November 03, 2021
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - INTEGRATED INSPECTION REPORT 05000275/2021003 AND 05000323/2021003
Dear Mr. Welsch:
On September 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jeffrey E. Josey, Chief Reactor Projects Branch A Division of Reactor Projects
Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000275 and 05000323
License Numbers:
Report Numbers:
05000275/2021003 and 05000323/2021003
Enterprise Identifier: I-2021-003-0106
Licensee:
Pacific Gas and Electric Company
Facility:
Diablo Canyon Power Plant, Units 1 and 2
Location:
Avila Beach, CA
Inspection Dates:
July 1, 2021, to September 30, 2021
Inspectors:
R. Alexander, Senior Emergency Preparedness Inspector
C. Alldredge, Health Physicist
A. Athar, Acting Senior Resident Inspector
B. Bergeon, Operations Engineer
M. Hayes, Acting Resident Inspector
S. Hedger, Emergency Preparedness Inspector
D. Krause, Senior Resident Inspector
J. O'Donnell, Senior Health Physicist
C. Young, Senior Project Engineer
Approved By:
Jeffrey E. Josey, Chief
Reactor Projects Branch A
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Diablo Canyon Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 operated at or near rated thermal power for the entire inspection period.
Unit 2 operated at or near rated thermal power for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week, increasing the amount of time on-site as local COVID-19 conditions permitted.
As part of their on-site activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; conducted routine reviews using IP 71152, Problem Identification and Resolution; observed risk significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1 emergency diesel generator 1-1 on July 12, 2021
- (2) Unit 1 centrifugal charging pump 1-1 and 1-2 on August 24, 2021
- (3) Unit 1 and 2 seismic monitoring system on September 29, 2021
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 2 fuel handling building on July 1, 2021
- (2) Unit 2 auxiliary building, 73-foot elevation, on July 1, 2021
- (3) Unit 1 and 2 intake structure on July 26, 2021
- (4) Unit 1 auxiliary building, 64-and 73-foot elevations, on August 24, 2021
- (5) Unit 1 turbine building component cooling water heat exchanger room, 85-foot elevation, on September 3, 2021
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) Diesel fuel oil underground vault on August 30, 2021
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during performance of Unit 2 train B slave relay testing per Procedures STP M-16F and STP M-16D on September 1, 2021, and September 12, 2021.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated a crew of licensed operators during simulator training on August 27, 2021, and September 9, 2021.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample, 1 Partial)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
(1)
(Partial)
Unit 2 main generator on September 24, 2021
- (2) Open phase initiative on September 28, 2021
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 1 loss of reactor protection system protection set 4 on July 1, 2021
- (2) Unit 1 auxiliary saltwater pump 1-1 emergent motor replacement on July 5-8, 2021
- (3) Unit 1 auxiliary building ventilation supply fan S-32, emergent maintenance due to slipped fan belt, on August 30, 2021
- (4) Unit 1 emergency diesel generator 1-2, planned 24-hour load test and hot restart surveillance, protected equipment walkdown on September 23, 2021
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples, 1 Partial)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Unit 1 auxiliary building ventilation supply fan S-32 emergent maintenance due to slipped fan belt on August 30, 2021 (2)
(Partial)
Unit 2 emergency diesel generator 2-3 fuel oil leak, common cause operability evaluation on September 13, 2021
- (3) Unit 2 LCV-113 closure time over action high on September 15, 2021
- (4) FLEX diesel light tower oil functionality evaluation on September 17, 2021
- (5) Unit 2 auxiliary feedwater pump 2-1 returned to service with broken speed probe on September 22, 2021
- (6) Unit 1 degraded fire barrier in safety injection pump room functionality evaluation on September 29, 2021
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Unit 2 temporary modification for PC-400 setpoint change, pressurizer relief tank N2 supply, on July 1, 2021
