DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure

From kanterella
(Redirected from ML23221A086)
Jump to navigation Jump to search
Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure
ML23221A086
Person / Time
Site: Diablo Canyon, 05000276
Issue date: 07/27/2023
From: Rogers J
Pacific Gas & Electric Co
To: Robert Lewis
Region 4 Administrator
References
DCL-23-065
Download: ML23221A086 (1)


Text

In Pacific Gas and Electric Company"'

Justin E. Rogers Director Diablo Canyon Power Plan!

Mail code 104/5/502 Nuclear Training and P.O. Box 56 Accreditation Avila Beach, CA 93424 805.545.3088 Justin.Rogers@pge.com PG&E Letter DCL-23-065 Mr. Robert J. Lewis, Acting Regional Administrator 10 CFR 55.5 U.S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington , TX 76011-4511 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Request That Exam Material Be Withheld from Public Disclosure

References:

1. NRC Letter, G. Werner to J. Welsch, "DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EXAMINATION REPORT 05000275/2021301 AND 05000323/2021301," dated March 18, 2021 [ADAMS Accession No. ML21076A614]

Dear Mr. Lewis:

Reference 1 indicates that the final written examinations and final operating test from the Initial Operator Licensing Examinations administered at Diablo Canyon Power Plant (DCPP) in January and February 2021 will be withheld from public disclosure until August 12, 2023. Pacific Gas and Electric Company (PG&E) requests this material be withheld from public disclosure through September 2024, to allow its use as an evaluation tool for the upcoming initial license candidates.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

Should you have any questions, please contact Mr. Abdul W. Kadir, Manager, Initial Licensing Training, Exams, and Simulator, at 805-545-4200.

Sincerely,

~ /4:.Y /"f,l-1'11/<,I/ /J,Jt-Kt[(.. ('i,'2

¢~fa 1- / :1..tJ 2-J Justin E. Rogers 7 Date A m embe r of t he STARS All i ance Ca l laway

  • Diablo Cany on
  • Palo Ve rd e
  • Wo l f Cr eek

Mr. Robert J. Lewis PG&E Letter DCL-23-065 Page 2 cc: Kelly D. Clayton, NRC Region IV Heather J . Gepford, Ph.D., CHP, Chief, Operations Branch, NRC Region IV Mahdi 0. Hayes, NRC Senior Resident Inspector Nicholas A. Hernandez, NRC Region IV Abdul W. Kadir, Manager, Initial Licensing Training, Exams, and Simulator Natalia Salazar, Licensing Assistant, Operations Branch, NRC Region IV Shannan D. Tolley, Operations Training Coordinator A member of the STARS Alliance Callaway* Diablo Canyon

  • Pa l o Verde* Wolf Cree k