Ms. P. Gerfen, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Procedures

CP M-4

Earthquake

OP B-1A:IX

CVCS - Alignment Verification for Plant Startup

OP J-6B:I-A

Diesel Generator 1-1 - Alignment Checklist

STP I-1D

Routine Monthly Checks Required by Licenses

101

71111.05

Drawings

PA-1

Intake Structure Unit 1 & 2

RA-19

Radiological Control Area (RCA) Elev. 140 Foot

RA-3

Radiological Control Area (RCA) Elev. 73 Foot

TB-3

Turbine Building Elev. 85'

71111.06

Corrective Action

Documents

Notifications

50514804, 51129427, 51129428

Miscellaneous

DCM No. S-21

Design Criteria Memorandum S-21, Diesel Engine System

29A

DCN 0-EJ-

049147

Design Change Notice

Procedures

AD7.DC8

Work Planning

MA1.ID27

Preventive Maintenance Program

Work Orders

WO 248333

71111.11Q Procedures

STP M-16D

Operation of Train B Slave Relay K608 (Safety Injection)

STP M-16F

Test Train B Slave Relays K609 (Safety Injection) and K633

(AFW Pump 2 Start)

Work Orders

WO 245985, 64247518

71111.12

Corrective Action

Documents

Notifications

51092854, 51131022

Work Orders

WO 60124475, 60131677, 60135509, 64246147, 64246149,

246151, 64246152, 64256889, 64256890

71111.13

Corrective Action

Documents

Notifications

51124067, 51124874, 51124896, 51126613, 51129597

Procedures

AD7.DC6

On-Line Maintenance Risk Management

AD7.ID14

Assessment of Integrated Risk

AD7.ID14,

Risk Management Plan: ASW 1-1 Motor Swap within 75% of

AOT

07/07/2021

OP AP-11

Malfunction of Component Cooling Water System

35A

OP O-36

Protected Equipment Postings

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

OP1.DC40,

Adverse Condition Monitoring Plan: Brief Aux Operator on

Loss of CCW

07/07/2021

STP I-36-R15

Eagle 21 Rack 15 Remove from Service and Return to

Service

TS5.ID1

System Engineering Program

Work Orders

WO 60138585

71111.15

Corrective Action

Documents

Notifications

50990566, 50990713, 51117656, 51124036, 51124262,

51126109, 51127556, 51130369, 51130794, 51131296,

51131646

Miscellaneous

DC-663056-45

Instruction Manual Aux Feedwater Pump Turbine

03/28/1990

Procedures

STP V-3P6B

Exercising Valves LCV-115 and 113 Auxiliary Feedwater

Pump Discharge

STP M-70A

Inspection of Fire Barrier and HELB Penetration Seals

Work Orders

60136888, 64233943, 64247827

71111.18

Corrective Action

Documents

Notifications

51116564, 51123490, 51123492

Miscellaneous

60138317

Engineering Change Order TMOD(E) PC-400 Setpoint

Change

06/28/2021

Procedures

CF3.ID9

Design Change Development

CF4.ID7

Temporary Alteration

CF4.ID8

Temporary Attachments

5A

MA1.ID8

Control of Temporary Rigging from Plant Equipment, Piping

and Structural Members

3A

MP I-7-P400

Unit 2 Pressurizer Relief Tank Nitrogen Supply Pressure

Control PC-400 Calibration

Work Orders

WO 60138317, 60138318

71111.19

Corrective Action

Documents

Notifications

51124688, 51124696, 51124787, 51124869, 51124874,

51130296

Miscellaneous

Unit 2 Shift Log

Test Run of CCW Pump 2-2

07/01/2021

Procedures

STP M-12B

Battery Charger Performance Test

STP M-26

ASW System Flow Monitoring

STP P-ASW-21

Routine Surveillance Test of Auxiliary Saltwater Pump 2-1

STP P-ASW-22

Routine Surveillance Test of Auxiliary Saltwater Pump 2-2

30A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

STP P-ASW-A11

Comprehensive Test of Auxiliary Saltwater Pump 1-1

13A

Work Orders

WO 64141889, 64207645, 64237661, 64238494, 64238707,

242008, 64242834, 64247481,

71111.22

Corrective Action

Documents

Notifications

51125156, 51125158, 51130483

Procedures

STP M-87

Operational Leakage of ECCS Recirc Paths Outside

Containment

STP M-9G

Diesel Generator 24 Hour Load Test and Hot Restart Test

59B

Work Orders

WO 202944, 64218720, 64239789, 64239820

71114.01

Corrective Action

Documents

Condition Reports

(SAPN)

