ML18134A057
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/14/2018
From: Gerfen P
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PG&E DCL-18-039, RIS 2018-002
Download: ML18134A057 (3)


Text

Pacific Gas and Electric Company*

Paula Garten Diablo Canyon Power Plant Station Director Mail code 104151502 P.O. Box 56 Avila Beach, CA93424 805.545.4596 Internal: 691 .4596 Fax: 545.4234 May 14, 2018 PG&E DCL-18-039 U.S. Nuclear Regulatory Commission 10 CFR Part 55 ATTN : Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No . 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Pacific Gas and Electric Company (PG&E) Response to NRC Regulatory Issue Summary (RIS) 2018-02, "Preparation and Scheduling of Operator Licensing Examinations"

Dear Commissioners and Staff:

As requested in RIS 2018-02, PG&E voluntarily provides the enclosed proposed operator license examination schedules and the number of applicants, as delineated on NRC Form 536, for the years 2020 through 2023. Also included is an updated Form 536 for 2019.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions, please contact Mr. Shane Guess, Operations Train ing Manager, at (805) 545-4692 .

Paul~ a:::GT mem6/4539 Enclosure cc/enc: Vincent G. Gaddy, Chief Operations Branch, NRC Region IV Shane M. Guess, Operations Training Manager Abdu l Kadir, Simulator and Exam Support Supervisor Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager A member of the STARS Alliance Callawa y

  • Diablo Canyon
  • Palo Verd e
  • Wolf Creek

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION

!Diablo Canyon A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 19 CY CY CY ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 19 CY CY CY NUMBER OF REACTOR OPERATORS 7 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 4 NUMBER OF SENIOR REACTOR OPERATORS -UPGRADE 1 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 PROPOSED DATES PRIMARY DATE 1/14/19 ALTERNATE DATE 217/19 NRC FORM 536 (1 1-2017)

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11130/2020 (11-2017)

VC....J:"R REGu<...,_..

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

.. 0~

r:;

~

~

<,...1-o?

¥-o'ro

~

f 0

0

~

OPERATOR LICENSING EXAMINATION DATA information collection is used to plan budgets and resources for operator examinations. Send ccmments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office

    • *... of Management and Budget, Washington, DC 20503. If a means used to impose an information ccllection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION lr

!Diablo Caoyoo I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 NUMBER OF REACTOR OPERATORS 9 8 8 0 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 6 8 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 2/24/20 2/22/21 2/28/22 NA ALTERNATE DATE 1/27/20 1/25/21 1/24/22 NA NRC FORM 536 (11-2017)