NRC Initial Operator Licensing Examination Approval 05000275/2016302; 05000323/2016302
ML16278A609
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/04/2016
From: Vincent Gaddy
Operations Branch IV
To: Halpin E
Pacific Gas & Electric Co
References
IR 50-275/OL-16, IR 50-323/OL-16
Download: ML16278A609 (3)


See also: IR 05000275/2016302

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

October 4, 2016

Mr. Edward D. Halpin, Senior Vice President,

Generation and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INITIAL

OPERATOR LICENSING EXAMINATION APPROVAL 05000275/2016302;

05000323/2016302

Dear Mr. Halpin:

The purpose of this letter is to confirm the final arrangements for the upcoming operator

licensing examinations at the Diablo Canyon Power Plant.

The NRC has completed its review of the operator license applications submitted in connection

with this examination and separately provided a list of approved applicants to R. Fortier, Lead

Examination Developer. Note that any examination waivers and application denials have been

addressed in separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations and

you may administer the written examinations in accordance with Revision 10, of NUREG-1021,

Operator Licensing Examination Standards for Power Reactors, on October, 14, 2016. The

NRC staff will administer the operating tests during the week of October 17, 2016. This

examination has undergone extensive review by my staff and representatives responsible for

licensed operator training at your facility. Based on this review I have concluded that the

examination meets the guidelines of NUREG-1021 for content, operational, and discrimination

validity. By administering this examination, you also agree that it meets NUREG-1021

guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at

your facility. If you determine that this examination is not appropriate for licensing operators at

your facility, do not administer the examination and contact me at (817) 200-1159.

Please contact your Chief Examiner, Mike Bloodgood, at (817) 200-1544, if you have any

questions or identify any errors or changes in the license level (RO or SRO) or type of

examination (partial or complete written examination and/or operating test) specified for each

applicant.

Sincerely,

/RA/

Vincent Gaddy, Chief

Operations Branch

Division of Reactor Safety

Pacific Gas and Electric Company -2-

Dockets: 50-275; 50-323

Licenses: DPR-80; DPR-82

Enclosure: ES-201-4

cc w/enclosure:

Ron Fortier, Lead Examination Developer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56

Avila Beach, CA 93424

cc w/o enclosure:

Distribution via ListServ for Diablo Canyon

Pacific Gas and Electric Company -3-

Electronic distribution by RIV:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Christopher.Newport@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)

Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer, DRP/A (Matthew.Kirk@nrc.gov)

Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Branch Chief, DRS/OB (Vincent.Gaddy@nrc.gov)

X SUNSI Review ADAMS X Publicly Available X Non-Sensitive Keyword:

By: lah X Yes No Non-Publicly Available Sensitive NRR-79

OFFICE RIV:DRS:OB SOE:OB C:OB

NAME LAHurley MBloodgood VGGaddy

SIGNATURE /RA/ /RA/ /RA/

DATE 10/03/16 10/03/16 10/04/16

OFFICIAL RECORD COPY