50877657, 50877827, 50878454, 51002781, 51002784,

51002933, 51002934, 51012155, 51014007, 51014388,

51022745, 51027821, 51030432, 51033084, 51033263,

51034921, 51035836, 51038196, 51074250, 51074279,

51086215, 51086295, 51086369, 51086464, 51088328,

51088376, 51088428, 51096699, 51096940, 51105902,

51123681, 51123775, 51126199, 51130932, 51130934,

51130960, 51131303, 51131377, 51131976, 51132033,

51132088

Corrective Action

Documents

Resulting from

Inspection

Condition Reports

(SAPN)

51131375, 51133318, 51133319, 51133360, 51133362

Miscellaneous

Diablo Canyon Power Plant Management Critique and

Debrief: September 14th & 15th, 2021 Evaluated Exercise

Performance Summary

09/29/2021

Procedures

CAP A-4

Laboratory Instrumentation Calibration and Routine

Maintenance Schedule

CAP B-53:III

Operation of the Canberra APEX Gamma Spectroscopy

System

EDMG EDCG-1

ERO Guidance for Extensive Plant Damage Mitigation

1A

EDMG EDG-4

Spent Fuel Pool Leakage Control Strategies

EOF FR-P.1

U1, Response to Imminent Pressurized Thermal Shock

Condition

EOP E-0

Reactor Trip of Safety Injection

45D

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EOP E-1.2

Post-LOCA Cooldown and Depressurization

23A

EP EF-1

Activation and Operation of the Technical Support Center

EP EF-2

Activation and Operation of the Operational Support Center

EP EF-3

Activation and Operation of the Emergency Operations

Facility

EP G-2

Interim Emergency Response Organization

EP G-3

Emergency Notification of Off-Site Agencies

EP RB-10

Protective Action Recommendations

EP RB-12

Plant Vent Iodine and Particulate Sampling During Accident

Conditions

EP RB-14A

Initial Detection of Fuel Cladding Damage

EP RB-3

Stable Iodine Thyroid Blocking

OP AP-22

Spent Fuel Pool Abnormalities

71114.04

Miscellaneous

DCPP Emergency Plan, Section 7, Emergency Facilities and

Equipment

5.03

50.54(q)

Effectiveness

Evaluation 2021-

Implement Phase 3 of the PBX Phone System

Upgrade/Replacement

07/12/2021

LBIE 2004-003

Operations Support Center (OSC) Relocation (Emergency

Plan Sections 7.1.4.1 and 7.1.5.1)