- (2) Telemetry equipment installed on September 1, 2021
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
- (1) Unit 2 component cooling water pump 2-2 post-maintenance test on July 1, 2021
- (2) Unit 2 auxiliary saltwater pump 2-2 post-maintenance test on July 1, 2021
- (3) Unit 1 auxiliary saltwater pump 1-1 after emergent motor replacement on July 8, 2021
- (4) Unit 2 auxiliary saltwater pump 2-1 post-maintenance test on July 19, 2021
- (5) Unit 2 battery charger 232 performance test on August 31, 2021
- (6) Unit 2 residual heat removal pump 2-1 after maintenance activities on September 7, 2021
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
- (1) Emergency core cooling system leakage outside containment, Surveillance Test Procedure M-87, on July 12, 2021
- (2) Unit 2 emergency diesel generator 2-1, 24-hour load test and hot restart test, on September 14, 2021
Inservice Testing (IP Section 03.01) (1 Sample)
- (1) Unit 2 exercising residual heat removal pump 1 suction valve 8700A in-service test per Surveillance Test Procedure V-3M4A on September 8, 2021
FLEX Testing (IP Section 03.02) (1 Sample)
- (1) Units 1 and 2 annual FLEX equipment surveillance testing on July 15, 2021
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
- (1) The inspectors evaluated the biennial emergency plan exercise conducted on September 14 and 15, 2021. The exercise scenario simulated a toxic gas release in the auxiliary building, a steam line break outside containment, an anticipated transient without a reactor scram, a small break loss of coolant accident into containment, and spurious failure of containment isolation valves resulting in a release of radioactive materials offsite requiring the issuance of Protective Action Recommendations to offsite authorities. The exercise also included demonstration of one of the station's extensive damage mitigation guideline strategies per the requirements of 10 CFR 50.155(b)(2).
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The inspectors evaluated the following 10 CFR 50.54(q) change evaluations for Emergency Action Level and Emergency Plan changes:
- Effectiveness Evaluation 2021-10, Revise Section 7.2.1 of the DCPP Emergency Plan, dated 07/12/2021
- LBIE 2004-003, Operations Support Center (OSC) Relocation (Emergency Plan Sections 7.1.4.1 and 7.1.5.1), dated 02/13/2004
This evaluation does not constitute NRC approval.
71114.08 - Exercise Evaluation Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
- (1) The inspectors reviewed the licensee's preliminary exercise scenario that was submitted to the NRC on July 15, 2021, (ADAMS Accession No. ML21196A487) for the exercise scheduled to occur on September 15, 2021. The inspectors discussed the preliminary scenario with Mr. A. Warwick, Manager, Emergency Preparedness, and other members of the emergency preparedness staff on August 16, 2021. The inspectors' review does not constitute NRC approval of the scenario.
RADIATION SAFETY
71124.06 - Radioactive Gaseous and Liquid Effluent Treatment
Walkdowns and Observations (IP Section 03.01) (4 Samples)
The inspectors evaluated the following radioactive effluent systems during walkdowns:
- (1) Unit 1 liquid radwaste system
- (2) Unit 2 liquid radwaste system
- (3) Unit 2 gaseous radwaste system
- (4) Unit 2 auxiliary building ventilation system
Sampling and Analysis (IP Section 03.02) (3 Samples)
Inspectors evaluated effluent samples, sampling processes and compensatory samples, as available.
- (1) Laundry radwaste vent particulate effluent sample - September 21, 2021
- (2) Radwaste vent particulate effluent sample - September 21, 2021
Dose Calculations (IP Section 03.03) (2 Samples)
The inspectors evaluated the following dose calculations:
- (1) Doses to the members of the public associated with gaseous radioactive waste permits: G-2019-0379, G-2020-0373, G-2021-0115
- (2) Doses to the members of the public associated with liquid radioactive waste permits:
L-2019-0604, L-2020-0022, L-2021-0199
Abnormal Discharges (IP Section 03.04)
There were no abnormal discharges during the assessment period.
71124.07 - Radiological Environmental Monitoring Program
Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.
Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.
