ML18064A355
ML18064A355 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 02/09/2018 |
From: | Vincent Gaddy Operations Branch IV |
To: | Pacific Gas & Electric Co |
References | |
Download: ML18064A355 (180) | |
Text
U.S. Nuclear Regulatory Commission Diablo Canyon RO Written Examination Applicant Information Name: KEY Date: 9 February, 2018 Facility/Unit: Diablo Canyon Region: I II III IV Reactor Type: W CE BW GE Start Time: Finish Time:
Instructions Key Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets.
To pass the examination, you must achieve a final grade of at least 80 percent. Examination sw papers will be collected 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after the examination begins erApplicant Certification All work done on this examination is my own. I have neither given nor received aid.
Results Examination Value An Applicants Signature
__________ Points Applicants Score __________ Points 62 Applicants Grade __________ Percent L1
U.S. Nuclear Regulatory Commission Diablo Canyon SRO Written Examination Applicant Information Name: KEY Date: 9 February, 2018 Facility/Unit: Diablo Canyon Region: I II III IV Reactor Type: W CE BW GE Start Time: Finish Time:
Instructions Ke Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets.
y To pass the examination, you must achieve a final grade of at least 80 percent overall, with 70 percent or better on the SRO-only items. You have 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> to complete the combined examination.
swer Applicant Certification All work done on this examination is my own. I have neither given nor received aid.
An RO/SRO-Only/Total Examination Values Applicants Signature Results
/ / Points Applicants Scores / / Points 62 Applicants Grade / / Percent L1
DCPP L162 NRC Exam 9 February 2018 Multiple Choice (Circle your choice) NAME:___ KEY_______
If you change your answer, write your selection in the blank and initial.
- 1. A B C D 26. A B C D
- 2. A B C D 27. A B C D
- 3. A B C D 28. A B C D
- 4. A B C D 29. A B C D 5.
6.
A A
A B
B B
C C
C D
D D
Key 30.
31.
A A
A B
B B
C C
C D
D D
- 7. 32.
- 8. A B C D 33. A B C D 9.
10.
11.
A A
A B
B B
C C
C D
D D
swer 34.
35.
36.
A A
A B
B B
C C
C D
D D
- 12. A B C D 37. A B C D A B C D A B C D 13.
14.
15.
A A
B B
C C
AnD D
38.
39.
40.
A A
B B
C C
D D
- 16. A B C D 41. A B C D 17.
18.
62 A
A B
B C
C D
D 42.
43.
A A
B B
C C
D D
L1 19.
20.
21.
A A
A B
B B
C C
C D
D D
44.
45.
46.
A A
A B
B B
C C
C D
D D
- 22. A B C D 47. A B C D
- 23. A B C D 48. A B C D
- 24. A B C D 49. A B C D
- 25. A B C D 50. A B C D i
DCPP L162 NRC Exam 9 February 2018 Multiple Choice (Circle your choice) NAME:__KEY_____
- Question deleted. See If you change your answer, write your selection in the blank and initial. Exam Report 2018-301 for details.
- 51. A B C D 76*. A B C D
- 52. A B C D 77. A B C D
- 53. A B C D 78. A B C D
- 54. A B C D 79. A B C D 55.
56.
A A
A B
B B
C C
C D
D D
Key 80.
81.
A A
A B
B B
C C
C D
D D
- 57. 82.
- 58. A B C D 83. A B C D 59.
60.
61.
A A
A B
B B
C C
C D
D D
swer 84.
85.
86.
A A
A B
B B
C C
C D
D D
- 62. A B C D 87. A B C D A B C D A B C D 63.
64.
65.
A A
B B
C C
AnD D
88.
89.
90.
A A
B B
C C
D D
- 66. A B C D 91. A B C D 67.
68.
62 A
A B
B C
C D
D 92.
93.
A A
B B
C C
D D
L1 69.
70.
71.
A A
A B
B B
C C
C D
D D
94.
95.
96.
A A
A B
B B
C C
C D
D D
- 72. A B C D 97. A B C D
- 73. A B C D 98. A B C D
- 74. A B C D 99. A B C D
- 75. A B C D 100. A B C D ii
Examination Outline Cross-Reference Level RO 003 K4.04 Knowledge of RCPS design feature(s) and/or Tier # 2 interlock(s) which provide for the following: Adequate cooling of Group # 1 RCP motor and seals K/A # 003 K4.04 Rating 2.8 Question 01 A steam break occurs inside containment on Unit 1.
Containment pressure peaks at 15 psig.
- 1) Cooling to the RCP #1 Seals has been:
- 2) Cooling to the RCP bearing oil coolers has been:
A. 1) maintained throughout the event
- 2) maintained throughout the event B. 1) isolated Key
- 2) maintained throughout the event C. 1) isolated
- 2) isolated sw D. 1) maintained throughout the event
- 2) isolated er Proposed Answer: A. 1) maintained throughout the event
- 2) maintained throughout the event Explanation:
An A. Correct. Phase A isolates seal return from the #1 RCP seals to the VCT and directs it to the PRT, however, as long as FCV-128 is still open (is not closed by phase A), backpressure will continue to supply charging to the seals. NOTE, in the EOPs, the crew is instructed to "maintain 8 to 13 gpm to RCP seals". Bearing oil coolers lose CCW cooling if Phase B 62 actuates, (22 psig) Note, if Phase B actuates, then cooling would be lost to both the thermal barrier and the oil coolers..
B. Incorrect. Plausible if its assumed that the seal cooling is lost when phase A actuates (containment pressure of 3 psig), this does stop charging injection, thru FCV-128 via the L1 normal flowpath however the thermal barrier is still cooled by CCW Cooling to the motor oil coolers is maintained because containment pressure remained less than the Phase B setpoint.
C. Incorrect. Plausible if either its assumed that containment pressure rose above the Phase B setpoint or its thought both are lost at the Phase A setpoint of 3 psig.
D. Incorrect. Plausible - cooling is maintained to the #1 seal and its thought that motor oil coolers lose cooling at Phase A or Phase B setpoint was exceeded but that cooling is maintained to the #1 seal solely by RCS flowing past the seal.
Technical
References:
LA6 References to be provided to applicants during exam: None Learning Objective:State the purpose of RCP components. (35737)
Question Source: Bank #
DCPP L162 Exam Rev 0
(note changes; attach parent) Modified Bank #
New X Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.7 Difficulty: 2.0 Key swer An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO 004 K5.14 -Knowledge of the operational implications of the Tier # 2 following concepts as they apply to the CVCS: Group # 1 Reduction process of gas concentration in RCS: K/A # 004 K5.14
- vent accumulated non-condensable gases from PZR Rating 2.5 bubble space,
- depressurized during cooldown or
- by alternately heating and cooling (spray) within allowed pressure band (drive more gas out of solution)
Question 02 GIVEN:
- Unit 1 is in MODE 5
- RCS is intact
- VCT gas space is aligned to its normal shutdown gas supply
- RCS loops are filled Key The crew has completed venting the RCS and pressurizer in accordance with OP A-2:I, Reactor Vessel - Filling and Venting the RCS.
head or pressurizer.
sw
- 1) According to a CAUTION in OP A-2:I, if RCS pressure is allowed to lower to less than VCT pressure, a potential consequence is that a _________ bubble will collect in the reactor vessel er
- 2) Removal of this bubble will require ___________.
A. 1) hard 2) raising RCS pressure B. 1) hard An 2) venting C. 1) potentially explosive 2) raising RCS pressure D. 1) potentially explosive 2) venting 62 Proposed Answer: B. 1) hard 2) venting Explanation:
NOTE, normal at power gas supply to the VCT is hydrogen which is explosive. When shutdown, L1 a blanket of nitrogen, not explosive, is put on the VCT. The candidate must know what the shutdown gas in the VCT is, what type of bubble could form and then how its removed.
A. Incorrect. the caution states that if RCS pressure drops below VCT pressure, a "hard bubble of VCT gases" could collect in the vessel head or pressurizer. Venting would be required.
Raising pressure could be believed in the case that its believed a hard bubble may be removed this way (method of removal for a saturated bubble) OR its believed that raising pressure will force the gas back the VCT B. Correct. Nitrogen is the gas in the VCT when shutdown and could migrate to the vessel head or pressurizer. Removal of any hard bubble is to vent the head (or pressurizer).
C. Incorrect. Normal, at power, gas in the VCT is hydrogen which is potentially explosive, nitrogen is not. If it assumed nitrogen is also explosive, this is feasible. Venting would be required. Raising pressure could be believed in the case that its believed a hard bubble may be removed this way (method of removal for a saturated bubble) OR its believed that DCPP L162 Exam Rev 1
raising pressure will force the gas back the VCT D. Incorrect. Normal gas in the VCT is hydrogen which is potentially explosive, nitrogen is not. If it assumed nitrogen is also explosive, this is feasible. Venting is the method of removal..
Technical
References:
OP A-2:I.
References to be provided to applicants during exam: None Learning Objective: 5093 -Discuss significant precautions and limitations associated with the CVCS Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental 10CFR Part 55 Content:
Difficulty: 3.0 55.41.5 Ke Comprehensive/Analysis y
X swer An 62 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 005 G2.4.4 RHR: Ability to recognize abnormal indications for Group # 1 system operating parameters that are entry-level conditions for K/A # 005 G2.4.4 emergency and abnormal operating procedures. Rating 4.5 Question 03 Following a design basis LOCA, loss of which of the following would meet the entry conditions for EOP ECA-1.1, Loss of Emergency Coolant Recirculation?
Loss of:
A. both RHR pumps B. both Charging pumps and a RHR pump C. both SI pumps and both Charging pumps D. one train of ECCS pumps (RHR, SI and ECCS CCP)
Key Proposed Answer: A. both RHR pumps Explanation:
swer Note: RO and SRO objective to know major actions and entry conditions for EOPs. Question is a simple entry condition question - appropriate for RO (on SRO flowchart, "Can the question be answered solely by knowing the purpose, overall sequence of events, or overall mitigative strategy of a procedure?" would be answered "yes" or RO knowledge.
An A. Correct. ECA-1.1 is entered when the plant cannot establish at least one train of recirculation with an RHR pump and the containment sump. Without an RHR pump, the SI or charging pumps would not have a suction source.
B. Incorrect. Loss of the SI pumps would degrade recirculation but as long as there is an RHR pump, there is a recirculation flowpath.
C. Incorrect. Charging pumps are the major contributors to degrading conditions leading to 62 inadequate core cooling if there is a small break but an absence of charging pumps does not meet the entry conditions for ECA-1.1, only the lack of an RHR pump.
D. Incorrect. RHR pump (or lack of a flowpath) is the only condition that causes entry into ECA-1.1. In E-1.3 step 12, part of the step is to check for NO flow from any of the flow L1 indicators, RHR, SI, charging and if there is no flow on all of them (due to the first part, no RHR pump), then the RNO is go to ECA-1.1. If this step is remembered incorrectly, this would seem to be the answer.
Technical
References:
ECA-1.1 section 2, Symptoms or Entry Conditions, E-1.3 step 12, LPE1C References to be provided to applicants during exam: None Learning Objective:
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X DCPP L162 Exam Rev 1
Comprehensive/Analysis 10CFR Part 55 Content: 55.41.10 Difficulty: 2.0 Key swer An 62 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 005 K1.10 -Knowledge of the physical connections and/or cause Group # 1 effect relationships between the RHRS and the following systems: K/A # 005 K1.10 Containment Spray System (CSS) Rating 3.2 Question 04 Which of the following valves, when CLOSED, provides a direct input for completing the interlock to OPEN the RHR to Containment Spray Isolation valve, 9003A.
A. 9001A, Containment Spray Pump 11 Discharge B. 8701, RHR Suction C. 8809A, RHR to Cold Legs 1 and 2 D. 8804A, RHR Hx 12 Discharge to CHG and SI pumps Proposed Answer: B. 8701, RHR Suction Explanation:
A. Incorrect. The pumps are stopped and the pump discharge valves are closed when aligning CS from RHR. However, it is not interlocked with the operation of 9003 A/B. Plausible to believe the normal suction valve(s) must be closed to open the flowpath from RHR.
B. Correct. In order to open 9003 A or B, the associated containment sump suction valve, 8982 A or B must be open and EITHER 8701 or 8702 must be closed. Closing 8701 provides an input to the interlock to open the valve.
C. Incorrect. 8809A does not impact the operation of the valve, but is operated (closed) just prior to opening 9003A in E-1.3.
D. Incorrect. 8804A (and 8804B) are opened to provide suction to charging and SI pumps.
Because RHR is being aligned to Cont Spray, plausible that 8804A must be closed to ensure an adequate suction path to the containment spray pumps.
Technical
References:
LB-2, page 28, PEP V-7B References to be provided to applicants during exam: None Learning Objective: Analyze automatic features and interlocks associated with the RHR System. (35317)
Question Source: Bank #
(note changes; attach parent) Modified Bank New X Previous NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.7 Difficulty: 2.3 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 006 A4.11 Ability to manually operate and/or monitor in Group # 1 the control room: Overpressure protection system. K/A # 006 A4.11 (CFR: 41.7 / 45.5 to 45.8). Rating 4.2 Question 05 GIVEN:
- RCS Cold Leg temperatures are 270°F
- RCS pressure is 365 psig
A. 1) two 2) five Ke Assuming the pressure rise continues at 5 psig/minute, __1)__ PORVs will initially open in approximately __2)__ minutes.
y B. 1) three 2) five C. 1) two D. 1) three
- 2) fourteen
- 2) fourteen sw Proposed Answer: C. 1) two 2) fourteen er Explanation:
A. Incorrect. Only two PORVs open, however, in five minutes, pressure will be at 390 psig, LTOP actuates at 435 psig. 390 psig is plausible because above 390 psig, RCS to RHR An valves 8701 and 8702 are prevented from opening.
B. Incorrect. Only two PORVs open. PCV-474 is not safety related and not part of the LTOP circuit. In five minutes, pressure will be at 390 psig, LTOP actuates at 435 psig. 390 psig is plausible because above 390 psig, valves 8701 and 8702, RCS to RHR valves are prevented from opening.
62 C. Correct. PORVs PCV-455C and 456 are operated by LTOP. In fourteen minutes, pressure will be 435 psig which is the lift setpoint.
D. Incorrect. Time to open is correct, however, only two of the PORVs open.
Technical
References:
OIM A-1-2 and A-4-7, PTLR References to be provided to applicants during exam: none L1 Learning Objective: 36923 - Analyze automatic features and interlocks associated with the Pzr, Pzr Pressure and Level Control System Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.7 Difficulty: 2.7 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 007 A3.01 Ability to monitor automatic operation of the PRTS, Group # 1 including: Components which discharge to the PRT K/A # 007 A3.01 Rating 2.7 Question 06 Unit 1 is at 100% power. PRT level and pressure are at normal operating level and pressure.
A pressure transient causes letdown pressure to begin to rise.
- 1) Letdown Relief valve, RV-8117 will lift at a setpoint of __________ psig.
- 2) Assume when RV-8117 lifts, PRT pressure begins to rise at 5 psig/minute. The PRT rupture disks would rupture in approximately _________ minutes.
A. 1) 450 B. 1) 600
- 2) 3
- 2) 3 Key C. 1) 450 2) 19 D. 1) 600 2) 19 Proposed Answer: D. 1) 600 2) 19 Explanation:
swer The auto actions to meet the KA are the lifting of the relief valve at 600 psig, which discharges to the PRT and the pressure at which the rupture disc fails of 100 psig. Normal level in the PRT is approximately 85%. Normal pressure is approximately 3 psig.
An A. Incorrect. Closing of 8152 will cause relief valve 8117 at 600 psig. 450 psig is the setpoint for the RHR to PRT relief valve. In 3 minutes pressure is only about 20 psig. Plausible if the 85% level is confused as 85 psig.
B. Incorrect. Closing of 8152 will cause relief valve 8117 at 600 psig. In 3 minutes pressure is only about 20 psig. Plausible if the 85% level is confused as 85 psig..
C. Incorrect. Closing of 8152 will cause relief valve 8117 at 600 psig. 450 psig is the setpoint 62 for the RHR to PRT relief valve.
D. Correct. Closing of 8152 will cause relief valve 8117 at 600 psig. The rupture disc setpoint is 100 psig. Normal pressure is approximately 3 psig, so it would take about 19 minutes for pressure to rise to the setpoint L1 Technical
References:
LA-4B, LB-2, LB-1A, OP B-1A:XII References to be provided to applicants during exam: None Learning Objective: 40573 Describe PRT system components Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Question History: Last Two NRC Exams Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.7 Difficulty: 2.3 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 008 K3.01 - Knowledge of the effect that a loss or malfunction of Group # 1 the CCWS will have on the following: Loads cooled by CCWS K/A # 008 K3.01 Rating 3.4 Question 07 Unit 1 is at 100% power, at the middle of core life.
Instrument air is lost to TCV-130, Letdown Heat Exchanger CCW outlet valve.
Which of the following describes the effect on letdown system temperature and the potential reactivity effect?
Letdown temperature ___1)____ and reactor power ____2)____.
A. 1) rises B. 1) rises
- 2) rises
- 2) lowers Key C. 1) lowers 2) lowers D. 1) lowers 2) rises swer Proposed Answer: D. 1) lowers 2) rises Explanation:
A. Incorrect CCW valve TCV-130 fails open on of instrument air. Failing open causes CCW flow through the heat exchanger to increase and letdown temperature to decrease (not rise)
Plausible - power will rise.
An B. Incorrect. Plausible because this would be correct if TCV-130 failed closed.
C. Incorrect. Letdown temperature will lower but the effect is to remove boron. Boron is released and power rises. Plausible if the effect of lowering letdown temperature is reversed (boron is released - lowering power)
D. Correct. TCV-130 fails open. This will lower letdown temperature. At full power, MTC is 62 negative, lowering letdown temperature removes boron from letdown, which is a positive reactivity effect and power will rise.