2/13/2004

Procedures

OM10.ID2

Emergency Plan Revision and Review

13A

71114.08

Miscellaneous

DCL-21-052

Docket No. 50-275, OL-DPR-80; Docket No. 50-323,

OL-DPR-82; Diablo Canyon Units 1 and 2; Materials License

No. SNM-2511, Docket No. 72-26, Diablo Canyon

Independent Spent Fuel Storage Installation; Biennial

Exercise Scenario Data Package for the 2021 Evaluated

Exercise

07/15/2021

Procedures

EDMG EDCG-1

ERO Guidance for Extensive Plant Damage Mitigation

1A

EMDG EDG-4

Spent Fuel Pool Leakage Control Strategies

EP G-1

Emergency Classification and Emergency Plan Activation

EP G-3

Emergency Notification of Off-Site Agencies

EP RB-10

Protective Action Recommendations

EP RB-12

Plant Vent Iodine and Particulate Sampling During Accident

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Conditions

EP RB-14A

Initial Detection of Fuel Cladding Damage

OP AP-22

Spent Fuel Pool Abnormalities

71124.06

Calculations

G-2019-0379

Unit 2 Summary of Discharge of Plant Vent

2/05/2019

G-2020-0373

Summary of Discharge of Miscellaneous Release Source

2/22/2020

G-2021-0115

Summary of Containment Atmosphere Discharge, MODES

1-4

04/15/2021

L-2019-0604

Summary of Discharge of Condensate Demineralizer

Regenerate Solution Batch

L-2020-0022

Summary of Discharge of Liquid Radwaste Batch

L-2021-0199

Summary of Discharge of Steam Generator Blowdown

Corrective Action

Documents

SAPN

50989747, 50989934, 51010140, 51012085, 51016674,

51016807, 51027596, 51032763, 51045953, 51045996,

51046270, 51049034, 51052283, 51052346, 51054226,

51071848, 51071944, 51073191, 51130645

Miscellaneous

2018

Annual Radioactive Effluent Release Report

2019

Annual Radioactive Effluent Release Report

20

Annual Radioactive Effluent Release Report

Procedures

CAP A-5

Liquid Radwaste Discharge Management

CAP A-6

Gaseous Radwaste Sampling and Analysis for Release

35A

CAP A-8

Off-Site Dose Calculations

CAP E-19

Routine Plant Vent Radioactive Effluent Sampling

CAP E-2:II

Laundry and Radwaste Storage Building Ventilation Exhaust

Sampling

CY2

Radiological Monitoring and Controls Program

7B

CY2.ID1

Radioactive Effluent Controls Program

Self-Assessments 1Q-2020

Results of Radiochemistry Cross Check Program - 1st

Quarter 2020

08/24/2021

1Q-2021

Results of Radiochemistry Cross Check Program - 1st

Quarter 2021

03/17/2021

2019

Chemistry and Environmental Operations Programs Audit

2/28/2019

21-IA-01

21 Chemistry and Environmental Operations Audit

2/04/2021

3Q-2019

Results of Radiochemistry Cross Check Program - 3rd

08/24/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Quarter 2019

71124.07

Calibration

Records

231544

Primary MET: Channel Calibration STP I-40-M559.B

2/17/2020

238386

MET2: Facility Cal STP I-40-M569.B

05/12/2021

U-0 64231409

PIC10 Annual Ion Chamber Operations Check at DCPP

Front Gate

2/01/2020

U-0 64231409

PIC10 Annual Ion Chamber Operations Check at DCPP

Front Gate

11/26/2019

Corrective Action

Documents

SAPN

Met Tower: 50995712, 50996614, 51013697, 51015765,

51033552, 51037614, 51045815, 51069240, 51104436

SAPN

Groundwater: 51010140, 51013978, 51027754, 51064339

SAPN

REMP: 50997441, 50999046, 51017921, 51030335,

51032763, 51034964, 51034966, 51039369, 51061783,

51062246, 51064287, 51073870, 51075199, 51084847,

51084991, 51086320, 51087653, 51093742, 51093743,

51107089, 51107300, 51108526

SAPN

Decommissioning [50.75(g)]: 51027318, 51040649,

51064763

Miscellaneous

0-TS-19-0162

Primary MET 10M Aspirator Frequency Bad

06/13/2019

0-TS-19-0229

Primary Met Tower 10M Wind Speed Spiked High

09/19/2019

0-TS-20-0047

Secondary Met2 10m-60m Delta T Bad Data (Aspirator

Failing); Backup Met Tower RFS to Replace YT-544

Aspirator

03/10/2020

2018 AREOR

(DCL-19-029)

Diablo Canyon Annual Radiological Environmental

Operating Report

04/11/2019

2019 AREOR

(DCL-20-010)

Diablo Canyon Annual Radiological Environmental

Operating Report

03/11/2020

2019 Met Tower

Tower and Antenna Installation and Maintenance Report

07/25/2019

2019 Met Tower

Tower and Antenna Installation and Maintenance Report

07/25/2019

20

20 DCPP Land Use Census

20 AREOR

(DCL-21-022)

Diablo Canyon Annual Radiological Environmental

Operating Report

03/13/2021

20 Met Tower

Tower and Antenna Installation and Maintenance Report

08/21/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

20 Met Tower

Tower and Antenna Installation and Maintenance Report

08/21/2020

21

21 DCPP Land Use Census

05/28/2021

20DC-21.01

Diablo Canyon Power Plant XOQDOQ Analysis for Calendar

Year 2020

03/01/2021

Procedures

CAP A-8

Off-Site Dose Calculations

CY2

Radiological Monitoring and Controls Program

7B

CY2.ID1

Radioactive Effluent Controls Program

RCP EM-1

Radiological Environmental Biological Sampling

RCP EM-2

Radiological Environmental Air Sampling

RCP EM-3

Use of Environmental Thermoluminescent Dosimeters

RCP EM-5

DCPP REMP and GPI Groundwater Sampling

RCP EM-6

Radiological Environmental Carbon-14 Air Sampling

RP1.ID11

Environmental Radiological Monitoring Procedure

RP1.ID13

DCPP Groundwater Protection Initiative Program

STP I-40-M559.B

Primary Meteorology Wind Direction, Wind Speed, and Air

Temperature/DT Cal

STP I-40-M569.B

Backup Meteorology Wind Direction, Wind Speed, and Air

Temperature/Delta-T

Self-Assessments 2020-IA-1

20 Radiation Protection Programs Audit

01/29/2020

2018

Radiation Protection Section Annual Review

10/24/2019

2019

Radiation Protection Section Annual Review

08/03/2020

20

Radiation Protection Section Annual Review

2/04/2021

50991783

Groundwater Protection Initiative (GPI) Self-Assessment

2/20/2018

SAQH 51114124

NRC Pre-Inspection 71124.07 Radiological Environmental

Monitoring Program (REMP)