Groundwater Protection Initiative Implementation (IP Section 03.03) (1 Sample)
- (1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative program to identify incomplete or discontinued program elements.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS08: Heat Removal Systems (IP Section 02.07)===
- (1) Unit 1 (July 1, 2020, through June 30, 2021)
- (2) Unit 2 (July 1, 2020, through June 30, 2021)
MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)
- (1) Unit 1 (July 1, 2020, through June 30, 2021)
- (2) Unit 2 (July 1, 2020, through June 30, 2021)
MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)
- (1) Unit 1 (July 1, 2020, through June 30, 2021)
- (2) Unit 2 (July 1, 2020, through June 30, 2021)
EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)
- (1) July 1, 2020, through June 30, 2021
EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
- (1) July 1, 2020, through June 30, 2021
EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
- (1) July 1, 2020, through June 30, 2021
71152 - Problem Identification and Resolution
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Labeling of environmentally qualified devices on September 21,
INSPECTION RESULTS
Observation: Failure to Label Environmentally Qualified (EQ) Devices 71152 In July 2021, the NRCs power-operated valves design basis assurance team identified issues associated with the stations failure to adequately label an environmentally-qualified motor-operated valve. The licensees Procedure CF3.DC1, Maintenance and Surveillance of Electrical Environmentally Qualified Equipment, Section 5.3.3, required EQ devices to be identified by tags or labels in such a manner as to clearly inform any personnel working with the equipment that the equipment is environmentally qualified. The inspectors followed up on this issue and identified three additional EQ motor-operated valves that were not labeled as well as one electrical penetration box with a badly degraded EQ identification sign.
Subsequently, the licensee performed a partial extent-of-condition walkdown on EQ electrical penetrations and motor-operated valves. From the sample of EQ devices examined by the licensee, 51 percent of motor-operated valves and 15 percent of electrical penetrations were missing EQ labeling. The stations work control process identifies any EQ component involved in work orders as such, and the inspectors did not identify any work orders where an EQ component was not identified as such. The stations corrective actions include revising EQ program procedures to remove the requirement for labeling EQ devices.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On September 16, 2021, the inspectors presented the emergency preparedness exercise scenario review inspection results to Mr. A. Warwick, Manager, Emergency Preparedness, and other members of the licensee staff.
- On September 23, 2021, the inspectors presented the public radiation safety inspection results to Ms. P. Gerfen, Site Vice President, and other members of the licensee staff.
- On September 30, 2021, the inspectors presented the integrated inspection results to Mr. J. Welsch, Senior Vice President and Chief Nuclear Officer, and other members of the licensee staff.
- On October 14, 2021, the inspectors presented the emergency preparedness exercise inspection results to Ms. P. Gerfen, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
CP M-4
OP B-1A:IX
CVCS - Alignment Verification for Plant Startup
OP J-6B:I-A
Diesel Generator 1-1 - Alignment Checklist
STP I-1D