Technical
References:
LF-2, LPA-9 L1 References to be provided to applicants during exam: None Learning Objective: State which way air operated valves fail on loss of air. (9842)
Question Source:
(note changes; attach parent)
Bank #8 DCPP NRC 04/2016 Modified Bank #
New X
Previous NRC Exam Yes Question History: Last Two NRC Exams Yes Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.7 Difficulty: 2.3 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 008 K2.02 Knowledge of bus power supplies to the following: Group # 1 CCW pump, including emergency backup. K/A # 008 K2.02 Rating 3.0 Question 08 Unit 2 Emergency Diesel Generators (EDG) are supplying their respective 4 kV Vital AC buses.
Which EDGs are supplying power to CCW pump 22 and CCW pump 23?
CCW pump 22 CCW pump 23 A. EDG 23 EDG 22 B.
C.
EDG 21 EDG 22 EDG 23 EDG 23 Key D. EDG 21 EDG 22 Proposed Answer: D. EDG 21 EDG 22 Explanation:
sw Unit 2 Vital buses F, G, H are powered by EDG 23, 21, 22. Power supply to CCW pumps are F er (pump 21), G (pump 22) and H (pump 23). Therefore, CCW pumps 22 and 23 are being powered by EDG 21 and 22 respectively A. Incorrect. Plausible, not a direct correlation of power supplies to loads. For instance CS pump 21 is powered from Bus G.
B. Incorrect. Plausible, this is a power supply alignment for loads such as SI pumps.
An C. Incorrect. Plausible, this is a power supply alignment for loads such as AFW pumps.
D. Correct. EDG 21 supplies bus G (pump 22) and EDG 22 supplies bus H (pump 23).
Technical
References:
OIM J-1-1 References to be provided to applicants during exam: None 62 Learning Objective: State the power supplies to CCW system components (8129)
Question Source:
(note changes; attach parent)
Question History:
Bank # DCPP A-1102 Modified Bank #
New Last Two NRC Exams X
L1 Question Cognitive Level:
10CFR Part 55 Content:
Difficulty: 2.0 Memory/Fundamental Comprehensive/Analysis 55.41.8 X
DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 010 K6.01 Knowledge of the effect of a loss or malfunction of the Group # 1 following will have on the PZR PCS: Pressure detection systems K/A # 010 K6.01 Rating 2.7 Question 09 Unit 1 is at 100% power.
Pressurizer pressure channel, PT-474, fails LOW.
If Pressurizer pressure rises to the open setpoint, ONLY Pressurizer PORV(s)
_________________ will open.
A. PCV-474 B. PCV-455C C. PCV-455C and PCV-456 Key D. PCV-456 Proposed Answer: D. PCV-456 Explanation: swer A. Incorrect. PCV-474 is prevented from opening due to the low pressure interlock from PT-474. Plausible if its not known that PT-474 is the low pressure interlock channel for the control portion of the PORV circuitry which controls the PORV opening from the "second highest pressure" control circuitry. Also, logical to assume the interlock channel would be a different channel (as is the situation for PCV-455C)
An B. Incorrect. PCV-455C is prevented due to the failure of PT-474. Plausible because there is only one PORV that will open, but its PCV-456.
C. Incorrect. Both PCV-455C and PCV-474 will not open. PCV-474 is independently controlled by its associated channel, PT-474. PCV-455C is prevented from opening due to low pressure interlock met due to the failed PT-474 less than 2185 psig. Plausible that PT-62 455C, with PCV-456 are unaffected by PT-474.
D. Correct. 2 PORVs are prevented from opening but its PCV-455C and PCV-474. PCV-456 will still operate.
Technical
References:
OIM A-4-7 L1 References to be provided to applicants during exam: None Learning Objective: Discuss abnormal conditions associated with the Pzr, Pzr Pressure and Level Control System (36926)
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.7 Difficulty: 3.7 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 012 K5.02 -Knowledge of the operational implications of the Group # 1 following concepts as the apply to the RPS: Power Density K/A # 012 K5.02 Rating 3.3 Question 10 Which of the following reactor trips is designed to prevent operation of the reactor with a power density of greater than 21.1 kW/foot?
A. Power Range Rate (Positive) and Power Range High Flux (High)
B. Overpower Delta T (OPT) and Over Temperature Delta T (OTT)
C. Overpower Delta T (OPT) and Power Range High Flux (High)
Key D. Power Range Rate (Positive) and Over Temperature Delta T (OTT)
Proposed Answer: C. Overpower Delta T (OPT) and Power Range High Flux (High)
Explanation:
A. Incorrect. Power Range High Flux is correct, however, PR rate (positive) is for ejected rod (flux peaking) sw B. Incorrect. OPT is correct, OT is for DNB.
er C. Correct. OPT and Power Range High Flux are for excessive kw/foot (power density).
D. Incorrect. Power Range High Flux is correct, however, OTT is DNB protection.
Technical
References:
OIM B-6-4-a References to be provided to applicants during exam: None Learning Objective: Analyze automatic features and interlocks associated with the Reactor Question Source:
An Protection System. (37048)
(note changes; attach parent)
Bank #36 DCPP NRC 07/2011 (L091)
Modified Bank #
New Past NRC Exam X
Yes Question History: Last Two NRC Exams No 62 Question Cognitive Level:
10CFR Part 55 Content:
Memory/Fundamental Comprehensive/Analysis 55.41.2 X
L1 Difficulty: 3.0 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 012 A1.01 - Ability to predict and/or monitor Changes in Group # 1 parameters (to prevent exceeding design limits) associated with K/A # 012 A1.01 operating the RPS controls including: Trip setpoint adjustment Rating 2.9 Question 11 Which of the following will cause the calculated setpoint for both Overpower Delta T (OPT) and Over Temperature Delta T (OTT) to LOWER?
- 1. RCS average temperature rising
- 2. Major deviation in AFD
- 3. RCS pressure lowering A. 1 ONLY B. 1 and 2 Key C. 3 ONLY D. 2 and 3 Proposed Answer: A. 1 ONLY Explanation:
swer OPT Set point adjusted lower by rising Tavg only. Lowering pressure or changes in AFD will not affect the setpoint.
OTT Set point adjusted lower by rising Tavg, lowering RCS pressure and a major deviation of AFD.
An A. Correct. OP T is affected by Tavg only. The AFD input is set to zero. OT T would lower for lower RCS pressure but pressure does not affect OPT.
B. Incorrect. This would be correct for OTT.
C. Incorrect. Plausible because pressure is used in the OTT setpoint. But for DNB - lowering pressure would cause the setpoint to lower.
62 D. Incorrect. Both have an input into OTT not OPT.
Technical
References:
LB-6A References to be provided to applicants during exam: None Learning Objective:Describe Reactor Protection System components. (7373)
L1 Question Source:
(note changes; attach parent)
Question History:
Bank #
Modified Bank #
New Last Two NRC Exams X
No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.2 Difficulty: 3.0 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO 013 G2.4.9 - ESFAS: Knowledge of low power / shutdown Tier # 2 implications in accident (e.g., loss of coolant accident or loss of Group # 1 residual heat removal) mitigation strategies. K/A # 013 G2.4.9 Rating 3.8 Question 12 GIVEN:
- Unit 1 is performing a heatup in accordance with OP L-1, Plant Heatup From Hot Shutdown to Hot Standby
- Electrical power is aligned to startup
- RCS temperature is 525°F
- RCS pressure is 1900 psig Ke
- PK08 indicates as shown below: (ONLY red outlined annunciators are lit) y swer An 62 A steam break, outside containment, upstream of the MSIV occurs on the 11 Steam Generator.
- 1) SI will _____________ actuate.
- 2) remain running without interruption B. 1) NOT automatically
- 2) remain running without interruption C. 1) automatically
- 2) stop and restart when sequenced on to their respective Emergency Diesel Generator D. 1) NOT automatically
- 2) stop and restart when sequenced on to their respective Emergency Diesel Generator DCPP L162 Exam Rev 0
Proposed Answer: B. 1) NOT automatically
- 2) remain running without interruption Explanation:
Tests what the operator would see in the Control Room (operational validity) when RCS pressure is less than 1915 psig and an accident occurs (steam break). Additionally, the response of the AFW pumps when the SI occurs (do they or dont they stop and sequence on when SI occurs).
A. Incorrect.SI on low RCS pressure is blocked below P-11 (1915 psig) (PK08-06 LIT).
Plausible if P-11 is thought to only affect RCS pressure SI. Also, SI would automatically actuate if the break was inside containment and pressure rises to greater than 3 psig.
B. Correct. SI will not actuate automatically, however, the AFW are not stripped and then restarted. They would be if there was also a transfer to diesel, but if startup is available, no load stripping occurs.
C. Incorrect. This would be the response at power and the AFW pumps were not running and startup was not available.
Ke D. Incorrect, P-11 blocks Low Pressurizer pressure AND low steamline pressure SI (PK08-16 and 17 LIT). The AFW are not stripped. Plausible because for most SI actuations which y
cause a reactor trip and bus transfer from 500 kV to either startup or diesel, the AFW pumps would be sequenced. In this case, already on startup, no bus stripping occurs and the pumps will remain running.
Technical
References:
OIM B-6-2, B-6-5 and J-6-1 References to be provided to applicants during exam: None Eagle-21/SSPS Question Source:
sw Learning Objective: 41313 - Analyze automatic features and interlocks associated with the (note changes; attach parent) er Bank #
Modified Bank #11 DCPP NRC L091C 03/12 X New Past NRC Exam Yes Question History: Last Two NRC Exams No 10CFR Part 55 Content:
Difficulty: 3.3 An Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis 55.41.7 X
62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 013 A2.05 Ability to (a) predict the impacts of the following Group # 1 malfunctions or operations on the ESFAS; and (b) based on K/A # 013 A2.05 those predictions, use procedures to correct, control, or mitigate Rating 3.7 the consequences of those malfunctions or operations; Loss of dc control power Question 13 A loss of DC Bus 22 causes the reactor to trip from 100% power.
In accordance with OP AP-23, Loss of Vital DC Bus;
- 1) 21 Turbine Driven AFW pump Steam Isolation valve, FCV-95, will have Ke
A. 1) failed open
- 2) can be operated from the Control Room B. 1) failed open C. 1) to be opened locally sw
- 2) will have to be operated locally er
- 2) can be operated from the Control Room D. 1) to be opened locally An
- 2) will have to be operated locally Proposed Answer: D. 1) to be opened locally Explanation:.
- 2) will have to be operated locally.
Per OP AP-23, 62 If the Turbine Driven AFW pump 2 1 is needed:
FCV 95, Steam Isolation valve, will have to be manually opened.
Turbine Driven AFW pump motor operated valves LCV 106, 107, 108, and 109 will be deenergized if 480V bus G is lost and personnel will have to be dispatched locally to control L1 AFW flow. .
A. Incorrect. DC bus 22 powers FCV-95 and it will not open. Additionally, bus G will be de-energized and the LCVs, which are powered from 480 VAC bus G will not have power.
Plausible because valves have different fail position, and it could be thought FCV-95 fails open (to ensure start of the AFW pump) or because the LCVs are MOVs the loss of DC is not obvious that it prevents valve operation..
B. Incorrect. FCV-95 fails "as is" on a loss of DC. Plausible because many DC components fail open/closed on a loss of power.
C. Incorrect. FCV-95 fails "as is" on a loss of DC. Plausible because many DC components fail open/closed on a loss of power.
D. Correct. FCV-95 has lost DC power and fails as-is, it must be opened locally. The LCVs are also not powered (are in the full open position) due to the loss of the 480 VAC bus and must be operated locally.
DCPP L162 Exam Rev 0
Technical
References:
OP AP-23 appendix B References to be provided to applicants during exam: None Learning Objective: Explain the consequences of loss of DC vital bus. (7116)
Question Source: Bank #DCPP Bank S-27165 X (note changes; attach parent) Modified Bank #
New Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41)7 Difficulty: 2.0 Key swer An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 022 A3.01 Ability to monitor automatic operation of the CCS, Group # 1 including: Initiation of safeguards mode of operation K/A # 022 A3.01 Rating 4.1 Question 14 Safety Injection occurs on Unit 1. 4 kV Bus G is de-energized when the reactor trips.
The operator is performing Appendix E, ESF Auto Actions, Secondary and Auxiliaries Status, of E-0, Reactor Trip or Safety Injection, and notes that the Monitor Light Box C white lights for CFCUs 12 and 15 are lit.
The white light is___1)____ for CFCU 12 and ____2)____ for CFCU 15.
A. 1) expected B. 1) unexpected
- 2) expected
- 2) expected Key C. 1) expected 2) unexpected D. 1) unexpected 2) unexpected sw Proposed Answer: B. 1) unexpected 2) expected Explanation:
er Safety Injection starts all CFCUs in LOW speed. When the CFCUs start, the white status light goes out to indicate it is running it the "safeguards" mode. If light is lit, the CFCU is not running or is still in high speed.
A. Incorrect. CFCU 12 has power and should have shifted to LOW (light should be out).
bus G. An Plausible if the power supplies are not known, but it is known that there are 2 CFCUs on B. Correct. CFCU 12 should be running and is not as indicated by the white light (unexpected). CFCU 15 is powered from bus G and is de-energized (expected light lit).
C. Incorrect. CFCU 15 does not have power and will not be running (expected). CFCU 12 62 should be running in LOW. (unexpected). This is plausible if power supplies are mixed.
D. Incorrect. CFCU 15 does not have power (expected) but CFCU 12 does and the light should be out. Plausible if the power supplies are not known but it is known that there are 2 CFCUs on Bus G and is a lineup of CFCUs such as 13 and 14..
L1 Technical
References:
E-0 appendix A and E References to be provided to applicants during exam: None Learning Objective: Discuss abnormal conditions associated with the CFCUs. (40812)
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/ X 10CFR Part 55 Content: Analysis 55.41.7 Difficulty: 2.0 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 026 A4.01 Ability to manually operate and/or monitor in the Group # 1 control room: CSS controls K/A # 026 A4.01 Rating 4.5 Question 15 GIVEN:
- A large break LOCA has occurred
- Containment Spray has actuated The Containment Spray pumps will ______1)_________when RWST level reaches __2)__
A. 1) automatically trip 2) 4%
y B. 1) automatically trip C. 1) be stopped by the operator D. 1) be stopped by the operator
- 2) 33%
- 2) 4%
- 2) 33%
Ke Proposed Answer: C. 1)
Explanation:
er be stopped by the operator 2) 4%
A. Incorrect. The RHR pumps automatically trip (at 33%) RWST level. The CS pumps are left trip on level. sw to run until 4% level, however, they must be stopped by the operator. There is not an auto B. Incorrect. The RHR pumps automatically trip (at 33%) RWST level. The CS pumps are left to run until 4% level, however, they must be stopped by the operator. There is not an auto trip on level..
An C. Correct. At 4%, the operator is instructed to stop the CS pumps.
D. Incorrect. The operator stops the pumps, but only after RWST reaches 4%. 33% is the level of switching to cold leg recirc (and RHR pumps trip). Plausible to think the CS pumps are stopped until the RHR pumps are restarted and realigned to provide spray.
Technical
References:
LB-6A AR PK03-05, E-1.3, LI-2 62 References to be provided to applicants during exam: None Learning Objective: 37578 - Describe controls, indications, and alarms associated with the CSS Question Source:
(note changes; attach parent)
Bank Modified Bank #
L1 Question History:
Question Cognitive Level:
New Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis X
No X
10CFR Part 55 Content: 55.41.7 Difficulty: 3.7 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 039 K3.05 Knowledge of the effect that a loss or malfunction of Group # 1 the MRSS will have on the following: RCS K/A # 039 K3.05 Rating 4.1 Question 16 The plant is operating at 35% power. Control Rods are in MANUAL.
Main Steam Isolation Valve (MSIV), FCV-41, closes.
Assuming the plant does NOT trip:
- 1) T in RCS loop 11 will _______________.
- 2) T in RCS loops 12, 13 and 14 will ______________.
y A. 1) rise
- 2) lower Ke B. 1) lower
- 2) rise C. 1) rise
- 2) remain the same er D. 1) lower
- 2) remain the same sw Explanation:
An Proposed Answer: B. 1) lower
- 2) rise A. Incorrect. Loop 11 steam flow will go toward 0. As a result, there will be very little heat removal from the loop and loop T will lower. The increased steam demand from the other 3 loops will cause Tcold in the other 3 loops to lower and T will rise. This answer is the 62 opposite of what occurs.
B. Correct. Loop 11 steam flow will go toward 0. As a result, there will be very little heat removal from the loop and loop T will lower. The increased steam demand from the other 3 loops will cause Tcold in the other 3 loops to lower and T will rise.
L1C. Incorrect. RCS loop 11 T will lower as heat removal from that generator lowers. Reactor power, will not change appreciably, however, loop T for the remaining loops will rised .
D. Incorrect.It is correct that loop T will lower, however, while reactor power will remain approximately the same, the other loops T will rise as the same steam demand is still being delivered to the turbine.
Technical
References:
TH18T pages 30 - 32 References to be provided to applicants during exam: None Learning Objective:DESCRIBE the primary and secondary plant responses to specific transients. (10579)
Question Source: Bank #
(note changes; attach parent) Modified Bank #DCPP bank F-22216 X New DCPP L162 Exam Rev 0
Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.5 Difficulty: 2.3 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 059 K4.02 - Knowledge of MFW design feature(s) and/or Group # 1 interlock(s) which provide for the following: Automatic K/A # 059 K4.02 turbine/reactor trip runback. Rating 3.3 Question 17 Unit 2 is at 100% power.
Main Feedwater pump 21 trips.
Turbine load will begin to lower at a rate of _____1)______ and continue at this rate until turbine load reaches _____2)______.
A. 1) 225 MW/min 2) 550 MW y B. 1)
C. 1) 225 MW/min 532 MW/min 2) 2)
650 MW 550 MW Ke D. 1) 532 MW/min 2) 650 MW Proposed Answer: B. 1) 225 MW/min 2) 650 MW Explanation:
er rate of 25 MW/min. sw A. Incorrect. Ramp at 225 MW/min is to 650 MW. Plausible - this is the target for the trip of a circ water pump, additionally, the MFW pump ramp continues from 650 to 550 MW at a B. Correct. A program ramp occurs at a rate of 225 MW/min down to 650 MW (and then lower to 550 MW at 25 MW/min.