06/24/2021

Work Orders

60095094

Primary Met Tower Needs Re-Coating

07/25/2019

60139235

Primary Met Tower Elevator Pulley

08/24/2021

71151

Corrective Action

Documents

Condition Reports

(SAPN)

51074250, 51074279, 51084303, 51084613, 51085847,

51088188, 51091529, 51107351, 51124920, 51127389,

51127611, 51130490, 51130491

Miscellaneous

PG&E Diablo Canyon Power Plant, Alert and Notification

07/2016

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

System (ANS) Design Report Early Warning System (EWS),

Revision 4

ANS/EWS Growl Test Reports - 4Q/2020 & 2Q/2021

10/7/2020,

04/07/2021

ANS/EWS Annual Full-Scale Audibility Test - 2020

08/22/2020

Form 69-21480

Drill & Exercise Performance (DEP) Performance Indicator

Records - Selected records from 3Q/2020 thru 2Q/2021

Form 69-21482

ANS/EWS Silent Test Reports - Selected Reports from

3Q/2020 thru 2Q/2021

Form 69-21484

ERO Drill Participation Performance Indicator Records -

3Q/2020 through 2Q/2021

Unit 1 MS08

Heat Removal System (AFW) MSPI Derivation Reports

July 2020 thru June 2021

Unit 1 MS08

Heat Removal System (AFW) Tech Spec Tracking Sheet

Source Data July 2020 thru June 2021

Unit 1 MS08

Heat Removal System (AFW) MSPI Margin Reports

July 2020 thru June 2021

Unit 1 MS09

Residual Heat Removal System (RHR) MSPI Derivation

Reports July 2020 thru June 2021

Unit 1 MS09

Residual Heat Removal System (RHR) Tech Spec Tracking

Sheet Source Data July 2020 thru June 2021

Unit 1 MS09

Residual Heat Removal System (RHR) MSPI Margin

Reports July 2020 thru June 2021

Unit 1 MS10

Cooling Water System 1 (CCW) and Cooling Water

System 2 (ASW) MSPI Derivation Reports July 2020 thru

June 2021

Unit 1 MS10

Cooling Water System 1 (CCW) and Cooling Water

System 2 (ASW) Tech Spec Tracking Sheet Source Data

July 2020 thru June 2021

Unit 1 MS10

Cooling Water System 1 (CCW) and Cooling Water

System 2 (ASW) MSPI Margin Reports July 2020 thru June

21

Unit 2 MS08

Heat Removal System (AFW) MSPI Derivation Reports

July 2020 thru June 2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Unit 2 MS08

Heat Removal System (AFW) Tech Spec Tracking Sheet

Source Data July 2020 thru June 2021

Unit 2 MS08

Heat Removal System (AFW) MSPI Margin Reports

July 2020 thru June 2021

Unit 2 MS09

Residual Heat Removal System (RHR) MSPI Derivation

Reports July 2020 thru June 2021

Unit 2 MS09

Residual Heat Removal System (RHR) Tech Spec Tracking

Sheet Source Data July 2020 thru June 2021

Unit 2 MS09

Residual Heat Removal System (RHR) MSPI Margin

Reports July 2020 thru June 2021

Unit 2 MS10

Cooling Water System 1 (CCW) and Cooling Water

System 2 (ASW) MSPI Derivation Reports July 2020 thru

June 2021

Unit 2 MS10

Cooling Water System 1 (CCW) and Cooling Water

System 2 (ASW) Tech Spec Tracking Sheet Source Data

July 2020 thru June 2021

Unit 2 MS10

Cooling Water System 1 (CCW) and Cooling Water

System 2 (ASW) MSPI Margin Reports July 2020 thru June

21

Procedures

AWP EP-001

Emergency Preparedness Performance Indicators

EP MT-43

Early Warning System Testing and Maintenance

71152

Corrective Action

Documents

Notifications

51128659, 51128742, 51128743, 51128793, 51130759

Procedures

CF3.DC1

Maintenance and Surveillance of Electrical Environmentally

Qualified (EQ) Equipment

CF3.DC3

Maintenance of Environmentally Qualified Equipment -

Instrumentation and Controls

0B

OM7.ID1

Problem Identification and Resolution

57