Routine Monthly Checks Required by Licenses
101
Drawings
PA-1
Intake Structure Unit 1 & 2
Radiological Control Area (RCA) Elev. 140 Foot
RA-3
Radiological Control Area (RCA) Elev. 73 Foot
TB-3
Turbine Building Elev. 85'
Corrective Action
Documents
Notifications
50514804, 51129427, 51129428
Miscellaneous
DCM No. S-21
Design Criteria Memorandum S-21, Diesel Engine System
29A
DCN 0-EJ-
049147
Design Change Notice
Procedures
AD7.DC8
Work Planning
MA1.ID27
Preventive Maintenance Program
Work Orders
71111.11Q Procedures
STP M-16D
Operation of Train B Slave Relay K608 (Safety Injection)
STP M-16F
Test Train B Slave Relays K609 (Safety Injection) and K633
(AFW Pump 2 Start)
Work Orders
WO 245985, 64247518
Corrective Action
Documents
Notifications
51092854, 51131022
Work Orders
WO 60124475, 60131677, 60135509, 64246147, 64246149,
246151, 64246152, 64256889, 64256890
Corrective Action
Documents
Notifications
51124067, 51124874, 51124896, 51126613, 51129597
Procedures
AD7.DC6
On-Line Maintenance Risk Management
AD7.ID14
Assessment of Integrated Risk
AD7.ID14,
Risk Management Plan: ASW 1-1 Motor Swap within 75% of
07/07/2021
OP AP-11
Malfunction of Component Cooling Water System
35A
OP O-36
Protected Equipment Postings
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
OP1.DC40,
Adverse Condition Monitoring Plan: Brief Aux Operator on
Loss of CCW
07/07/2021
STP I-36-R15
Eagle 21 Rack 15 Remove from Service and Return to
Service
TS5.ID1
System Engineering Program
Work Orders
Corrective Action
Documents
Notifications
50990566, 50990713, 51117656, 51124036, 51124262,
51126109, 51127556, 51130369, 51130794, 51131296,
51131646
Miscellaneous
DC-663056-45
Instruction Manual Aux Feedwater Pump Turbine
03/28/1990
Procedures
STP V-3P6B
Exercising Valves LCV-115 and 113 Auxiliary Feedwater
Pump Discharge
STP M-70A
Inspection of Fire Barrier and HELB Penetration Seals
Work Orders
60136888, 64233943, 64247827
Corrective Action
Documents
Notifications
51116564, 51123490, 51123492
Miscellaneous
60138317
Engineering Change Order TMOD(E) PC-400 Setpoint
Change
06/28/2021
Procedures
CF3.ID9
Design Change Development
CF4.ID7
Temporary Alteration
CF4.ID8
Temporary Attachments
5A
MA1.ID8
Control of Temporary Rigging from Plant Equipment, Piping
and Structural Members
3A
MP I-7-P400
Unit 2 Pressurizer Relief Tank Nitrogen Supply Pressure
Control PC-400 Calibration
Work Orders
WO 60138317, 60138318
Corrective Action
Documents
Notifications
51124688, 51124696, 51124787, 51124869, 51124874,
51130296
Miscellaneous
Unit 2 Shift Log
Test Run of CCW Pump 2-2
07/01/2021
Procedures
STP M-12B
Battery Charger Performance Test
STP M-26
ASW System Flow Monitoring
STP P-ASW-21
Routine Surveillance Test of Auxiliary Saltwater Pump 2-1
STP P-ASW-22
Routine Surveillance Test of Auxiliary Saltwater Pump 2-2
30A
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
STP P-ASW-A11
Comprehensive Test of Auxiliary Saltwater Pump 1-1
13A
Work Orders
WO 64141889, 64207645, 64237661, 64238494, 64238707,
242008, 64242834, 64247481,
Corrective Action
Documents
Notifications
51125156, 51125158, 51130483
Procedures
STP M-87
Operational Leakage of ECCS Recirc Paths Outside
Containment
STP M-9G
Diesel Generator 24 Hour Load Test and Hot Restart Test
59B
Work Orders
WO 202944, 64218720, 64239789, 64239820
Corrective Action
Documents
Condition Reports
(SAPN)
50877657, 50877827, 50878454, 51002781, 51002784,
51002933, 51002934, 51012155, 51014007, 51014388,
51022745, 51027821, 51030432, 51033084, 51033263,
51034921, 51035836, 51038196, 51074250, 51074279,