An C. Incorrect. 532 MW/min is the rate for the trip of a stator water cooling pump and changes to 25 MW/min at 650 until 550 MW is reached.
D. Incorrect. 532 MW/min is the rate for a stator cooling water low pressure runback. 650 MW is the setpoint for the initial decrease, 530 MWe is the end of the ramp, (650 to 550 MW at a rate of 25 MW/min).
62 Technical
References:
LC-3C References to be provided to applicants during exam: None Learning Objective: Analyze automatic features and interlocks associated with the DEHC System. (5561)
L1 Question Source:
(note changes; attach parent)
Question History:
Bank #
Modified Bank #
New Last Two NRC Exams X
No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.7 Difficulty: 2.0 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 061A1.04 Ability to predict and/or monitor changes in Group # 1 parameters (to prevent exceeding design limits) associated with K/A # 061 A1.04 operating the AFW controls including: AFW source tank level. Rating 3.9 Question 18 The crew is performing EOP E-0, Reactor Trip or Safety Injection.
CST level is 39% and lowering at a rate of 10% an hour.
In ______ hour(s) the CST will reach the minimum allowable level by the EOP and the crew will be required to align the AFW pump suction to an alternate source.
A. less than 1 y
B. approximately 2.5 C. approximately 3 Ke D. approximately 3.5 Proposed Answer: C. approximately 3 er Explanation:
sw All levels correspond to EOP setpoints.
A. Incorrect. In less than one hour level will be less than 33% which if the swapover setpoint for the RWST to the containment sump.
B. Incorrect. 15% is the level used in the EOPs for the steam generators will be reached in An approximately 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />). CST swap is performed when level is less than 10%
(approximately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />).
C. Correct. The level to transfer is 10%, in 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, level will be less than 10% and transfer to an alternate source is required.
D. Incorrect. In 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, level will be almost 4% which is the RWST level the containment 62 spray pumps are manually tripped.
Technical
References:
E-0, E-1, E-1.3 References to be provided to applicants during exam: None Learning Objective:
L1 Question Source:
(note changes; attach parent)
Question History:
Bank #
Modified Bank #
New Last Two NRC Exams X
No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.4 Difficulty: 2.3 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 061 K1.01 Knowledge of the physical connections and/or cause- Group # 1 effect relationships between the AFW and the following systems: K/A # 061 K1.01 S/G system Rating 4.1 Question 19 A steamline break causes the plant to trip from 100% power.
3 minutes later steam generator pressures are:
11 - 900 psig, stable 12 - 500 psig, lowering 13 - 500 psig, lowering 14 - 870 psig, stable Which of the following is a possible location for the steam break that caused the plant to trip?
A. Upstream of Steam Generator 12 MSIV, FCV-42 B. Downstream of Steam Generator 13 MSIV, FCV-43 C. Upstream of steam inlet valve to the TDAFW pump, FCV-95 D. Downstream of steam inlet valve to the TDAFW pump, FCV-95 Proposed Answer: C. Upstream of steam inlet valve to the TDAFW pump, FCV-95 Explanation:
A. Incorrect.Both 12 and 13 Steam Generator pressures are low. Check valves between the generators (off the AFW pump line) prevent both from depressurizing.
B. Incorrect, MSIVs are shut which would have isolated the break if this was the location.
C. Correct. Both steam generators feed the AFW pump. A break on the line upstream of the FCV would cause both to depressurize and cause the reactor trip.
D. Incorrect. The plant tripped due to the steam break. FCV-95 is normally closed. A break here would not have affected plant operation at power Technical
References:
OVID 106704 sheet 4 References to be provided to applicants during exam: None Learning Objective: 7240 - Identify the location of Main Steam system valves and piping Question Source: Bank #45 DCPP NRC Exam L091 07/2011 X (note changes; attach parent) Modified Bank #
New Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.7 Difficulty: 2.3 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 062 A2.03 Ability to (a) predict the impacts of the following Group # 1 malfunctions or operations on the ac distribution system; and (b) K/A # 062 A2.03 based on those predictions, use procedures to correct, control, or Rating 2.9 mitigate the consequences of those malfunctions or operations:
Consequences of improper sequencing when transferring to or from an inverter.
Question 20 Unit 1 is at 100% power. A Nuclear Operator has been dispatched to return IY-12 to its normal supply and then place IY-13 on its backup supply.
room;
- Channel II bistable status lights - ON y
Multiple seemingly unrelated alarms including the following indications are noted in the control
- Channel III bistable status and power supply lights - OFF
- 1) Annunciator window _____________ will be lit.
Ke
- 2) The crew should enter OP AP-4, Loss of Vital or Non-Vital Instrument AC, and perform er
_____________ to take steps to address the problem.
A. 1) PK19-18, VITAL UPS TROUBLE B. 1) PK19-18, VITAL UPS TROUBLE sw
- 2) Section C, "Loss of PY-12/PY-22"
- 2) Section D, "Loss of PY-13/PY-23" An C. 1) PK19-19, VITAL UPS FAILURE
- 2) Section C, "Loss of PY-12/PY-22" D. 1) PK19-19, VITAL UPS FAILURE
- 2) Section D, "Loss of PY-13/PY-23" 62 Proposed Answer: C. 1) PK19-19, VITAL UPS FAILURE 2) Section C, "Loss of PY-12/PY-Explanation:
Instrument Panel Lost 22" Bistable Status L1 PY 11 (21)
Channel I bistable status lights IV power supply (if due to the loss of PY-11A)
ON PY 12 (22)
Channel II bistable status lights ON Channel III bistable status and power supply lights OFF PY 13 (23)
Channel III bistable status lights ON PY 13A (23A)
DCPP L162 Exam Rev 0
Channel IV bistable status and power supply lights OFF PY 14 (24)
Channel IV bistable status lights ON Channel I bistable status and power supply lights OFF A. Incorrect. The Failure PK will be lit - however, PY-12 is the affected instrument bus B. Incorrect. The failure PK wll be lit and the affected PY is PY-12, not 13.
C. Correct. Indications are that a PY has lost power. PY-12 bistables trip and the power supply light for channel III go out if PY-12 is de-energized.
D. Incorrect. The Failure PK will be lit however, the PY affected is PY-12 not PY-13.
Technical
References:
OP AP-4. AR PK-19-18, AR PK19-19 References to be provided to applicants during exam: None y
Learning Objective: 3478 -Given initial conditions, assumptions, and symptoms, determine the correct abnormal operating procedure to be used to mitigate an operational event Question Source:
(note changes; attach parent)
Question History:
Bank #
New Ke Modified Bank #
Last Two NRC Exams X
No Question Cognitive Level: Memory/Fundamental 10CFR Part 55 Content:
Difficulty: 2.7 er Comprehensive/Analysis 55.41.7 X
sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 062 K4.03 Knowledge of ac distribution system design feature(s) Group # 1 and/or interlock(s) which provide for the following: Interlocks K/A # 062 K4.03 between automatic bus transfer and breakers Rating 2.8 Question 21 Unit 1 is in MODE 3 following a reactor trip. Startup power is supplying all AC buses.
A loss of Startup power occurs. The crew is now taking action to backfeed from the 500 kV system in accordance with OP J-2:V, Backfeeding the Unit From the 500kV System.
Which of the following actions must be taken by the operator before the Main Generator Output circuit breakers, CB-532 and CB-632, can be closed?
y A. Reset the 4 kV and 12 kV auto transfers.
B. Close the Motor Operated Disconnect from CC3.
C. Reset the Unit Lockout Relays, 86G1 and 86G11 on VB4.
Ke CUTIN. er D. Switch all device CUTOUT switches on VB4 with Blue lamacoids from CUTOUT to Proposed Answer: C. Reset the Unit Lockout Relays, 86G1 and 86G11 on VB4 Explanation:
sw A. Incorrect. the auto transfer relays do not input into the operation of the 500 kV breaker.
Plausible because the goal of backfeeding is to supply those buses from 500 kV, it could be that the auto transfers would be a block in closing in that supply to the buses.
An B. Incorrect. The MOD must be OPEN, not closed.
C. Correct. Tripping the 86G1 and G11 relays trips 532 and 632. they must be reset before the breakers can be closed.
D. Incorrect. The CUTOUT switches are taken to CUTOUT. The normal (pretrip) position of these switches is CUTIN..
62 Technical
References:
OP J-2:V, LJ-4A References to be provided to applicants during exam: None Learning Objective: 5280 - Analyze automatic features and interlocks associated with the Main Generator.
L1 Question Source:
(note changes; attach parent)
Bank #20 DCPP NRC Exam L091C 03/2012 Modified Bank #
New Past NRC Exam X
Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.7 Difficulty: 2.7 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 063 A2.01 Ability to (a) predict the impacts of the following Group # 1 malfunctions or operations on the DC electrical systems; and (b) K/A # 063 A2.01 based on those predictions, use procedures to correct, control, or Rating 2.5 mitigate the consequences of those malfunctions or operations:
Grounds Question 22 Unit 1 is at 100% power.
A ground causes the DC breaker supplying control power to the 11 RCP, 13 RCP and 12 CWP to open.
All indicating lights for 11 RCP, 13 RCP and 12 CWP are out. y taken by the crew in the Control Room? Ke In accordance with AR PK05-01, 11 RCP, or AR PK05-03, 13 RCP, what action(s) should be
- 1) Dispatch an operator to check a possible ground and the status of the DC control power breaker to the affected components on 12 kV bus D
- 2) Dispatch an operator to check a possible ground and the status of the DC control power er breaker to the affected components on 12 kV bus E
- 3) From the Control Room trip the reactor, 11 RCP, 13 RCP and 12 CWP A. 1 ONLY B. 2 ONLY sw C. 1 and 3 D. 2 and 3 An Proposed Answer: B. 2 ONLY Explanation:
62 NOTE: the opening of the DC control power breaker causes a loss of indication for RCPs 11, 13 and CWP 12. It also causes a loss of indication for the redundant breakers for the other two RCPs which does not affect the Control Room indication. The RCP alarms for the other two RCPs is received, however, there is no loss of indication in the Control Room. They are left out L1 of the information given as it is not pertinent to the action to be taken.
A. Incorrect. A condition, such as a ground has caused a loss of control power, which causes the lights to go out, however, the loads are on Bus E not bus D.
B. Correct. A condition, such as a ground has caused a loss of control power, which causes the lights to go out. The three loads listed are on 12 kV bus E. Per PK05-01 or 05-03, the action is to dispatch an operator to check the DC control power breaker, 72-1233, "12KV SWGR BUS E & SVD6R, SVD7R (the lights for the RCP redundant breakers)
C. Incorrect. Loads are on Bus D. There is no reason to trip the loads and due to the loss of control power and they cannot be tripped from the control room. Plausible because there is no indication and it could be thought the components need to be tripped. If the RCPs were required to be tripped, the reactor is always tripped first.
D. Incorrect. There is no reason to trip the loads and due to the loss of control power and they cannot be tripped from the control room. Plausible because there is no indication and it DCPP L162 Exam Rev 1
could be thought the components need to be tripped. If the RCPs were required to be tripped, the reactor is always tripped first.
Technical
References:
AR PK05-01, 05-03, drawings 445075, 477848 References to be provided to applicants during exam: None Learning Objective: 37793 -Describe controls, indications, and alarms associated with the DC Power System Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.10 Difficulty: 2.7 y Ke er sw An 62 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 064 K4.01 Knowledge of ED/G system design feature(s) and/or Group # 1 interlock(s) which provide for the following: Trips while loading K/A # 064 K4.01 the ED/G (frequency, voltage, speed) Rating 3.8 Question 23 A loss of all offsite power has occurred.
30 seconds after EDG 12 automatically starts and begins loading, it trips.
What condition(s), individually, could have caused EDG 12 to trip?
- 1) Differential
- 2) Overspeed y
- 3) High Jacket Water temperature A. 2 ONLY Ke B. 3 ONLY C. 1 and 2 D. 1 and 3 er Proposed Answer: C. 1 and 2 Explanation:
The shutdown relay (SDR) is energized by sw And isolates the Diesel by:
(1050 rpm)
An any of the following:
- Engine mechanical overspeed trip
- Low lube oil pressure (< 40 psig)
- Tripping the diesel engine
- Deenergizing generator excitation
- Tripping the diesel output breaker
- 20-seconds time delay on start 62
- Emergency trip PB is depressed
- Diesel generator differential relay actuates
- High jacket water temperature (205°F)
L1
- Diesel overcrank (> 10 seconds)
These SDR trips are bypassed unless the diesel is in local control.
Note: no trips of EDGs specifically associated with frequency, (KA).
A. Incorrect Overspeed will cause the diesel to trip but Differential will, as well. Plausible as there are trips that are normally cut out and it could thought one of these is normally cutout.
B. Incorrect. High Jacket Water temperature is only active when control is in LOCAL. If the EDG was started in the Control Room, Local/Remote Control Selector switch is in Remote..
C. Correct. Overspeed could cause the trip, as will differential.
D. Incorret. Differential will but the high jacket water temperature is not a possible trip at this time (only active when in LOCAL).
Technical
References:
LJ-6B References to be provided to applicants during exam: None DCPP L162 Exam Rev 0
Learning Objective: Analyze automatic features and interlocks associated with the Diesel Generator System. (37725)
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.7 Difficulty: 2.3 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 064 K6.07 Knowledge of the effect of a loss or malfunction of the Group # 1 following will have on the ED/G system: Air receivers K/A # 064 K6.07 Rating 2.7 Question 24 GIVEN:
- Unit 1 is at 100% power
- A relief valve fails open on Starting Air Receiver A for Emergency Diesel Generator 11 and the air receiver begins to rapidly depressurize
- The leakage exceeds the capacity of the starting air compressor A loss of offsite power occurs.
y Ke Which of the following describes the response of Emergency Diesel Generator 11?
A. The diesel will not start due to a loss of control air to fuel oil day tank LCVs.
B. The diesel will not start because the fuel rack booster pump will not be supplied with sufficient air for operation.
er C. The diesel will start in the normal time via the two starting air solenoids associated with the Starting Air Receiver B.
Starting Air Receiver B. sw D. The diesel will start in the normal time via all four starting air solenoids cross-tied to Proposed Answer: C. The diesel will start in the normal time via the two starting air solenoids Explanation: An associated with the Starting Air Receiver B A. Incorrect. The LCVs are provided with air from the air recievers to operate. However, the trains are not crosstied. Train A and B each supply air to a day tank LCV. One train will/could be compromised but the system would still operate from the other train.
62 Plausible because systems, such as CCW are cross tied to ensure cooling to both A and B headers.
B. Incorrect. Plausible because air is the force to move the booster pump to the max fuel position on start up. However, they are not cross tied and the other train would operate.
L1C. Correct. The systems are not cross tied and only one train (each 100% capacity) is required to start..
D. Incorrect. If the systems were cross-tied this could be true, however, they are not (there is a manual cross-tie that is maintained closed).
Technical
References:
LJ-6B References to be provided to applicants during exam: None Learning Objective: 6431 - State the purpose of D/G subsystems and components Question Source: Bank #19 DCPP NRC (L111) Exam 11/2012 X (note changes; attach parent) Modified Bank #
New Past NRC Exam Yes Question History: Last Two NRC Exams No DCPP L162 Exam Rev 0
Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.8 Difficulty: 2.0 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 073 K1.01 - Knowledge of the physical connections and/or cause Group # 1 effect relationships between the PRM system and the following K/A # 073 K1.01 systems: Those systems served by PRMs Rating 3.6 Question 25 Unit 2 is at 100% power.
A small steam generator tube leak is causing steam line radiation monitor RM-73 to read 1000 cpm.
If power is reduced to 50%, indication on RM-73 will:
A. lower due to a decrease in N-16 production. y B. lower due to a decrease in I-131 production.
C. rise because of the rise in Xenon production.
Ke D. rise because there is less steam flow but the same amount of radiation.
er Proposed Answer: A. lower due to a decrease in N-16 production.
Explanation:
sw A. Correct. The steam line radiation monitors detect N-16 from the tube leakage, as power is lowered, N-16 production lowers and the reading on RM-73 lowers. Once the unit is shutdown, N-16 production ceases and the indication will decrease B. Incorrect. Iodine production will decrease but the detector senses N-16 not iodine (or xenon)
An C. Incorrect. Xenon production initially will rise as power lowers, however, the rad monitors measure N-16 and its production is lowering as power lowers.
D. Incorrect. A lower flowrate of steam could affect air ejector reading but the steamline rad monitors are not in the flow stream but outside the piping and measure N-16 Technical
References:
LG4A - Radiation Monitoring, SOE-93-001 62 References to be provided to applicants during exam: None Learning Objective:8485 Explain the conditions that effect Radiation Monitoring system radiation monitor indications Question Source: Bank #51 DCPP NRC Exam 02/2005 X L1 (note changes; attach parent)
Question History:
Modified Bank #
New Previous NRC Exam Last Two NRC Exams Yes No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.11 Difficulty: 2.7 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 076 K2.01 Knowledge of bus power supplies to the following: Group # 1 Service water K/A # 076 K2.01 Rating 2.7 Question 26 A loss of offsite power occurs on Unit 2.
What Emergency Diesel Generators (EDG) will supply power to the Unit 2 Auxiliary Saltwater Pumps, 2-1 and 2-2?
ASW Pump 2-1 ASW Pump 2-2 A. EDG 2-1 EDG 2-2 y B. EDG 2-2 C. EDG 2-3 EDG 2-3 EDG 2-2 Ke D. EDG 2-3 EDG 2-1 Proposed Answer: D. EDG 2-3 EDG 2-1 Explanation:
er A. Incorrect. Pumps 1 and 2 are powered from Bus F and G respectively. The EDGs for those 1 and 2. sw buses are 2-3 and 2-1 (buses G and H). Its plausible that EDG 1 and 2 would supply pumps B. Incorrect. Pumps 1 and 2 are powered from Bus F and G respectively. Plausible because there are pumps on Bus G and Bus H (containment spray pumps) and ASW cross tie An valves, FCV-495 and 496 are powered by Bus H.