51086215, 51086295, 51086369, 51086464, 51088328,
51088376, 51088428, 51096699, 51096940, 51105902,
51123681, 51123775, 51126199, 51130932, 51130934,
51130960, 51131303, 51131377, 51131976, 51132033,
51132088
Corrective Action
Documents
Resulting from
Inspection
Condition Reports
(SAPN)
51131375, 51133318, 51133319, 51133360, 51133362
Miscellaneous
Diablo Canyon Power Plant Management Critique and
Debrief: September 14th & 15th, 2021 Evaluated Exercise
Performance Summary
09/29/2021
Procedures
CAP A-4
Laboratory Instrumentation Calibration and Routine
Maintenance Schedule
CAP B-53:III
Operation of the Canberra APEX Gamma Spectroscopy
System
EDMG EDCG-1
ERO Guidance for Extensive Plant Damage Mitigation
1A
EDMG EDG-4
Spent Fuel Pool Leakage Control Strategies
EOF FR-P.1
U1, Response to Imminent Pressurized Thermal Shock
Condition
EOP E-0
Reactor Trip of Safety Injection
45D
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
EOP E-1.2
Post-LOCA Cooldown and Depressurization
23A
EP EF-1
Activation and Operation of the Technical Support Center
EP EF-2
Activation and Operation of the Operational Support Center
EP EF-3
Activation and Operation of the Emergency Operations
Facility
EP G-2
Interim Emergency Response Organization
EP G-3
Emergency Notification of Off-Site Agencies
EP RB-10
Protective Action Recommendations
EP RB-12
Plant Vent Iodine and Particulate Sampling During Accident
Conditions
EP RB-14A
Initial Detection of Fuel Cladding Damage
EP RB-3
Stable Iodine Thyroid Blocking
OP AP-22
Spent Fuel Pool Abnormalities
Miscellaneous
DCPP Emergency Plan, Section 7, Emergency Facilities and
Equipment
5.03
50.54(q)
Effectiveness
Evaluation 2021-
Implement Phase 3 of the PBX Phone System
Upgrade/Replacement
07/12/2021
LBIE 2004-003
Operations Support Center (OSC) Relocation (Emergency
Plan Sections 7.1.4.1 and 7.1.5.1)
2/13/2004
Procedures
OM10.ID2
Emergency Plan Revision and Review
13A
Miscellaneous
Docket No. 50-275, OL-DPR-80; Docket No. 50-323,
OL-DPR-82; Diablo Canyon Units 1 and 2; Materials License
No. SNM-2511, Docket No. 72-26, Diablo Canyon
Independent Spent Fuel Storage Installation; Biennial
Exercise Scenario Data Package for the 2021 Evaluated
Exercise
07/15/2021
Procedures
EDMG EDCG-1
ERO Guidance for Extensive Plant Damage Mitigation
1A
EMDG EDG-4
Spent Fuel Pool Leakage Control Strategies
EP G-1
Emergency Classification and Emergency Plan Activation
EP G-3
Emergency Notification of Off-Site Agencies
EP RB-10
Protective Action Recommendations
EP RB-12
Plant Vent Iodine and Particulate Sampling During Accident
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Conditions
EP RB-14A
Initial Detection of Fuel Cladding Damage
OP AP-22
Spent Fuel Pool Abnormalities
Calculations
G-2019-0379
Unit 2 Summary of Discharge of Plant Vent
2/05/2019
G-2020-0373
Summary of Discharge of Miscellaneous Release Source
2/22/2020
G-2021-0115
Summary of Containment Atmosphere Discharge, MODES
1-4
04/15/2021
Summary of Discharge of Condensate Demineralizer
Regenerate Solution Batch
Summary of Discharge of Liquid Radwaste Batch
Summary of Discharge of Steam Generator Blowdown
Corrective Action
Documents
SAPN
50989747, 50989934, 51010140, 51012085, 51016674,
51016807, 51027596, 51032763, 51045953, 51045996,
51046270, 51049034, 51052283, 51052346, 51054226,
51071848, 51071944, 51073191, 51130645
Miscellaneous
2018
Annual Radioactive Effluent Release Report
2019
Annual Radioactive Effluent Release Report
20
Annual Radioactive Effluent Release Report
Procedures
CAP A-5
Liquid Radwaste Discharge Management