C. Incorrect. Plausible because there are pumps on Bus F and Bus H (AFW pumps) and cross tie valves, FCV-495 and 496 are powered by Bus H.
D. Correct. Pumps 1 and 2 are powered from Bus F and G respectively. EDGs 2-3 and 2-1 power those buses.
Technical
References:
OIM J-1-1 62 References to be provided to applicants during exam: None Learning Objective: State the power supplies to ASW System components. (5339)
Question Source:
(note changes; attach parent)
Bank Modified Bank #26 DCPP NRC Exam, (L051) X L1 Question History:
04/07 New Past NRC Exam Last Two NRC Exams Yes No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.4 Difficulty: 2.0 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 078 A3.01Ability to monitor automatic operation of the IAS, Group # 1 including: Air pressure K/A # 078 A3.01 Rating 3.1 Question 27 All instrument air compressors are available and are aligned in a normal system alignment.
Instrument air header pressure lowers from 106 to 99 psig.
What will be the status of the instrument air compressors?
A. All compressors are running and loaded.
B. Only Rotary compressors 0-5, 0-6 and 0-7 are running and loaded.
y Ke C. Only Reciprocating compressors 0-1 through 0-4 are running and loaded.
D. All compressors running but only Rotary compressors 0-5 and 0-6 are loaded.
Explanation: er Proposed Answer: B. Only Rotary compressors 0-5, 0-6 and 0-7 are running and loaded.
A. Incorrect. For a normal system configuration, the reciprocating air compressors will start sw when pressure is 93 psig and the rotary air compressors start at 103 psig.
B. Correct. The rotary air compressors (0-5, 6 and 7) start at 103 psig and the reciprocating compressors will start at 93 psig.
C. Incorrect. The rotary air compressors start first, followed by the reciprocating.
D. Incorrect. At this pressure, all compressors will be loaded. If pressure was higher, its An possible only a compressor could be running unloaded.
Technical
References:
OIM K-1-2 References to be provided to applicants during exam: None Learning Objective: 37565 Analyze automatic features and interlocks associated with the Compressed Air System.
62 Question Source:
(note changes; attach parent)
Bank #27 DCPP NRC Exam 03/2012 Modified Bank #
New Past NRC Exam X
Yes L1 Question History:
Question Cognitive Level:
10CFR Part 55 Content:
Difficulty: 2.7 Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis 55.41.7 No X
DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 103 A4.04 Ability to manually operate and/or monitor in the Group # 1 control room: Phase A and phase B resets. K/A # 103A4.04 Rating 3.5 Question 28 GIVEN:
- Phase A Red lights on Monitor Light Box B - LIT
- Phase B Red lights on Monitor Light Box D - LIT
- PK02-01, CONTMT ISOLATION PHASE A/B - LIT
- PK02-02, SAFETY INJECTION INITIATE - LIT
- PK08-21, SAFETY INJECTION ACTUATION - LIT
- Containment pressure is 10 psig y Ke The operator presses the RESET pushbuttons for Phase A and Phase B.
After the Phase A Reset pushbuttons are pressed, the Phase A Red lights will be:
After the Phase B Reset pushbuttons are pressed, the Phase B Red lights will be:
Phase A A. Lit Phase B Lit er B. Not Lit C. Lit D. Not Lit Lit Not Lit Not Lit sw An Proposed Answer: D. Not Lit Not Lit Explanation:
Indications in the initial conditions are that:
62
- SI has actuated and not reset (PK02-02 and 08-21).
- Either phase A or B signal cause PK02-01 to light.
A. Incorrect. The resets for both signals are "retentive" memory and will reset with the actuating signal present or SI is not reset or containment pressure is above the actuation L1 setpoint (currently 10 psig, setpoint is 3 psig). Plausible as some signals, such as FWI cannot be reset if containment pressure is high or there are failures, such as P-4 that would result in only partial SI reset and the lights/alarms could still be in.
B. Incorrect. Phase A will reset and the red light will go out. Phase B will also reset. It does not need SI reset or containment pressure to be less than the actuating setpoint.
C. Incorrect. Phase A does not need SI reset (although SI generates Phase A) or containment pressure less than 3 psig. Phase B will reset and the light will go out, there is not a need to reset SI.
D. Correct. Both will reset even with SI not reset.
Technical
References:
OIM B-6-5, B-6-6, B-6-7, B-6-8 References to be provided to applicants during exam: None Learning Objective: 37048 Analyze automatic features and interlocks associated with the RPS DCPP L162 Exam Rev 1
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.7 Difficulty: 3.0 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 002 K1.07 Knowledge of the physical connections and/or cause- Group # 2 effect relationships between the RCS and the following systems: K/A # 002 K1.07 Reactor vessel level indication system Rating 3.5 Question 29 A natural circulation cooldown is being performed on Unit 1 in accordance with EOP E-0.3, Natural Circulation Cooldown with Steam Void in the Reactor Vessel (with RVLIS).
Per the background document for E-0.3, why must RVLIS Full Range indication be maintained greater than 69.2% during the cooldown?
A. To maintain conditions for an RCP start should power become available.y Ke B. To ensure the core remains covered in the event T-hot reaches saturated conditions.
C. To prevent steam from entering the hot leg and disrupting the natural circulation flow.
D. To ensure that when the void in the upper head is collapsed, pressurizer level will remain on scale.
er Proposed Answer: C. To prevent steam from entering the hot leg and disrupting the natural circulation flow Explanation:
sw Question tests the knowledge of the RCS hot leg level that correlates to a RVLIS indication and the "cause/effect" if RVLIS is less than that level.
A. Incorrect. A continuous action in the natural circulation cooldown procedures is to start an RCP.
An B. Incorrect. This is a non-accident procedure, core cooling is not a concern.
C. Correct. Purpose of the step, as stated in the background is "To allow the void to reach the hot legs without disrupting natural circulation".
D. Incorrect. If RVLIS is less than 100%, Pressurizer level is controlled to accommodate void collapse if an RCP is started.
62 Technical
References:
E-0.3, E-0.3 background References to be provided to applicants during exam: None Learning Objective: 5855 - Explain the effect of voids on RCS operation L1 Question Source:
(note changes; attach parent)
Question History:
Bank #26 DCPP NRC Exam 07/2011 Modified Bank #
New Past NRC Exam Last Two NRC Exams X
Yes No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.10 Difficulty: 3.3 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 014 K4.05 -Knowledge of RPIS design feature(s) and/or Group # 2 interlock(s) which provide for the following: Rod hold interlocks K/A # 014 K4.05 Rating 3.1 Question 30 GIVEN:
- Unit 1 has been at 100% power for 300 days
- Control Bank D rods are at 222 steps on DRPI The crew is placing Charging pump 11 in service. Charging pump 11 was last run 60 days ago.
y Which of the following is the expected plant response when the operator starts Charging pump 11?
Ke A. Dilution; rods will not respond no matter how much Tave rises.
B. Boration; rods will not respond no matter how much Tave lowers.
C. Dilution; rods will step if Tave rises by more than 1.5°F.
er D. Boration; rods will step if Tave lowers by more than 1.5°F.
Proposed Answer: B. Boration; rods will not respond no matter how much Tave lowers Explanation:
sw C Rod stop interlock is 220 steps.
A. Incorrect. Rods will not move due to C-11. The expected change is boration (RCS concentration will have gone done since the pump was last run.
An B. Correct. Reactivity changes may result from placing idle portions of the CVCS in service due to differences in boron concentration in the piping. Boron concentration in the piping will be higher than current RCS concentration, as boron concentration lowers for most of core life. This will cause RCS temperature to lower. If Tave changes by more than 1.5F, rods would step out, however, at full power, rods will be above C-11 and prevent any further rod motion in auto.
62 C. Incorrect. Boration will occur. A dilution would cause rod motion if temperature changes by at least 1.5°F D. Incorrect. Boration will occur, however, rods will not move due to C-11. This would be the correct answer if rods were less than 220 steps.
L1 Technical
References:
OP B-1A:V, OIM B-6-3 References to be provided to applicants during exam: None Learning Objective:
Question Source: Bank #2 DCPP NRC 8/2014 X (note changes; attach parent) Modified Bank #
New Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.2 Difficulty: 2.7 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 015 A1.05 Ability to predict and/or monitor changes in Group # 2 parameters to prevent exceeding design limits) associated with K/A # 015 A1.05 operating the NIS controls including: Imbalance (axial shape) Rating 3.1 Question 31 Unit 1 has been at 100% power for 200 days following a refueling.
The crew is preparing to ramp from 100% to 50% using OP L-4, Normal Operation at Power.
AFD is on target at -2.0.
- 1) At 50%, AFD, if maintained on target should be _________ negative.
- 2) Per OP L-4, the rate of ramp reduction will be limited to 5 MW/min to:
A. 1) less y
- 2) minimize the effects of xenon oscillations on axial offset C. 1) less 2) prevent exceeding fuel conditioning limits Ke B. 1) more 2) minimize the effects of xenon oscillations on axial offset D. 1) more 2) prevent exceeding fuel conditioning limits er Proposed Answer: A. 1) less 2) minimize the effects of xenon oscillations on axial offset Explanation:
sw NOTE: fuel is preconditioned at a given power level, once the plant has operated at or above that power level for at least 72 cumulative hours out of the last 7 days (168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br />). At 200 days, the fuel is preconditioned.
A. Correct. Per OP L-4, P&L 6.2.2.f, When all fuel-related limitations are removed, an overall An administrative restriction will limit load ramp rates to 5 megawatts per minute. This limit is imposed to reduce the effects of xenon oscillations on axial offset. At target AFD should be -
1.0 (less negative)
B. Incorrect. Reason is correct. Effect or power reduction on AFD is reversed.
C. Incorrect. AFD is correct. There are restrictions on fuel conditioning but after 200 days at full 62 power, the fuel is conditioned and the restrictions will not apply.
D. Incorrect. Target and reason are incorrect as stated above.
Technical
References:
LB-4, OP L-4 References to be provided to applicants during exam: None L1 Learning Objective: Apply fundamental topics associated with the Excore Nuclear Instrumentation System. (7610)
Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.1 Difficulty: 2.7 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 033 A2.02 Ability to (a) predict the impacts of the following Group # 2 malfunctions or operations on the Spent Fuel Pool Cooling K/A # 033 A2.02 System ; and (b) based on those predictions, use procedures to Rating 2.7 correct, control, or mitigate the consequences of those malfunctions or operations: Loss of SFPCS Question 32 Unit 1 is at full power.
A loss of Spent Fuel Pool cooling has occurred. Spent Fuel Pool temperature is 208°F and rising.
The crew is performing OP AP-22, Spent Fuel Pool Abnormalities.
y In accordance with OP AP-22, Appendix A, "Addition of Water to the Spent Fuel Pool", what is the preferred source of makeup?
A. Refueling Water Storage Tank B. Ionics Ke C. Liquid Holdup Tank D. Condensate Storage Tank er Proposed Answer: B. Ionics Explanation:
sw A. Incorrect. This is the preferred source if the addition is to makeup for leakage and boron An must be added. For the current conditions, makeup is for evaporation.
B. Correct. Makeup is for evaporation (step 17 RNO). Per appendix A, the preferred unborated source is Ionics.
C. Incorrect. This is a method in appendix A to add borated makeup.
D. Incorrect. This is an unborated water source that is the only source that is design class 1, but not the preferred source.
62 Technical
References:
OP AP-22 References to be provided to applicants during exam: None Learning Objective: 40509 Discuss abnormal conditions associated with the SFP cooling system L1 Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New Past NRC Exam X
No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.10 Difficulty: 2.0 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 035 K5.01 Knowledge of operational implications of the following Group # 2 concepts as they apply to the S/GS: Effect of secondary K/A # 035 K5.01 parameters, pressure, and temperature on reactivity. Rating 3.4 Question 33 What reactor power and core life conditions would provide the GREATEST amount of positive reactivity for a faulted Main Steam line event?
A. Beginning of core life, hot zero power B. Beginning of core life, 100% power C. End of core life, hot zero power y D. End of core life, 100% power Proposed Answer: C. End of core life, hot zero power Explanation:
Ke KA is met because it asks to address the effect of a loss of steam generator pressure and the er effect on reactivity, by way of a temperature change.
A. Incorrect. BOL is not the worst case, but plausible if its thought that because MTC is smaller, a deeper cooldown is required which ultimately leads to more reactivity. HZP is sw correct because there is more steam generator inventory, which does cause more of a cooldown.
B. Incorrect. BOL and 100% are not correct. Plausible If the inventory effects are reversed (thought that at a higher steam load, there is more inventory) and more cooldown is needed at BOL.
inventory. An C. Correct. EOL is worst case due to the magnitude of MTC and at HZP due to a greater D. Incorrect. EOL is worst case but inventory is greater at HZP not full power..
Technical
References:
LTAA6 References to be provided to applicants during exam: None 62 Learning Objective Apply fundamental topics associated with the Steam Generators. (40557)
Question Source:
(note changes; attach parent)
Bank #41 DCPP NRC Exam 07/2011 Modified Bank #
New X
L1 Question History:
Question Cognitive Level:
Past NRC Exam Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis Yes No X
10CFR Part 55 Content: 55.41.1 Difficulty: 2.0 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 041 A4.04 Ability to manually operate and/or monitor in the Group # 2 control room: Pressure mode K/A # 041 A4.04 Rating 2.7 Question 34 GIVEN:
- Unit 1 is at 3% power, EOL
- Steam Dumps are in AUTOMATIC maintaining steam generator pressure The Steam Dump pressure controller, HC-507 setpoint is changed from 83.8% to 82.5%.
y RCS Tave will _____1)______ and indicated steam dump demand will ______2)______.
A. 1) remain the same B. 1) remain the same C. 1) lower
- 2) lower
- 2) rise
- 2) rise Ke D. 1) lower 2) lower Proposed Answer: C. 1) lower 2) rise er Explanation:
sw At 3%, steam dumps are in the PRESSURE mode. Lowering the setpoint, causes a lowering of the RCS temperature that the steam dumps will maintain (from 547°F to 544°F). This will result in an increased steam flow (demand).
An A. Incorrect. Tave lowers. Normal plant response of steam dumps is to maintain constant Tave, also plausible if the effect of the setpoint change was thought to close dumps, steam flow (demand) could be thought to lower.
B. Incorrect. Tave lowers. Its thought the function is to maintain constant Tave, then raising steam (demand) flow to maintain Tave.
C. Correct. Tave will lower, this will cause a rise in steam flow (demand) to maintain the 62 lower temperature.
D. Incorrect. It is correct that Tave lowers but the effect is to raise steam flow not lower Plausible that lower setpoint will lower steam flow (demand).
Technical
References:
LC-2B L1 References to be provided to applicants during exam: None Learning Objective: Describe system interrelationships between the Steam Dump System and other plant systems. (8042)
Question Source: Bank #
(note changes; attach parent) Modified Bank #43 DCPP NRC Exam 02/2005 X New Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.5 Difficulty: 2.0 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 045 K3.01 Knowledge of the effect that a loss or malfunction of Group # 2 the MT/G system will have on the following: Remainder of the K/A # 045 K3.01 plant. Rating 2.9 Question 35 Unit 1 is at 45% power.
The main turbine trips.
Initially, Steam Dump Groups ___1)____ will be opened by the Load Rejection Controller and initially Pressurizer level ___2)____.
A. 1) I and II ONLY 2) rises y B. 1)
C. 1)
I and II ONLY I and II and III and IV
- 2) lowers
- 2) rises Ke D. 1) I and II and III and IV 2) lowers Proposed Answer: A. 1) I and II ONLY 2) rises Explanation:
er A. Correct. The 10% load rejection (C-7A) will arm groups I and II. Because initial power is sw greater than 40%, both groups will open. Pressurizer level will rise due to RCS heatup and be off program. Charging flow will lower in an attempt to stop the level rise and return it to program.
B. Incorrect. Only groups I and II will open. Pressurizer level rises due to the heatup. Possible An to reverse the effects of the level and charging response (ie steam generator levels will lower) Plausible because it is the reverse of what happens and its thought that RCS temperature will lower due to the load rejection, causing level to lower.
C. Incorrect. C-7B (50% load rejection) will not actuate and arm groups III and IV. Level does rise.
D. Incorrect. Groups III and IV will not be armed and level rises, not lowers.
62 Technical
References:
LC-2B, LPA-25, TH18T References to be provided to applicants during exam: None Learning Objective: 10583 - DESCRIBE the reactor, RCS and Secondary System responses to each of the following transients:
L1
- a. Partial load rejection with rods in automatic.
Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.5 Difficulty:
DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 056 K1.03 Knowledge of the physical connections and/or cause- Group # 2 effect relationships between the Condensate System and the K/A # 056 K1.03 following systems: MFW Rating 2.6 Question 36 A rapid load reduction is being performed on Unit 1 in accordance OP AP-25, Rapid Load Reduction or Shutdown. All Condensate Booster Pump Sets are running.
Main Feed pump (MFP) suction pressure is 230 psig and lowering slowly.
According to OP AP-25, what can be done to attempt to raise MFP suction pressure?
NOTE:
- FCV Fdwtr Htrs Bypass y
- FCV-230 - Cnd Polishers Bypass Vlv
- TCV Gen H2 Cold Gas Temp Cont Ke A. OPEN TCV-23 and CLOSE FCV-31 B. OPEN FCV-230 and CLOSE FCV-31 er C. OPEN FCV-55 and OPEN FCV-230 D. OPEN TCV-23 and OPEN FCV-55 sw Proposed Answer: D. OPEN TCV-23 and OPEN FCV-55 Explanation:
An Interrelationship is the effect of operating valves in the condensate system to address a problem in the main feedwater system.
A. Incorrect. TCV-23 is opened. Closing FCV-31 could be thought of as a way to put more flow to the booster pumps which could then increase flow (and raise pressure) to the 62 suction of the MFPs.
B. Incorrect. FCV-230 could increase flow but would have the undesirable effect of bypassing the polishers.
C. Incorrect. FCV-55 can be used, however, FCV-230 would work but has the undesirable L1 effect of bypassing the polishers and not given as a possibility.
D. Correct. Both FCV-55 and TCV-23 put more flow to the suction of the MFPs.
References to be provided to applicants during exam: None Technical
References:
OIM C-7-1, OP AP-25 Learning Objective: Describe system interrelationships between the Condensate System and other plant systems. (8718)
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X DCPP L162 Exam Rev 0
Comprehensive/Analysis 10CFR Part 55 Content: 55.41.5 Difficulty: 2.7 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 072 G2.2.44 Area Radiation Monitoring; Ability to interpret Group # 2 control room indications to verify the status and operation of a K/A # 072 G2.2.44 system, and understand how operator actions and directives Rating 4.2 affect plant and system conditions.
Question 37 PK11-10, FHB High Radiation, alarms in the Control Room. The operator confirms Spent Fuel Pool area radiation monitors, RM-58 and 59 are in HIGH alarm.
AR PK11-10 instructs the operator to "Verify that the Fuel Handling Ventilation transferred to Iodine Removal Mode". The operator notes the following on the AFHBVS monitor on VB4:
y Ke er sw An 62 What is the status of the Fuel Handling Ventilation system?
L1 The Fuel Handling Ventilation system is:
A. properly aligned for Iodine removal.
B. not properly aligned because there is a supply fan is running.
C. not properly aligned because exhaust fan E-6 should not be running and E-4 or E-5 should be running.
D. not properly aligned because in addition to exhaust fan E-6 running, E-5 should also be running.
DCPP L162 Exam Rev 0
Proposed Answer: A. properly aligned for Iodine removal Explanation:
A. Correct. The proper alignment is one supply fan and either exhaust fan E-5 or E-6. The alignment shown is correct.
B. Incorrect. A supply fan should be running. The capacity of the exhaust fans is greater than the supply fans, so the supply fans do not need to trip to maintain a negative pressure in the FHB. Additionally, the Aux Bldg ventilation stops supply fans in the "safeguards" mode.
C. Incorrect. E-4 is the fan that is not used for Iodine removal. Either E-5 or E-6, depending on the which is selected by a switch on VB4. Plausible because it may not be known that one of the fans isn't used but whether its E-4 or E-6 is not.
D. Incorrect. If it's thought that ventilation that the additional exhaust fan must run to ensure the proper pressure is maintained in the FHB with the supply fan running.
Technical
References:
AR PK11-10, LH-7, and LH-1 References to be provided to applicants during exam: None y Learning Objective: 37547 - Describe controls, indications, and alarms associated with the FHBVS Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New Ke X Past NRC Exam No Question History:
Question Cognitive Level: er Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis No X
10CFR Part 55 Content:
Difficulty: 2.3 sw 55.41.7 An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 2 086 K4.06 Knowledge of design feature(s) and/or interlock(s) Group # 2 which provide for the following: CO2 K/A # 086 K4.06 Rating 3.0 Question 38 CO2 (CARDOX) can be initiated from the Control Room to the:
- 2. Cable Spreading Rooms
- 3. 12 kV Switchgear Rooms A. 1 ONLY B. 1 and 2 ONLY y
C. 2 and 3 ONLY D. 1 and 2 and 3 Ke Proposed Answer: B. 1 and 2 ONLY Explanation: er A. Incorrect. EDGs is correct but the answer is not complete, CARDOX can also be initiated sw to the Cable Spreading Rooms.
B. Correct. CARDOX can be actuated to the diesels, and to the cable spreading rooms.
C. Incorrect. CARDOX to 12 kV cannot be actuated from the control room, there are hose reels for the 12 kV room.
D. Incorrect. CARDOX to 12 kV cannot be actuated from the control room, there are hose An reels for the 12 kV room.
Technical
References:
LK-2B, OP K-2B:II References to be provided to applicants during exam: None Learning Objective: Describe the operation of the Cardox System. (3707)
Question Source: Bank #
62 (note changes; attach parent)
Question History:
Modified Bank #
New Past NRC Exam Last Two NRC Exams X
No No L1 Question Cognitive Level:
10CFR Part 55 Content:
Difficulty: 2.7 Memory/Fundamental Comprehensive/Analysis 55.41.7 X
DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 APE 008 G2.4.3 - Pressurizer Vapor Space Accident: Knowledge Group # 1 of the operational implications of EOP warnings, cautions, and K/A # APE 008 notes.. G2.4.3 Rating 3.8 Question 39 GIVEN:
- A Pressurizer PORV is partially open.
- The crew is performing the ECCS flow reduction actions of E-1.2, Post LOCA Cooldown and Depressurization
- One Charging and both SI pumps are running
- The RHR pumps are secured
- Conditions are met for securing one of the running SI pumps y
When the SI pump is secured, RCS pressure begins to decrease.Ke According to a Note prior to the step in E-1.2, what action should be taken?
A. Immediately restart the SI pump.
B. Restart an RHR pump in the SI mode.
er sw C. Proceed on to securing the second SI pump.
D. Wait for RCS pressure to stabilize or increase before taking action to stop the second SI pump.
Explanation:
An Answer: D. Wait for RCS pressure to stabilize or increase before taking action to stop the second SI pump.
From E-1.2 background: After an SI pump is stopped, RCS pressure may decrease to a new equilibrium value where the reduced SI flow again matches leakage from the RCS. The criteria 62 for stopping the next SI pump has been calculated assuming steady-state conditions. Hence, to ensure that these criteria are appropriate, RCS pressure and subcooling should be allowed to stabilize or increase before additional SI pumps are stopped.
A. Incorrect, note states pressure should be allowed to stabilize or increase. Plausible because L1 there are conditions that require restarting ECCS pumps, such as loss of subcooling on the foldout page.
B. Incorrect, RHR pumps are restarted if subcooling is low when checking reduction criteria or if Tave is less than 350F prior to stopping an SI pump .
C. Incorrect, a period of time should pass to ensure RCS pressure will stabilize. Plausible if its thought this is the normal response and securing the next pump will be done if pressure stabilizes.
D. Correct - E-1.2 NOTE - After stopping any ECCS Pp, RCS Pressure should be allowed to stabilize or increase before stopping another ECCS Pp.
Technical
References:
E-1.2, foldout page, and background References to be provided to applicants during exam: None Learning Objective: 6743 - Explain PZR response during ECCS reduction sequence DCPP L162 Exam Rev 0
Question Source: Bank #40 DCPP NRC10/2016 X (note changes; attach parent) Modified Bank #
New Past NRC Exam Yes Question History: Last Two NRC Exams Yes Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.5 Difficulty: 2.7 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 EPE 009 G2.4.21 - Small Break LOCA: 2.4.21 Knowledge of the Group # 1 parameters and logic used to assess the status of safety functions, K/A # EPE 009 such as reactivity control, core cooling and heat removal, reactor G2.4.21 coolant system integrity, containment conditions, radioactivity Rating 4.0 release control, etc.
Question 40
- 1) What size LOCA is assumed to have the greater probability to cause an inadequate core cooling condition?
- 2) What parameter is a direct indication that an inadequate core cooling condition exists?
A. 1) Small break 2) RVLIS level below the top of the core y B. 1) Small break C. 1) Large break Ke
- 2) Core Exit Thermocouples greater than 1200°F
- 2) RVLIS level below the top of the core D. 1) Large break 2) Core Exit Thermocouples greater than 1200°F er Proposed Answer: B. 1) Small break 2) Core Exit Thermocouples greater than 1200°F Explanation:
sw A. Incorrect. A small break is the likely failure, however, CETCs are the indication. RVLIS is used in conjunction with CETCs to indicate challenges to core cooling but RVLIS level can be below the top of the core and not have an inadequate core cooling issue.
B. Correct. The small break is the probable break to lead to a challenge to core cooling.
CETCs greater than 1200°F indicate inadequate core cooling.
An C. Incorrect. Large breaks are plausible because of the potential for the core to become partially uncovered for a short period of time, however, accumulators will refill the core and will not cause ICC. RVLIS by itself does not indicate a challenge to core cooling D. Incorrect. Large breaks cause a potential for the core to become partially uncovered for a short period of time, however, accumulators will refill the core and will not cause ICC.
CETCs above 1200°F indicate inadequate core cooling.
62 Technical
References:
LMCDFRC-Mitigating Core Damage-Core Cooling, page 26, 27. F-0 References to be provided to applicants during exam: None Learning Objective:Differentiate between:
L1 a.
b.
c.
Adequate Core Cooling Degraded Core Cooling Inadequate Core Cooling Question Source:
(note changes; attach parent)
Bank Modified Bank New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.8 Difficulty: 2.0 DCPP L162 Exam Rev 0
PRA Initiating Event Contributing to CDF - SBLOCA y
Ke er sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 APE 015/017 AK3.07 Knowledge of the reasons for the following Group # 1 responses as they apply to the Reactor Coolant Pump K/A # APE Malfunctions (Loss of RC Flow): Ensuring that S/G levels are 015/017 controlled properly for natural circulation enhancement. AK3.07 Rating 4.1 Question 41 The crew is preparing to depressurize steam generators to inject accumulators in accordance with EOP ECA-0.0, Loss of All Vital AC Power.
In accordance with the background document for ECA-0.0, during the depressurization, narrow y
range level in __1)___ intact steam generator(s) must be maintained greater than 15% to ensure that _____2)________.
A. 1) ALL B. 1) ALL Ke
- 2) steam generator pressure does not lower uncontrollably
- 2) sufficient heat transfer capability exists to remove heat from the RCS C. 1) ONE 2) steam generator pressure does not lower uncontrollably er D. 1) ONE 2) sufficient heat transfer capability exists to remove heat from the RCS Proposed Answer: D. 1) ONE 2) sufficient heat transfer capability exists to remove heat from Explanation:
the RCS sw If a loss of all AC Vital power has occurred, the RCPs are off (loss of RC Flow) and heat removal is via natural circulation. Natural circulation is enhanced by maintaining sufficient steam generator level.
An NOTE: Obj to know basis of EOP steps is RO and SRO knowledge. Also, RO expected from multiple EOPs that adequate heat sink is 15% in one steam generator.
A. Incorrect. The step requires at least one steam generator greater than 15%. The pressure lowering uncontrollably is the basis for maintaining level above 15% in E-3, Steam 62 Generator Tube Rupture.
B. Incorrect. The step requires at least one steam generator greater than 15%. Reason is correct.
C. Incorrect. Only one steam generator is required. The pressure lowering uncontrollably is L1 the basis for maintaining level above 15% in E-3, Steam Generator Tube Rupture D. Correct. One steam generator is required. Per the background document, The analysis basis for ECA-0.0 requires that the level in at least one intact steam generator (SG) be above the top of the SG U-tubes to ensure that sufficient heat transfer capability exists to remove heat from the RCS via either natural circulation or reflux boiling after the RCS saturates which is accomplished by maintaining level above 15%.
Technical
References:
ECA-0.0 step 18, ECA-0.0 background, E-3 background, LPECA-0 References to be provided to applicants during exam: None Learning Objective: 8905 - Explain the operator actions that can initiate or enhance natural circulation Question Source: Bank #
(note changes; attach parent) Modified Bank #
DCPP L162 Exam Rev 0
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.5 Difficulty: 2.7 PRA initiator to CDF - loss of offsite power y
Ke er sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 APE 022 AA1.08 Ability to operate and / or monitor the following Group # 1 as they apply to the Loss of Reactor Coolant Makeup: VCT level K/A # APE 022 AA1.08 Rating 3.4 Question 42 Unit 1 is at 100% power.
The operator stops the running charging pump when it was showing signs of cavitation. The operator reports VCT outlet valves 112B and 112C are open and RWST outlet valves 8805A and 8805B are closed.
y When checking VCT level, which of the following VCT level channel failures would be expected to have caused the observed indications?
A. LT-112 failed LOW B. LT-112 failed HIGH Ke C. LT-114 failed LOW D. LT-114 failed HIGH er Explanation: sw Proposed Answer: B. LT-112 failed HIGH Question addresses a "loss of makeup" (charging) from the perspective of the VCT makeup failure that leads to a loss of charging by causing VCT to drain and there is no swapover to An RWST. Ultimately, there could be a loss of all charging due to gas intrusion from the VCT to the suction of the charging pumps.
A. Incorrect. Plausible if failure is misconstrued. LT-112 LOW would initiate continuous makeup and the VCT fills and diverts. Charging and letdown unaffected.
B. Correct. Auto makeup is lost. VCT level will decrease. No auto swapover to the RWST, at 5%
62 will occur (requires both channels, LT112 and LT114). VCT empties, charging flow decreases to 0 gpm. Pressurizer level decreases, letdown isolates and heaters de-energize.
C. Incorrect. VCT level would be maintained by LT112. If level on LT-112 were to also lower to 5%, auto swapover to RWST. Charging flow would be maintained. Plausible if the functions L1 for LT112 are assumed for LT114.
D. Incorrect. This fully opens LCV-112A. VCT level decreases to 14%, auto makeup from LT-112, makeup is greater than letdown. Plausible if its thought auto makeup is defeated (as for LT112).
Technical
References:
OIM B-1-4. OP AP-19 appendix A References to be provided to applicants during exam: None Learning Objective: 40449 - Discuss abnormal conditions associated with the CVCS Question Source: Bank (note changes; attach parent) Modified Bank New X Past NRC Exam No Question History: Last Two NRC Exams No DCPP L162 Exam Rev 0
Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.6 Difficulty: 2.3 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 APE 025 AK1.01 Knowledge of the operational implications of Group # 1 the following concepts as they apply to Loss of Residual Heat K/A # APE 025 Removal System: Loss of RHRS during all modes of operation AK1.01 Rating 3.9 Question 43 GIVEN:
- Unit 1 is in MODE 4
- MSIVs are closed
y OP AP-16, Malfunction of the RHR System?
A. Fill and spill to the containment floor Ke Which of the following is the preferred method of RCS temperature control in accordance with B. Charging injection to the Cold Legs C. Dump steam to the Atmosphere D. Feed and bleed er sw Proposed Answer: C. Dump steam to the Atmosphere Explanation:
bleed. An A. Incorrect.Plausible because this is a MODE 5 or 6 option if unable to perform feed and B. Incorrect. Plausible because this is a MODE 5 or 6 option if steam generators are not available.
C. Correct. Step 2 of OP AP-16 states: Control RCS temperature using condenser steam 62 dumps as necessary or Control RCS temperature by dumping steam to the atmosphere using S/G 10% atmospheric steam dumps. The condenser is not available because the MSIVs are closed. The action is dump steam using the 10% steam dumps to atmosphere.
D. Incorrect. Feed and bleed is a form of heat removal done when a loss of RHR occurs in modes 5 and 6, not in AP-16.
L1 Technical
References:
OP AP-16, OP AP SD-0 appendix E and F References to be provided to applicants during exam: None Learning Objective:
Question Source: Bank #44 DCPP NRC Exam 08/2014 X (note changes; attach parent) Modified Bank #
New Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.10 Difficulty: 2.3 DCPP L162 Exam Rev 1
PRA risk significant system - RHR y
Ke er sw An 62 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 1 APE 026 AA2.04 Ability to determine and interpret the following Group # 1 as they apply to the Loss of Component Cooling Water: The K/A # APE 026 normal values and upper limits for the temperatures of the AA2.04 components cooled by CCW Rating 2.5 Question 44 GIVEN:
- Unit 1 is at 100% power
- Thermal Barrier CCW outlet valve, FCV-357, closes on high flow
- The crew enters OP AP-11, Malfunction of the Component Cooling Water System, section B, CCW System Inleakage
- RCP radial bearing temperature is 180°F and rising at 5°F/minute. y of the RCP will FIRST be required in _______ minutes.
A. the next 5 Ke For the current plant conditions, in accordance with OP AP-11, tripping the reactor and tripping B. 8 C. 9 er D. 11 Proposed Answer: C. 9.
Explanation:
sw A. Incorrect. This would be correct if there was also a loss of seal injection flow. No trip is An required unless both occur.
B. Incorrect. Temperature in 8 minutes will be 220°F, less than the setpoint of 225°F.
C. Correct. Radial bearing temperature limit is 225F and will be reached in 9 minutes at the current rate.
D. Incorrect. Temperature will be 235°F, above the setpoint. Also corresponds to seal water 62 outlet temperature setpoint.
Technical
References:
OP AP-11 section B References to be provided to applicants during exam: None Learning Objective: 7927 Given initial conditions and assumptions, determine if a reactor trip L1 or safety injection actuation is required Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New Past NRC Exam X
No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.7 Difficulty: 3.0 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 1 APE 027 AK2.03 Knowledge of the interrelations between the Group # 1 Pressurizer Pressure Control Malfunctions and the following: K/A # APE 027 Controllers and positioners AK2.03 Rating 2.6 Question 45 The unit is operating at 50% power.
PZR Press Control, HC-455K, output rises to 100%.
Pressurizer pressure will:
y A. rise until a PORV actuates and then pressure will cycle between the close interlock and PORV setpoint.
B. rise to the reactor trip setpoint. Ke C. lower until the Back-up heaters energize and then stabilize.
D. lower to the reactor trip setpoint.
er Proposed Answer: D. lower to the reactor trip setpoint.
Explanation:
sw A. Incorrect. A PORV will open (and close at 2135 psig), but the spray valves open (and heaters turn off and pressure will lower.
B. Incorrect. Full output will cause the spray valves and a PORV open, this will lower and not raise pressure to the trip setpoint.
An C. Incorrect. Pressure will lower but the master controller at 100% will prevent energizing the heaters.
D. Correct. The spray valves and a PORV will open to lower pressure. The heaters will not energize, as a result pressure continues to lower and reactor trip will occur on low pressure.