CAP A-6
Gaseous Radwaste Sampling and Analysis for Release
35A
CAP A-8
Off-Site Dose Calculations
CAP E-19
Routine Plant Vent Radioactive Effluent Sampling
CAP E-2:II
Laundry and Radwaste Storage Building Ventilation Exhaust
Sampling
CY2
Radiological Monitoring and Controls Program
7B
CY2.ID1
Radioactive Effluent Controls Program
Self-Assessments 1Q-2020
Results of Radiochemistry Cross Check Program - 1st
Quarter 2020
08/24/2021
Results of Radiochemistry Cross Check Program - 1st
Quarter 2021
03/17/2021
2019
Chemistry and Environmental Operations Programs Audit
2/28/2019
21-IA-01
21 Chemistry and Environmental Operations Audit
2/04/2021
Results of Radiochemistry Cross Check Program - 3rd
08/24/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Quarter 2019
Calibration
Records
231544
Primary MET: Channel Calibration STP I-40-M559.B
2/17/2020
238386
MET2: Facility Cal STP I-40-M569.B
05/12/2021
U-0 64231409
PIC10 Annual Ion Chamber Operations Check at DCPP
Front Gate
2/01/2020
U-0 64231409
PIC10 Annual Ion Chamber Operations Check at DCPP
Front Gate
11/26/2019
Corrective Action
Documents
SAPN
Met Tower: 50995712, 50996614, 51013697, 51015765,
51033552, 51037614, 51045815, 51069240, 51104436
SAPN
Groundwater: 51010140, 51013978, 51027754, 51064339
SAPN
REMP: 50997441, 50999046, 51017921, 51030335,
51032763, 51034964, 51034966, 51039369, 51061783,
51062246, 51064287, 51073870, 51075199, 51084847,
51084991, 51086320, 51087653, 51093742, 51093743,
51107089, 51107300, 51108526
SAPN
Decommissioning [50.75(g)]: 51027318, 51040649,
51064763
Miscellaneous
0-TS-19-0162
Primary MET 10M Aspirator Frequency Bad
06/13/2019
0-TS-19-0229
Primary Met Tower 10M Wind Speed Spiked High
09/19/2019
0-TS-20-0047
Secondary Met2 10m-60m Delta T Bad Data (Aspirator
Failing); Backup Met Tower RFS to Replace YT-544
Aspirator
03/10/2020
2018 AREOR
Diablo Canyon Annual Radiological Environmental
Operating Report
04/11/2019
2019 AREOR
Diablo Canyon Annual Radiological Environmental
Operating Report
03/11/2020
2019 Met Tower
Tower and Antenna Installation and Maintenance Report
07/25/2019
2019 Met Tower
Tower and Antenna Installation and Maintenance Report
07/25/2019
20
20 DCPP Land Use Census
20 AREOR
Diablo Canyon Annual Radiological Environmental
Operating Report
03/13/2021
20 Met Tower
Tower and Antenna Installation and Maintenance Report
08/21/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
20 Met Tower
Tower and Antenna Installation and Maintenance Report
08/21/2020
21
21 DCPP Land Use Census
05/28/2021
20DC-21.01
Diablo Canyon Power Plant XOQDOQ Analysis for Calendar
Year 2020
03/01/2021
Procedures
CAP A-8
Off-Site Dose Calculations
CY2
Radiological Monitoring and Controls Program
7B
CY2.ID1
Radioactive Effluent Controls Program
RCP EM-1
Radiological Environmental Biological Sampling
RCP EM-2
Radiological Environmental Air Sampling
RCP EM-3
Use of Environmental Thermoluminescent Dosimeters
RCP EM-5
DCPP REMP and GPI Groundwater Sampling
RCP EM-6
Radiological Environmental Carbon-14 Air Sampling
RP1.ID11
Environmental Radiological Monitoring Procedure
RP1.ID13
DCPP Groundwater Protection Initiative Program
STP I-40-M559.B
Primary Meteorology Wind Direction, Wind Speed, and Air
Temperature/DT Cal
STP I-40-M569.B
Backup Meteorology Wind Direction, Wind Speed, and Air
Temperature/Delta-T
Self-Assessments 2020-IA-1
20 Radiation Protection Programs Audit
01/29/2020
2018
Radiation Protection Section Annual Review
10/24/2019
2019
Radiation Protection Section Annual Review
08/03/2020
20