Technical
References:
OIM A-4-4A References to be provided to applicants during exam: None 62 Learning Objective: 36926 Discuss abnormal conditions associated with the Pzr, Pzr Pressure and Level Control System Question Source: Bank #A-1058 DCPP Bank X L1 (note changes; attach parent)
Question History:
Modified Bank #
New Past NRC Exam Last Two NRC Exams No No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.7 Difficulty: 3.0 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 EPE 029 EA1.12 Ability to operate and monitor the following as Group # 1 they apply to a ATWS: M/G set power supply and reactor trip K/A # EPE 029 breakers EA1.12 Rating 4.1 Question 46 The Unit 1 is at 100% power when the operator takes the Reactor Trip Switch to "TRIP".
If, as a minimum, ___1)____ RED Reactor Trip Breaker lights remain lit, the operator must de-energize ____2)____ to cause the rods to insert.
A. 1) EITHER 2) 13D OR 13E B. 1) EITHER 2) 13D AND 13E y
C. 1) BOTH D. 1) BOTH
- 2) 13D OR 13E
- 2) 13D AND 13E Ke Proposed Answer: D. 1) BOTH Explanation: er
- 2) 13D AND 13E A. Incorrect. If one reactor trip breaker opens, then 13D and E do not need to be de-energized to cause the rods to insert.
sw B. Incorrect. If one reactor trip breaker opens, then 13D and E do not need to be de-energized to cause the rods to insert. The action would be to open both 13D and 13E breaker.
C. Incorrect. Both red lights lit would require the operator to de-energize the rod drive MG sets by opening BOTH (not one) 13D and E breakers.
insert.
An D. Correct. Both red lights indicate both trip breakers are closed. BOTH supply breakers to the MG sets must be opened (they are in parallel) to de-energize the rods and cause them to Technical
References:
OIM A-3-1 References to be provided to applicants during exam: None 62 Learning Objective: 40752 Describe the basic flow path of the Rod Control System Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New X L1 Question History:
Question Cognitive Level:
Past NRC Exam Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis 55.41.6 No No X
10CFR Part 55 Content:
Difficulty: 2.3 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 EPE 038 EK1.01 Knowledge of the operational implications of Group # 1 the following concepts as they apply to the SGTR: Use of steam K/A # EPE 038 tables EK1.01 Rating 3.1 Question 47 GIVEN:
- A steam generator tube rupture has occurred on Unit 2
- A loss of offsite power has occurred
- The crew is completing a cooldown to 510°F in accordance with EOP E-3, Steam Generator Tube Rupture y
The operator has been instructed to determine a new setpoint for the steam dump valves.
Approximately, what should be the new setting?
Ke A. 73.0% on 40% Steam Dump Valve Pressure controller, HC-507 B. 73.0% on the intact steam generator 10% steam dump controllers er C. 61.0% on 40% Steam Dump Valve Pressure controller, HC-507 D. 61.0% on the intact steam generator 10% steam dump controllers Explanation:
sw Proposed Answer: D. 61.0% on the intact steam generator 10% steam dump controllers A. Incorrect. A loss of offsite power means the cooldown will be done using the 10% steam An dumps because there are no circ water pumps running so the condenser is not available.
Also the new setpoint is a conversion of steam generator pressure when the cooldown is completed, approximately 730 psig (744.5 psia), divided by 12 psig. 73.0 would be the setpoint of converting 730 to a percent (or based on a scale of 0 to 1000).
B. Incorrect. The 10% steam dumps will be used, but the setpoint will be closer to 61%
62 C. Incorrect. Setpoint is correct, but the cooldown will be done with 10% steam dumps.
D. Correct. 510°F equals a Psat of approximately 730 psig (744.5 psia). The setpoint is 730/12
= approximately 61% (60.8%)
Technical
References:
steam tables, E-3 References to be provided to applicants during exam: steam tables L1 Learning Objective: 77975 Given a set of Steam Tables, determine the:
saturation temperature, saturation pressure, Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.14 Difficulty: 3.0 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 1 APE 040 AK2.02 Knowledge of the interrelations between the Group # 1 Steam Line Rupture and the following: Sensors and detectors K/A # APE 040 AK2.02 Rating 2.6 Question 48 A steamline break occurs in Containment.
A Safety Injection signal will occur when the minimum coincidence of ____1)_____
Containment pressure channels reach the actuation setpoint.
y Adverse containment values will be used when containment pressure reaches a minimum of
____2)______.
A. 1)
B. 1) 2 of 3 2 of 3
- 2) 3 psig
- 2) 22 psig Ke C. 1)
D. 1) 2 of 4 2 of 4
- 2) 3 psig
- 2) 22 psig er Explanation: sw Proposed Answer: A. 1) 2 of 3 2) 3 psig A. Correct. Unlike Pressurizer low pressure, containment high pressure is 2 of 3 detectors.
Adverse containment pressure setpoint is 3 psig.
An B. Incorrect. 22 psig is the high-high containment spray setpoint.
C. Incorrect. Coincidence is 2 of 3. The coincidence for Containment Spray and Phase B is 2 of 4 channels (vice only 3 for SI)
D. Incorrect. This is the correct setpoint for Phase B and Containment Spray.
Technical
References:
OIM B-6-5, B-6-8 References to be provided to applicants during exam: None 62 Learning Objective: 37048 Analyze automatic features and interlocks associated with the RPS Question Source:
(note changes; attach parent)
Bank #
Modified Bank #48 DCPP NRC Exam 01/2010 New X
L1 Question History:
Question Cognitive Level:
Past NRC Exam Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis Yes No X
10CFR Part 55 Content: 55.41.7 Difficulty: 2.3 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 1 APE 054 AK3.04 Knowledge of the reasons for the following Group # 1 responses as they apply to the Loss of Main Feedwater (MFW): K/A # APE 054 Actions contained in EOPs for loss of MFW AK3.04 Rating 4.4 Question 49 Unit 1 is at 100% power when 11 Main Feedwater pump trips and the crew enters OP AP-15, Loss of Feedwater Flow.
A programmed ramp has initiated.
In accordance with a Caution in OP AP-15, why is it important to prevent excessive Tavg/Tref deviation causing the Group II Steam Dump valves to open? y A. Resulting swell could cause P-14 actuation.
Ke B. Resulting shrink could cause a reactor trip on low steam generator level.
C. The excessive demand could cause a reactor trip on low pressurizer pressure.
er D. The excessive demand could cause rods to drive below the Rod Insertion Limit.
Explanation: sw Proposed Answer: A. Resulting swell could cause P-14 actuation.
A. Correct. OP AP-15 cautions: If excessive demand causes the Group II steam dumps to open, S/G swell will likely cause a P 14 actuation An B. Incorrect. Steam generators will swell, not shrink. Shrink is the reason for starting the AFW pumps at step 1.
C. Incorrect. Steam dumps remove heat and will drive Tavg lower. RCS pressure lowers as the colder RCS water is cooled. Plausible because excessive cooldown can cause SI or low pressure trip.
D. Incorrect. Plausible to think that maintaining a large Tavg/Tref difference will drive rods 62 deeper and potentially below the RIL.
Technical
References:
OP AP-15, LPA-15 References to be provided to applicants during exam: None Learning Objective:Given an abnormal condition, summarize the major actions of L1 OP AP-15 to mitigate an event in progress. (3477Q)
Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.5 Difficulty: 2.0 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 APE 056 AA2.45 Ability to determine and interpret the following Group # 1 as they apply to the Loss of Offsite Power: Indicators to assess K/A # APE056 status of ESF breakers (tripped/not-tripped) and validity of AA2.45 alarms (false/not-false) Rating 3.6 Question 50 A loss of offsite power occurs on Unit 2 and subsequently PK18-17, 4KV BUS F BUS OR SU FDR UV, is lit.
What Green and White light indications for a pump powered by 4 kV Bus F would confirm the alarm that a loss of the bus has occurred? (ONLY lights outlined in RED are lit)
A. y Ke B.
er sw C.
An 62 L1 D.
DCPP L162 Exam Rev 1
Proposed Answer: B.
Explanation:
4 KV bus F powers ESF pumps - ASW pump 21, AFW pump 23, CCP, CCW and SI pumps 21.
A. Incorrect. Loss of control power makes white light go out. Plausible if its thought the lights are powered by control power and would be on with or without bus power.
B. Correct. The white light is indication the bus is energized, the red and green lights are y
powered by DC control power. Therefore, if the bus is de-energized, the green light will be on but the white light will be out.
Ke C. Incorrect. If the bus powered all the lights, this would be correct.
D. Incorrect. This is backwards of the expected indication and if its thought the white light indicates control power.
Technical
References:
OIM J-1-1, OP AP-27 References to be provided to applicants during exam: None Question Source:
(note changes; attach parent) er Learning Objective: 41081Discuss abnormal conditions associated with the 4KV System Bank #
Modified Bank #
Question History:
Question Cognitive Level:
sw New Past NRC Exam Last Two NRC Exams Memory/Fundamental X
No No 10CFR Part 55 Content:
Difficulty: 2.3 An Comprehensive/Analysis 55.41.8 X
62 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 1 APE 057 AA1.06 Ability to operate and / or monitor the following Group # 1 as they apply to the Loss of Vital AC Instrument Bus: Manual K/A # APE 057 control of components for which automatic control is lost AA1.06 Rating 3.5 Question 51 GIVEN:
- Unit 2 tripped from full power
- All steam generator narrow range levels are now 60% and rising
- AFW flow hand controllers are in AUTO with 30% demand y
A loss of PY-23 occurs. As a result, power is lost to the hand controllers for Steam Generator AFW Control valves, LCV-110 and LCV-111.
will be in:
A. MANUAL with 30% demand Ke When power is restored to PY-23 the Control Room hand controllers for LCV-110 and LCV-111 B. MANUAL with 100% demand C. AUTO with 30% demand er D. AUTO with 100% demand sw Proposed Answer: B. MANUAL with 100% demand Explanation:
An A. Incorrect.HC will be in MANUAL, however, the valves go to the full open position, 100%.
30% is plausible as it could be the fail position is "as is".
B. Correct. Upon restoration of power, HC will be in MANUAL with demand output of 100%
(4.0 mA) and valve fully open C. Incorrect. At the Hot Shutdown Panel, If HIC (controller) is in AUTO when power is lost, 62 HIC will fail as-is and demand signal will continue to pass through to the valve. Upon restoration of power, HIC will be in AUTO.
D. Incorrect. Upon loss and restoration of power to the Tricon, setpoint will return to the value that existed before power was lost. Tricon power was not lost, power to the controllers was lost.
L1 Technical
References:
OP O-2 attachment 1 References to be provided to applicants during exam: None Learning Objective: 37637 - Analyze automatic features and interlocks associated with the AFW system Question Source: Bank #51 DCPP NRC Exam 08/2014 X (note changes; attach parent) Modified Bank #
New Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.7 DCPP L162 Exam Rev 1
Difficulty: 3.0 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 1 APE 058 G2.2.37 Loss of DC Power: Ability to determine Group # 1 operability and/or availability of safety related equipment. K/A # APE 058 G2.2.37 Rating 3.6 Question 52 Unit 1 is at 100% power.
A loss of DC bus 12 and PY-12 occurs.
Per OP AP-23, Loss of Vital DC Bus, which of the following occurs?
- 1) Main Feedwater is isolated y
- 3) One Train of SSPS Slave relays is de-energized A. 1 and 2 Ke
- 2) No control for one Emergency Diesel Generator from the Control Room B. 1 and 3 C. 2 ONLY er D. 3 ONLY Proposed Answer: A. 1 and 2 Explanation:
sw An A. Correct. Loss of DC bus 12 cause the main reg valve solenoids to de-energize, isolating main Feedwater. The SSPS relays are powered from PY-11 and 14 and are not affected.
Control of one diesel (1-2) is affected due to the loss of control power.
B. Incorrect. The SSPS relays are powered from PY-11 and PY-14.Plausible the power supplies would be PY-11 and PY-12.
C. Incorrect. There is a loss of control for one diesel but there is also a loss of power to the 62 MFW solenoids and MFW isolates.
D. Incorrect. Some SSPS solenoids do lose power, however, only for PY-11 or PY-14, not PY-12.
Technical
References:
OP AP-23 L1 References to be provided to applicants during exam: None Learning Objective:State the power supplies to Pressurizer, Pressure & Level Control System components. (9990)
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.7 Difficulty: 3.3 DCPP L162 Exam Rev 1
PRA - Vital 125 VDC is number 1 system in risk importance y
Ke er sw An 62 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 1 APE 062 AK3.03 Knowledge of the reasons for the following Group # 1 responses as they apply to the Loss of Nuclear Service Water: K/A # APE 062 Guidance actions contained in EOP for Loss of nuclear service AK3.03 water Rating 4.0 Question 53 The crew is aligning Unit 1 for Cold Leg Recirculation in accordance with E-1.3, Transfer to Cold Leg Recirculation.
Only one train of ASW is available.
When the crew completes the alignment, the reason only one RHR heat exchanger and three CFCUs will be in operation is to prevent: y A. runout of the CCW pump B. runout of the ASW pump Ke C. flashing and water hammer in the ASW system er D. exceeding CCW system temperature design limit Explanation: sw Proposed Answer: D. exceeding CCW system temperature design limit Design of the ASW (Diablo equivalent to Nuclear Service Water) system is to adequately remove CCW heat. EOP E-1.3 includes operator actions to limit the heat loads during post-An LOCA cold-leg recirculation if less than two ASW pumps and two CCW heat exchangers are in Service (a loss of one train).
A. Incorrect. With a single train of CCW in service, its plausible the student could focus on the single CCW train and believe runout is a possibility. The problem is due to the lack of cooling (from ASW), CCW heat removal is reduced to the point that if loads are not restricted, design temperature could be exceeded.
62 B. Incorrect. The system is designed for one pump to supply both CCW trains during normal operation without runout. Plausible because, if one train is supplying both trains of CCW, then its possible to think the loads could cause the only running ASW pump to approach runout.
L1C. Incorrect. Temperature remains less than saturation. Plausible because if two trains of CCW were put into service with only one train of ASW, temperature will rise.
D. Correct. The heat load of all the loads on the CCW with only one ASW train could cause the system to not be able to meet its purpose to remove heat from the CCW system and the CCW system could exceed its design temperature.
Technical
References:
E-1.3, LF-2 References to be provided to applicants during exam: None Learning Objective: 8105 - Explain significant CCW system design features and the importance to nuclear safety Question Source: Bank #14 DCPP NRC (07/2011) X (note changes; attach parent) Modified Bank #
New DCPP L162 Exam Rev 0
Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.8 Difficulty: 2.7 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 APE 065 AA2.08 Ability to determine and interpret the following Group # 1 as they apply to the Loss of Instrument Air: Failure modes of air- K/A # APE 065 operated equipment. AA2.08 Rating 2.9 Question 54 Unit 1 is tripped due to a loss of instrument air.
Backup nitrogen is not available to a 10% steam dump valve.
- 1) Without instrument air or nitrogen, the 10% steam dump valve fails:
- 2) The operator can regain control of the valve by: y A. 1) open Ke
- 2) placing the AUTO/MANUAL controller in MANUAL and using the increase/decrease pushbuttons on VB3 B. 1) open C. 1) closed er
- 2) using the Cut-in toggle switch and the OPEN/CLOSE switch on VB3
- 2) placing the AUTO/MANUAL controller in MANUAL and using the increase/decrease pushbuttons on VB3 D. 1) closed sw
- 2) using the Cut-in toggle switch and the OPEN/CLOSE switch on VB3 Explanation:
An Proposed Answer: D. 1) closed 2)using the Cut-in toggle switch and the OPEN/CLOSE switch on VB3 A. Incorrect. The valve fails closed. Plausible to think the position is open to because its function is to cooldown the plant and it has an isolation valve which could be closed if 62 necessary. The controller is not part of the circuit when using backup air.
B. Incorrect. The valve fails closed. The cut-in switch allows operation using backup air via the open/close switch.
C. Incorrect. The valve fails closed, but air to operate the valve is not thru the controller.
L1D. Correct. the valve fails closed. Backup air is supplied thru the cut-in switch and then controlled using the open/close switch on VB3.
Technical
References:
LC-2B pages 29 to 31 References to be provided to applicants during exam: None Learning Objective: Describe controls, indications, and alarms associated with the Steam Dump System. (37810)
Question Source: Bank #26 DCPP NRC 04/2016 X (note changes; attach parent) Modified Bank #
New Past NRC Exam Yes Question History: Last Two NRC Exams Yes Question Cognitive Level: Memory/Fundamental DCPP L162 Exam Rev 0
Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.7 Difficulty: 2.3 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO E11 EK1.3 Knowledge of the operational implications of the Tier # 1 following concepts as they apply to the (Loss of Emergency Group # 1 Coolant Recirculation) Annunciators and conditions indicating K/A # E11 EK1.3 signals, and remedial actions associated with the (Loss of Rating 3.6 Emergency Coolant Recirculation).
Question 55 The crew is performing the actions of ECA-1.2, LOCA Outside Containment.
- 1) The crew will transition from ECA-1.2 to ECA-1.1, Loss of Emergency Coolant Recirculation, if _________ is NOT increasing when ECA-1.2 is completed.
- 2) A major action of ECA-1.1, is to _____________________.
A. 1) RCS pressure y
- 2) continue attempts to identify and isolate the LOCA
- 2) conserve RWST inventory D. 1) Pressurizer level er
Explanation:Answer:
sw Question addresses the condition for entry into ECA-1.1 and the remedial action to take IAW ECA-1.1. Major actions of EOPs and exit conditions are identified in the lesson material as RO knowledge.
An The following are the major actions for ECA-1.1:
- Continue attempts to restore emergency coolant recirculation
- Raise/conserve RWST level
- Initiate cooldown to cold shutdown
- Depressurize the RCS to minimize subcooling
- Try to add make-up to the RCS from alternate sources, 62
- Depressurize the S/Gs to cooldown and depressurize the RCS
- Maintain RCS heat removal A. Incorrect. RCS pressure is the parameter checked. ECA-1.1 does not attempt to isolate a LOCA, regardless of location. Focus is to conserve RWST and attempt to restore L1 emergency coolant recirc.
B. Incorrect. RCS pressure is the parameter checked. ECA-1.1 does not attempt to isolate a LOCA, regardless of location. Focus is to conserve RWST and attempt to restore emergency coolant recirc. Pressurizer level is plausible because it is a parameter that should be restored but pressure is the more immediate and therefore, indication checked.
C. Correct. RCS pressure should respond by rising if the leak isolation is successful, otherwise, the transition to ECA-1.1 is made to take actions that include refilling and conserving RWST.
D. Incorrect. Action is correct, but the parameter is RCS pressure, not pressurizer level.
Technical
References:
ECA-1.2, ECA-1.1 References to be provided to applicants during exam: None Learning Objective: 42461 -Explain basis of emergency steps of ECA-1.1 DCPP L162 Exam Rev 1
Explain the general purpose/function (including major action categories [MACs]) of EOPs (E-1.3/4, ECA-1 series). (3551F/J)
Identify exit conditions for the EOPs. (5433)
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.10 Difficulty: 2.7 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 1 APE 077 AK2.07 Knowledge of the interrelations between Group # 1 Generator Voltage and Electric Grid Disturbances and the K/A # APE 077 following: Turbine / generator control. AK2.07 Rating 3.6 Question 56 A grid disturbance causes Triconex DEHC frequency to rise, causing speed to rise.
Once speed rises to its overspeed setpoint of ____1)____, the ______2)______ valves close.
A. 1) 101% 2) reheat stop B. 1) 101% 2) turbine governor and reheat intercept y
C. 1) 103% 2) reheat stop D. 1) 103% 2) turbine governor and reheat intercept Ke Explanation: er Proposed Answer: D. 1) 103% 2) turbine governor and reheat intercept The primary feature of the OPC is the 103% overspeed protection. At 103 percent, the sw governor and intercept valves are closed until the speed decays to approximately 101 percent A. Incorrect. Reheat stop valves do not close. Plausible because reheat valves close, but its the intercept valves.
B. Incorrect. Plausible because these are valves that do close, however, the setpoint is 103% to close .
An close (101% to reopen).
C. Incorrect. The reheat stop valves do not close. Plausible because the reheat intercept valve D. Correct. Both the governor and reheat intercept valves close to slow down the turbine.
Technical
References:
LC-3B, pages 26, 27 and 28 References to be provided to applicants during exam: None 62 Learning Objective: Analyze automatic features and interlocks associated with the Turbine Control Oil System. (37644)
Question Source: Bank #
L1 (note changes; attach parent)
Question History:
Question Cognitive Level:
Modified Bank #16 DCPP NRC 10/2016 New Past NRC Exam Last Two NRC Exams (modified question)
Memory/Fundamental X
Yes No X
Comprehensive/Analysis 10CFR Part 55 Content: 55.41.7 Difficulty: 2.0 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 APE 001 AK1.18 Knowledge of the operational implications of Group # 2 the following concepts as they apply to Continuous Rod K/A # APE001 Withdrawal: Fuel temperature coefficient. AK1.18 Rating 3.4 Question 57 A continuous rod withdrawal accident occurs at Hot Zero Power.
According to the FSAR,
- 1) Uncorrected, power will be turned by:
- 2) The reactor trip expected to occur is:
A. 1) Moderator Temperature Coefficient y
- 2) Power Range High Flux - Low B. 1) Moderator Temperature Coefficient
- 2) OTT Ke C. 1) Doppler Coefficient
- 2) Power Range High Flux - Low D. 1) Doppler Coefficient er
- 2) OTT sw Proposed Answer: C. 1) Doppler Coefficient 2) Power Range High Flux - Low Explanation:
An A. Incorrect. MTC does not react as quickly at Doppler, which once above the POAH, rises as quickly as fuel temperature rises. The assumed trip is PR high flux, low.
B. Incorrect. MTC is not a factor in turning power. The OTT trip is the assumed trip at power.
C. Correct. Doppler is the coefficient to turn power. Once in the power range, the reactor is 62 assumed to trip at the PR high flux low setpoint.
D. Incorrect. Doppler is the correct coefficient, however, OTT is the assumed trip for this accident at power.
Technical
References:
LTAA 5, pages 7 - 10 L1 References to be provided to applicants during exam: None Learning Objective: 3444 Explain the plants response to reactivity addition accidents described in the FSAR.
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.1 Difficulty: 3.7 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 APE 005 AK2.02 Knowledge of the interrelations between the Group # 2 Inoperable / Stuck Control Rod and the following: Breakers, K/A # APE 005 relays, disconnects, and control room switches AK2.02 Rating 2.5 Question 58 During a down power, a Control Bank D rod became misaligned.
- 1) What could have caused the rod to become misaligned?
- 2) In accordance with OP AP-12B, Control Rod Misalignment, if the crew attempts to realign the rod, the relay disconnect(s) for _________ will be opened to align the rod and the bank.
A. 1) power cabinet urgent failure y
- 2) only the affected rod B. 1) power cabinet urgent failure
- 2) all unaffected rods in the bank Ke C. 1) blown lift coil fuse
- 2) only the affected rod D. 1) blown lift coil fuse er
- 2) all unaffected rods in the bank sw Proposed Answer: D. 1) blown lift coil fuse 2) all unaffected rods in the bank Explanation:
An A. Incorrect. Power cabinet failure would have stopped all rods in the bank from moving. The rod is aligned to the bank, therefore, its lift coil is left connected, the rest of the lift coils are opened. Plausible because the power cabinet failure would stop rod motion and if its thought the bank is aligned to the rod, not vice versa.
B. Incorrect. Action is correct, but a power cabinet urgent failure will stop all rods.
62 C. Incorrect. A blown fuse will not generate an urgent failure because the bank is moving, but will stop an individual rod from moving. Action is not to align bank to the rod but vice versa.
D. Correct. The lift coil fuse failure would cause the rod to stop moving. The rod does not L1 drop because the stationary or movable gripper is always energized. The action is to align rod to bank, so the unaffected rods are disconnected and only the affected rod is left connected to move to the bank.
Technical
References:
OP AP-12B, LA-3A page 11 and 69 References to be provided to applicants during exam: None Learning Objective: Discuss abnormal conditions associated with the Rod Control System.
(9903)
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No DCPP L162 Exam Rev 0
Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.2 Difficulty: 2.3 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 APE 032 AK3.01 Knowledge of the reasons for the following Group # 2 responses as they apply to the Loss of Source Range Nuclear K/A # APE032 Instrumentation: Startup termination on source-range loss AK3.01 Rating 3.2 Question 59 The reactor is critical in the source range below P-6, IR Permissive.
Excore Source Range channel, N31, instrument power fuse blows.
The startup will be:
A. terminated because the reactor automatically trips. y energize with only one source range available. Ke B. suspended and the reactor maintained critical in the source range because P-6 will not C. terminated and all control rods driven in because two OPERABLE source range channels are required when the reactor is critical below P-6.
er D. suspended and the reactor maintained critical in the source range because two OPERABLE source range channels are required to raise power to P-6.
Explanation: sw Proposed Answer: A. terminated because the reactor automatically trips.
A. Correct. Loss of the instrument power fuse causes the SR High Level trip bistable to cause an automatic reactor trip.
An B. Incorrect. P-6 requires IR channels to reach the setpoint. There is no setpoint for the source range and P-6. Plausible because during the startup, the source ranges are monitored for 1 decade of overlap with the intermediate ranges and P-6 alarming, before reaching the source range trip setpoint. NOTE: all "remain critical" distractors are plausible as the trip would not occur if the trip/bypass switch was in "bypass" when the instrument fuse failed.
C. Incorrect. Two source ranges are required below P-6 and for instances, such as critical 62 below the RIL, rods are driven in, the reason for termination is a reactor trip.
D. Incorrect. If the reactor trip is not recognized, maintaining stable conditions is plausible.
Technical
References:
OIM B-4-2, B-6-2 References to be provided to applicants during exam: None L1 Learning Objective: Discuss abnormal conditions associated with the NIS5992 Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.2 Difficulty: 2.3 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 1 APE 051 - Loss of Condenser Vacuum: G2.1.32 Ability to explain Group # 2 and apply system limits and precautions. K/A # APE 051 G2.1.32 Rating 4.0 Question 60 GIVEN:
- Unit 1 is currently at 47% power and reducing power to 40% in accordance with OP AP-7, Degraded Condenser
- PK10-11, Condenser Pressure/Level, is in alarm
- Indicated condenser pressure on VB3 is 7.8 Hg and stabilizing
- No automatic actions have occurred y A. manually trip the turbine B. manually trip the reactor Ke In accordance with OP AP-7, with these conditions, the crew will: _______________________.
C. stabilize power D. continue the power reduction er Explanation: sw Proposed Answer: A. manually trip the turbine The candidate must explain the reason for the action to be taken, when applying the limit for condenser pressure at 47% of 7.2". Proper procedural action is to trip the turbine below P-9 (50%).
An A. Correct. At or above 50%, the reactor is tripped (which generates a turbine trip). However, below 50%, (less than P-9, the action is to trip the turbine).
B. Incorrect. If power is above P-9, the reactor is tripped. Plausible if setpoint for P-8, (loss of loop flow), of 35% is used, this would be the correct answer.
62 C. Incorrect. Trip setpoint from the graph is 7.2. The action is to trip the reactor (above 50%)
or turbine (below 50%). Plausible if graph is misapplied and power could be stabilized because condenser pressure is stabilizing.
D. Incorrect. Trip setpoint from the graph is 7.2. The action is to trip the reactor (above 50%)
L1 or turbine (below 50%). Plausible if graph is misapplied and it thought a power reduction should be continued to recover condenser pressure.
Technical
References:
OP AP-7, attachment 2, OIM page B-6-2 References to be provided to applicants during exam: AP-7, Attachment 2 Learning Objective: 3477G Given an abnormal condition, summarize the major actions of OP AP-7 to mitigate an event in progress.
Question Source: Bank #58 DCPP NRC 11/2012 X (note changes; attach parent) Modified Bank #
New Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental DCPP L162 Exam Rev 1
Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.4 Difficulty: 3.7 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 APE 069 AK2.03 Knowledge of the interrelations between the Group # 1 Loss of Containment Integrity and the following: Personnel K/A # APE 069 access hatch and emergency access hatch AK2.03 Rating 2.8 Question 61 Which of the following ensures Containment integrity is maintained while the unit is at power?
A. Neither airlock door can be opened if the airlock seal pressure is low.
B. After a time delay, an alarm is received in the Control Room if an airlock door is open for an extended period of time.
y C. A watch is stationed to immediately close the doors, if required, when both doors of an airlock are opened.
Ke D. Air leakage past the seals for the airlock doors is automatically tested each time the doors are operated and causes an alarm in the Control Room if leakage is unsatisfactory.
Explanation:
er Proposed Answer: D. Air leakage past the seals for the airlock doors is automatically tested each time the doors are operated and causes an alarm in the Control Room if leakage is unsatisfactory same time. sw A. Incorrect. Plausible there is an interlock but it prevents both doors from being open at the B. Incorrect. Plausible, there is an alarm for a door open, but there is no time delay and a door open does not challenge containment integrity.
An C. Incorrect. Plausible, comp measures are sometimes allowed to take action if an automatic action is inoperable but this would not maintain containment integrity.
D. Correct. An air test is done after a door is closed. If its excessive, PK11-12 alarms to alert the operator that leakage is potentially above what is allowed by technical specifications.
Technical
References:
AR PK11-12, AR PK11-24, LI-1 References to be provided to applicants during exam: None 62 Learning Objective: 9697I Apply TS 3.9 Technical Specification LCOs Question Source:
(note changes; attach parent)
Bank #23 DCPP L091, 07/2011 Modified Bank #
New X
L1 Question History:
Question Cognitive Level:
Past NRC Exam Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis Yes No X
10CFR Part 55 Content: 55.41.10 Difficulty: 3.7 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 1 EPE 074 EA2.03 Ability to determine or interpret the following Group # 2 as they apply to Inadequate Core Cooling: Availability of turbine K/A # EPE 074 bypass valves for cooldown EA2.03 Rating 3.8 Question 62 GIVEN:
- The crew is performing the actions of EOP FR-C.1, Response to Inadequate Core Cooling
- RCPs have been secured by the operator
- All steam generators are intact and at approximately 1040 psig
- MSIVs are open
- All electrical buses are powered from startup
- RCS pressure is 1900 psig y
Ke The crew is preparing to depressurize the steam generators in order to inject accumulators.
In accordance with EOP FR-C.1, the operators will depressurize using the:
A. 10% steam dumps at a rate not to exceed 100°F/hr.
er B. 10% steam dumps at a maximum rate without achieving a Main Steam Isolation.
sw C. 40% steam dumps at a rate not to exceed 100°F/hr.
D. 40% steam dumps at a maximum rate without achieving a Main Steam Isolation.
Proposed Answer: D. 40% steam dumps at a maximum rate without achieving a Main Steam Explanation: An Isolation.
Condenser is available - all buses are on startup and steam generators are intact, so the MSIVs will be open and the condenser steam dumps (40% steam dumps) will be used.
A. Incorrect. Plausible - this would the TS cooldown rate and not usually exceeded. In this 62 instance, a more rapid cooldown is required to inject the accumulators and not allow conditions to degrade further.
B. Incorrect. Plausible - this is the rate for using the 40% steam dumps.
C. Incorrect. Plausible - the 40% steam dumps will be used, but this is the TS cooldown rate L1 and not usually exceeded. In this instance, a more rapid cooldown is required to inject the accumulators and not allow conditions to degrade further.
D. Correct. Using the 40% steam dumps is the preferred method and done at a rate to maintain the MSIVs open.
Technical
References:
EOP FR-C.1 step 12 References to be provided to applicants during exam: None Learning Objective: 7920M Explain basis of emergency procedure steps (FR-Cs)
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No DCPP L162 Exam Rev 1
Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.41.5 Difficulty: 2.7 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 E13 EA1.1 Ability to operate and / or monitor the following as Group # 1 they apply to the (Steam Generator Overpressure) Components, K/A # E13 EA1.1 and functions of control and safety systems, including Rating 3.1 instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Question 63 GIVEN:
- The plant tripped from full power due to P-14, Steam Generator High-High Level Turbine Trip, actuation
- The affected steam generator narrow range level is now 100% and pressure is 1130 psig
- RCS temperature is 562°F
- Both reactor trip breakers are open y
Step 2 of EOP FR-H.2 states:
- 2. VERIFY FW Isolation To Affected S/G:
Ke
- The crew enters EOP FR-H.2, Response to Steam Generator Overpressurization
- a. Mn Fdwtr Control Valves - CLOSED
- b. Mn Fdwtr Control Bypass Valves -
CLOSED er sw
- c. Mn Fdwtr Isol Vlvs - CLOSED
- 1) The operator should observe White Monitor light box lights OUT for ___________.
An
- 2) For the current steam generator pressure the Steam Generator Safety Valve with the HIGHEST lift setpoint should be ___________.
A. 1) step 2c ONLY
- 2) closed 62 B. 1) steps 2.a, 2.b and 2.c
- 2) closed C. 1) step 2.c ONLY L1 2) open D. 1) steps 2.a, 2.b and 2.c
- 2) open Proposed Answer: D. 1) Steps 2.a, 2.b and 2.c 2) open Explanation:
A. Incorrect. P-14 closes all the valves listed. Because RCS temperature is above 554°F, its plausible to believe the Main Feedwater Reg and bypass are still open (closed by SI, P-14 or Low RCS Tave/P-4).
B. Incorrect. All 5 safeties will be open above 1115 psig. Plausible - all the valves will be closed and the safety setpoints may not be known.
C. Incorrect. All the valves will be closed. Plausible - all 5 safeties will be open.
DCPP L162 Exam Rev 0
D. Correct. All the valves are closed by P-14 and the highest setpoint for the safeties is 1115 psig, therefore, for the current pressure, all will be open.
Technical
References:
LC-2A, OIM B-6-12 , EOP FR-H.2 References to be provided to applicants during exam: None Learning Objective: Analyze automatic features and interlocks associated with the Main Steam System. (7340)
Analyze automatic features and interlocks associated with the Main Feedwater System. (37614)
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis 55.41.7 y X 10CFR Part 55 Content:
Difficulty: 3.3 Ke er sw An 62 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 1 E15 EK3.2 Knowledge of the reasons for the following responses Group # 2 as they apply to Containment Flooding: Normal, abnormal and K/A # E15 EK3.2 emergency operating procedures associated with Containment Rating 2.8 Flooding.
Question 64 Unit 1 has experienced a large break Loss of Coolant Accident.
The operator reports that containment recirc sump level is 99 feet. The STA reports that the Critical Safety Function Status tree for Containment Integrity is MAGENTA due to the sump level.
The crew will enter FR-Z.2, Response to Containment Flooding:
y Ke A. to determine what additional water source is filling containment above design level.
B. but immediately exit it once it is verified that this is approximately the expected level when the RWST reaches the transfer to cold leg recirc setpoint.
er C. to check for indications of a faulted steam generator.
D. but immediately exit it once it is verified that this is approximately the expected level when sw the RWST reaches the level for containment spray termination.
Proposed Answer: A. to determine what additional water source is filling containment above Explanation:
An design level.
A. Correct. FRZ-2 step 1 directs operators to exit Flooding in Containment for recirc sump levels less than 95.75 feet. A level of 99 feet is much higher than what is expected for a LCOA. The Response to Containment Flooding Background Document, FRZ-2, states, The maximum level of water in the containment following a major accident generally is based 62 upon the entire water contents of the reactor coolant system, refueling water storage tank, condensate storage tank, and SI accumulators.