Radiation Protection Section Annual Review
2/04/2021
50991783
Groundwater Protection Initiative (GPI) Self-Assessment
2/20/2018
SAQH 51114124
NRC Pre-Inspection 71124.07 Radiological Environmental
Monitoring Program (REMP)
06/24/2021
Work Orders
60095094
Primary Met Tower Needs Re-Coating
07/25/2019
60139235
Primary Met Tower Elevator Pulley
08/24/2021
71151
Corrective Action
Documents
Condition Reports
(SAPN)
51074250, 51074279, 51084303, 51084613, 51085847,
51088188, 51091529, 51107351, 51124920, 51127389,
51127611, 51130490, 51130491
Miscellaneous
PG&E Diablo Canyon Power Plant, Alert and Notification
07/2016
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
System (ANS) Design Report Early Warning System (EWS),
Revision 4
ANS/EWS Growl Test Reports - 4Q/2020 & 2Q/2021
10/7/2020,
04/07/2021
ANS/EWS Annual Full-Scale Audibility Test - 2020
08/22/2020
Form 69-21480
Drill & Exercise Performance (DEP) Performance Indicator
Records - Selected records from 3Q/2020 thru 2Q/2021
Form 69-21482
ANS/EWS Silent Test Reports - Selected Reports from
3Q/2020 thru 2Q/2021
Form 69-21484
ERO Drill Participation Performance Indicator Records -
3Q/2020 through 2Q/2021
Unit 1 MS08
Heat Removal System (AFW) MSPI Derivation Reports
July 2020 thru June 2021
Unit 1 MS08
Heat Removal System (AFW) Tech Spec Tracking Sheet
Source Data July 2020 thru June 2021
Unit 1 MS08
Heat Removal System (AFW) MSPI Margin Reports
July 2020 thru June 2021
Unit 1 MS09
Residual Heat Removal System (RHR) MSPI Derivation
Reports July 2020 thru June 2021
Unit 1 MS09
Residual Heat Removal System (RHR) Tech Spec Tracking
Sheet Source Data July 2020 thru June 2021
Unit 1 MS09
Residual Heat Removal System (RHR) MSPI Margin
Reports July 2020 thru June 2021
Unit 1 MS10
Cooling Water System 1 (CCW) and Cooling Water
System 2 (ASW) MSPI Derivation Reports July 2020 thru
June 2021
Unit 1 MS10
Cooling Water System 1 (CCW) and Cooling Water
System 2 (ASW) Tech Spec Tracking Sheet Source Data
July 2020 thru June 2021
Unit 1 MS10
Cooling Water System 1 (CCW) and Cooling Water
System 2 (ASW) MSPI Margin Reports July 2020 thru June
21
Unit 2 MS08
Heat Removal System (AFW) MSPI Derivation Reports
July 2020 thru June 2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Unit 2 MS08
Heat Removal System (AFW) Tech Spec Tracking Sheet
Source Data July 2020 thru June 2021
Unit 2 MS08
Heat Removal System (AFW) MSPI Margin Reports
July 2020 thru June 2021
Unit 2 MS09
Residual Heat Removal System (RHR) MSPI Derivation
Reports July 2020 thru June 2021
Unit 2 MS09
Residual Heat Removal System (RHR) Tech Spec Tracking
Sheet Source Data July 2020 thru June 2021
Unit 2 MS09
Residual Heat Removal System (RHR) MSPI Margin
Reports July 2020 thru June 2021
Unit 2 MS10
Cooling Water System 1 (CCW) and Cooling Water
System 2 (ASW) MSPI Derivation Reports July 2020 thru
June 2021
Unit 2 MS10
Cooling Water System 1 (CCW) and Cooling Water
System 2 (ASW) Tech Spec Tracking Sheet Source Data
July 2020 thru June 2021
Unit 2 MS10
Cooling Water System 1 (CCW) and Cooling Water
System 2 (ASW) MSPI Margin Reports July 2020 thru June
21
Procedures
AWP EP-001
Emergency Preparedness Performance Indicators
EP MT-43
Early Warning System Testing and Maintenance
Corrective Action
Documents
Notifications
51128659, 51128742, 51128743, 51128793, 51130759
Procedures
CF3.DC1
Maintenance and Surveillance of Electrical Environmentally
Qualified (EQ) Equipment
CF3.DC3
Maintenance of Environmentally Qualified Equipment -
Instrumentation and Controls
0B
OM7.ID1
Problem Identification and Resolution
57