B. Incorrect. The status tree may just be magenta during a LOCA but will not reach 99 feet.
L1 This is the water volume from the RCS, RWST, CST, and 4 SI Accumulators. This approximates the maximum water volume introduced following a LOCA plus a steamline or feedline break inside of containment.
C. Incorrect. The correct level per step 1 of FRZ-2 is 95.75 feet. The maximum level of water in the containment following a major accident generally is based upon the entire water contents of the reactor coolant system, refueling water storage tank, condensate storage tank, and SI accumulators. This is the volume of LOCA plus a steamline or feedline break.
D. Incorrect. The status tree may just be magenta during a LOCA but will not reach 99 feet.
The correct level per step 1of FRZ-2 is 95.75 feet.
Technical
References:
F-0, FR-Z.2 background, FR-Z.2 References to be provided to applicants during exam: None DCPP L162 Exam Rev 1
Learning Objective: Explain the basis of emergency procedure steps. (7920Q, R)
Question Source: Bank #63 DCPP NRC 11/2012 X (note changes; attach parent) Modified Bank #
New Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.7 Difficulty: 3.0 y
Ke er sw An 62 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 1 E08 EK1.3 Knowledge of the operational implications of the Group # 2 following concepts as they apply to Pressurized Thermal Shock: K/A # E08 EK1.3 Annunciators and conditions indicating signals, and remedial Rating 3.5 actions associated with Pressurized Thermal Shock.
Question 65 The crew is performing EOP FR-P.1, Response to Pressurized Thermal Shock.
- 1) In FR-P.1, an indication a soak is required is if RCS _______ leg temperatures exceed 100°F cooldown rate in any one hour.
- 2) In accordance with FR-P.1, ___________________________would be allowed during the soak.
A. 1) HOT
- 2) energizing pressurizer heaters to raise RCS pressure B. 1) COLD
- 2) depressurizing to minimize RCS subcooling C. 1) HOT
- 2) depressurizing to minimize RCS subcooling D. 1) COLD
- 2) energizing pressurizer heaters to raise RCS pressure Proposed Answer: B. 1) COLD 2) depressurizing to minimize RCS subcooling Explanation:
A. Incorrect. The cold legs are used because they are the best indication of downcomer temperature. During the soak, actions pressure is not allowed to increase during the soak.
B. Correct. Cold legs are used because they are the best indication of downcomer temperature.
The soak allows reduction of the thermal stress imposed by the cooldown on the reactor vessel. Allowable actions are those that do not cooldown the RCS or increase pressure.
C. Incorrect. Cold legs are used, not the hot legs. The action would be allowed.
D. Incorrect. Partially correct, cold legs are used, however, raising pressure is not allowed.
Technical
References:
FRR-P.1 step 24 and background References to be provided to applicants during exam: None Learning Objective: 4133 Explain RCS soak requirements Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.41.5 Difficulty: 2.7 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 3 G2.1.3 - Knowledge of shift or short-term relief turnover Group # 1 practices. K/A # G2.1.3 Rating 3.7 Question 66 Both units are at 100% power.
- 1) In accordance with OP1.DC37, Plant Logs the _________ is responsible for completing the Shift Watch List.
- 2) If the minimum staffing requirements for Unit 2 cannot be met, the __________ is notified.
A. 1) Work Control SFM B. 1) Work Control SFM C. 1) Work Control Lead
- 2) Operations Manager
- 2) Shift Manager
- 2) Operations Manager Key D. 1) Work Control Lead 2) Shift Manager Explanation:
sw Proposed Answer: D. 1) Work Control Lead 2) Shift Manager er A. Incorrect. While the WCSFM has an SRO license and maintains oversight, the WCL is responsibility of completing the Shift Watch list and while the Operations Manager has control of the department, the SM has the responsibility to ensure minimum staffing is met.
B. Incorrect. The SM is notified but its the WCL that fills out the Shift Watch List.
An C. Incorrect. The WCL is responsible, and while the Operations Manager has control of the department, the SM has the responsibility to ensure minimum staffing is met.
D. Correct. The WCL is responsible to fill out the Shift Watch List and notify the SM is staffing is deficient.
Technical
References:
OP1.DC37 References to be provided to applicants during exam: None 62 Learning Objective: 7845 - Demonstrate the ability to apply administrative guide lines relative to shift staffing Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
L1 Question History:
Question Cognitive Level:
New Past NRC Exam Last Two NRC Exams Memory/Fundamental X
No No X
Comprehensive/Analysis 10CFR Part 55 Content: 55.41.10 Difficulty: 2.0 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 3 G2.1.40 Knowledge of refueling administrative requirements. Group # 1 K/A # G2.1.40 Rating 2.8 Question 67 In accordance with OP B-8DS2, Core Loading, which of the following is a responsibility of the RO in the Control Room during core loading?
A. Coordinating Core Alterations B. Authorizing an unplanned deviation C. Maintaining the record of fuel movement y Ke D. Determining the cause of a Containment radiation monitor high alarm Proposed Answer: C. Maintaining the record of fuel movement Explanation:
er A. Incorrect.This is the responsibility of the Refueling SRO B. Incorrect. Responsibility of Reactor Engineering.
C. Correct. Responsibility of RO in the Control Room Technical
References:
OP B-8DS2 Learning Objective:
Question Source:
sw D. Incorrect. Responsibility of Refueling SRO References to be provided to applicants during exam: None Bank #67 DCPP NRC L091C 03/2012 X Question History:
An (note changes; attach parent) Modified Bank #
New Past NRC Exam Last Two NRC Exams Yes No Question Cognitive Level: Memory/Fundamental X 62 10CFR Part 55 Content:
Difficulty: 2.0 Comprehensive/Analysis 55.41.10 L1 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 3 G2.1.15 - Knowledge of administrative requirements for Group # 1 temporary management directives, such as standing orders, night K/A # G2.1.15 orders, Operations memos, etc. Rating 2.7 Question 68 In accordance with OP1.DC31, Dissemination of Operations Information, which of the following types of communication would be used to inform crews of compensating measures for equipment operation for the next four weeks?
A. Operations Awareness Bulletin B. Operations Standing Order C. Operations Shift Order y D. Operations Policy Proposed Answer: B. Operations Standing Order Explanation:
Ke A. Incorrect. Awareness bulletins are addressed in OM15.ID11, Human Performance Event Response, used to share information about a plant event that is not a clock reset but is er deemed important to share with the organization.
B. Correct. Per OP1.DC31, Standing orders are longer term instructions (week or longer) and may include lessons learned, work arounds and compensatory measures sw C. Incorrect. Shift orders are short term instructions or communications for immediate use.
Shift orders should not be utilized for dissemination of information which will exist long term (i.e., greater than one week). Longer term information should be included in the standing orders, or tracked by other appropriate means, such as procedure changes D. Incorrect. Policies are for all of operations and not signed off by an individual crew. There An is no end date for a policy (has a revision number). Additionally, per OP1.DC31, crews are notified of a policy change by shift order.
Technical
References:
OP1.DC31, OM15.ID11 References to be provided to applicants during exam: None 62 Learning Objective: 46999 - Describe shift orders, standing orders, incident summaries, and operations policies, per OP1.DC31, section 4 Question Source:
(note changes; attach parent)
Bank #
Modified Bank #67 DCPP NRC Exam 8/14 X L1 Question History:
Question Cognitive Level:
New Past NRC Exam Last Two NRC Exams Memory/Fundamental Yes No X
Comprehensive/Analysis 10CFR Part 55 Content: 55.41.10 Difficulty: 2.3 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 3 G2.2.43 - Knowledge of the process used to track inoperable Group # 2 alarms. K/A # G2.2.43 Rating 3.0 Question 69
- 1) In accordance with OP1.DC37, Plant Logs, how often is the Control Operator required to review the open main annunciator problem evaluation sheets/defeat logs?
- 2) If a Control Room annunciator must be defeated at the Cable Spreading Room Maintenance Terminal, it is defeated by:
A. 1) Prior to assuming the watch 2) I & C B. 1) Prior to assuming the watch 2) Operations y
C. 1) Weekly D. 1) Weekly
- 2) I & C
- 2) Operations Ke Proposed Answer: A. 1)
Explanation: er Prior to assuming the watch 2) I & C A. Correct. The review is to be done at the beginning of each shift. If an alarm is defeated at sw the terminal in the CSR, it is performed by I& C.
B. Incorrect. The review is to be done at the beginning of each shift. Operations does not defeat alarms at the terminal in the CSR. They can do alarms in the Control Room.
C. Incorrect. An audit of the log is performed on a weekly basis, log is checked prior to assuming watch. Second part is correct.
An D. Incorrect. An audit of the log is performed on a weekly basis, log is checked prior to assuming watch. Operations does not defeat alarms at the terminal in the CSR. They can do alarms in the Control Room Technical
References:
OP1.DC24 step 5.5.1.a., OP.DC37, MP I-1.5-9 References to be provided to applicants during exam: None 62 Learning Objective:
Question Source:
(note changes; attach parent)
Bank #
Modified Bank #70 DCPP NRC 6/2008 New X
Yes L1 Question History:
Question Cognitive Level:
Past NRC Exam Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis 55.41.10 No X
10CFR Part 55 Content:
Difficulty: 2.0 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 3 G2.2.13 - Knowledge of tagging and clearance procedures. Group # 2 K/A # G2.2.13 Rating 4.1 Question 70 In accordance with OP2.ID2, Tagging Requirements, what type of tags are used by Operations to place equipment in a safe condition for maintenance, repair, or testing?
A. Red tags B. Danger tags C. Caution tags D. Man-on-Line (MOL) tags Proposed Answer: B. Danger tags Key Explanation:
A. Incorrect. Red tags are hung anytime a craft performs work associated within a clearance containing danger tags.
sw B. Correct. Danger tags are used to protect personnel by tagging devices used to isolate sources of liquids, steam, gases, or electrical power or place equipment in a safe condition er for maintenance, repair, or testing.
C. Incorrect. Caution tags are not used to place equipment in a safe condition. They control operation and can be operated in accordance with the instructions on the tag.
D. Incorrect. Like Danger tags, MOL tags are used to place equipment in a safe condition for maintenance, repair, or testing. However, MOL tags are only used for clearances involving Plant. An non-plant equipment or by company utility personnel from outside Diablo Canyon Power Technical
References:
OP2.ID2 References to be provided to applicants during exam: None Learning Objective:
62 Question Source:
(note changes; attach parent)
Bank #71 DCPP NRC L121 08/2014 Modified Bank #
New Past NRC Exam X
Yes L1 Question History:
Question Cognitive Level:
10CFR Part 55 Content:
Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis 55.41.10 No X
Difficulty: 2.0 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 2 G2.2.3 - Knowledge of the design, procedural, and operational Group # 2 differences between units K/A # G2.2.3 Rating 3.8 Question 71
- 1) Unit 1 has ________ Control Bank A rods.
- 2) Unit 2 has ________ Control Bank A rods.
A. 1) Four 2) Four B. 1) Eight 2) Four C. 1) Four 2) Eight D. 1) Eight 2) Eight Key Proposed Answer: B. 1) Eight 2) Four Explanation:
sw A. Incorrect. Unit 1 has eight CBA control rods and four CBB rods - the opposite of Unit 2 (4 CBA and eight CBB). This would be correct for Unit 1 CBB and Unit 2 CBA er B. Correct. The Unit 1 CBA rods is correct, Unit 2 has four rods.
C. Incorrect. Unit 1 CBA rods is eight (four for CBB), Unit 2 has eight CBB.
D. Incorrect. CBA for Unit 1 has eight rods (four for Unit 2) and Unit 2 has eight CBB (4 on Unit 1).
Technical
References:
LA-3A Question Source:
An References to be provided to applicants during exam: None Learning Objective: 5038 Describe unit differences associated with the Rod Control System (note changes; attach parent)
Bank #DCPP S-29786 Modified Bank #
X New 62 Question History:
Question Cognitive Level:
Past NRC Exam Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis No No X
L1 10CFR Part 55 Content:
Difficulty: 2.7 55.41.5 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 3 G2.3.15 - Knowledge of radiation monitoring systems, such as Group # 3 fixed radiation monitors and alarms, portable survey K/A # G2.3.15 instruments, personnel monitoring equipment, etc. Rating 2.9 Question 72 A Personal Electronic Dosimeter, (PED), for a watchstander in the Auxiliary Building will measure what type(s) of radiation?
A. Gamma only B. Beta only C. Gamma and Beta only D. Neutron, Beta and Gamma Proposed Answer: C. Gamma and Beta only Key Explanation:
A. Incorrect because a PED measures beta and gamma. Plausible because gamma is the most sw plentiful radiation present in a PWR aux building.
B. Incorrect because a PED measures both beta and gamma. Plausible because beta is a er common radiation present where leakage from radioactive systems occurs.
C. Correct. A PED measures both beta and gamma, but not neutron radiation.
D. Incorrect because a PED will not measure neutron radiation. Plausible because a TLD that can measure all 3 types can be issued, and it could be confused with the PED issued at the access point.
An Technical
References:
Fundamentals - LFC7S References to be provided to applicants during exam: None Learning Objective: DESCRIBE the characteristics and principles of operation of each of the following types of portable/personal radiation monitoring instruments. (66027) 62 Personal electronic dosimeters (PED)
Question Source:
(note changes; attach parent)
Bank #72 DCPP NRC 10-2016 Modified Bank #
New Past NRC Exam X
Yes L1 Question History:
Question Cognitive Level:
10CFR Part 55 Content:
Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis 55.41.11 Yes X
Difficulty: 2.0 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level RO Tier # 3 G2.3.4 - Knowledge of radiation exposure limits under normal or Group # 3 emergency conditions K/A # G2.3.4 Rating 3.4 Question 73 What is the Diablo Canyon TEDE Administrative Guideline for a male worker for a calendar year?
A. 500 mrem B. 2000 mrem C. 4000 mrem D. 5000 mrem Proposed Answer: B 2000 mrem Key Explanation:
A. Incorrect. Limit for declared pregnant worker is 10% of Federal limit 500 mrem sw B. Correct. 2000 mrem is the guideline C. Incorrect. The admin limit is 80% of the federal limit or 4000 mrem.
D. Incorrect. 5000 mrem is the federal limit.
Technical
References:
RP1.ID6 er References to be provided to applicants during exam: None Learning Objective:
Question Source: Bank #71 DCPP NRC 06/2008 X (note changes; attach parent) Modified Bank #
Question History:
An Question Cognitive Level:
New Past NRC Exam Last Two NRC Exams Memory/Fundamental Yes No X
Comprehensive/Analysis 62 10CFR Part 55 Content:
Difficulty: 2.0 55.41.12 L1 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO Tier # 3 G2.4.25 -Knowledge of fire protection procedures. Group # 3 K/A # G2.4.25 Rating 3.3 Question 74 A fire in the Auxiliary Building has been reported to the Control Room.
The fire brigade has been dispatched to the scene of the fire.
Which two of the following functions does the designated OPS Responder perform per CP M-6, Site Fire Response?
- 1. Takes a direct role in the fire fighting efforts.
- 2. Performs emergency notifications to offsite personnel.
Key
- 3. Communicates with the control room on status of fire fighting efforts.
- 4. Notifies Incident Commander and Radiation Protection of changes in ventilation.
A. 1 and 2 B. 1 and 4 C. 2 and 3 D. 3 and 4 swer Proposed Answer: D. 3 and 4 Explanation:
An A. Incorrect. All actions are taken for a fire, however, the OR does not to enter the fire area or make notifications offsite (keeps CR informed).
B. Incorrect. OR not to enter the fire area, but notifies the IC and RP of ventilation changes.
C. Incorrect. Does not perform offsite notifications, but does communicate with the CR.
D. Correct. Both are duties of the OR (step 3 and 7 of attachment 7.2)
Technical
References:
CP M-6, attachment 7.2 62 References to be provided to applicants during exam: None Learning Objective:
Question Source:
(note changes; attach parent)
Bank #74 DCPP NRC Exam 06/2008 Modified Bank #
X L1 Question History:
Question Cognitive Level:
New Past NRC Exam Last Two NRC Exams Memory/Fundamental Yes No X
Comprehensive/Analysis 10CFR Part 55 Content: 55.41.10 Difficulty: 2.0 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level RO G2.4.19 -Knowledge of EOP layout, symbols, and icons. Tier # 3 Group # 4 K/A # G2.4.19 Rating 3.4 Question 75 When proceeding through Emergency Operating Procedures, a step number preceded by a diamond () , denotes that the step:
A. impacts a Time Critical Operator Action B. appears on the procedure foldout page C. is an Immediate Action D. is a Continuous action Key Proposed Answer: A. impacts a Time Critical Operator Action Explanation:
sw A. Correct. A TCOA step has a diamond by the step number and denotes it impacts the TCOA completion time er B. Incorrect. Foldout page items are not identified in steps of the procedure C. Incorrect. A box around the step number indicates the step is an immediate action.
D. Incorrect. A continuous action is denoted by enclosing the entire step within a box Technical
References:
E-0, AD1.DC12 References to be provided to applicants during exam: None An Learning Objective: Describe the expectations and standards for abnormal procedure use and adherence, including: (41678)
- Performance of immediate actions Question Source: Bank #73 DCPP NRC Exam 03/2012 X (note changes; attach parent) Modified Bank #
62 Question History:
Question Cognitive Level:
New Past NRC Exam Last Two NRC Exams Memory/Fundamental Yes No X
L1 10CFR Part 55 Content:
Difficulty: 2.0 Comprehensive/Analysis 55.41.10 DCPP L162 Exam Rev 1
Examination Outline Cross-Reference Level SRO Tier # 1 EPE 009 G2.1.7 Small Break LOCA: Ability to evaluate Group # 1 plant performance and make operational judgments based K/A # EPE 009 G2.1.7 on operating characteristics, reactor behavior, and Rating 4.7 instrument interpretation.
Question 76 The crew has initiated Safety Injection based on the following:
- RCS leak estimated at 150 gpm
- RM-11, Containment Air Particulate and RM-12, Containment Rad Gas, are in high alarm
- PK11-21, High Radiation, in alarm Hi Rad, has alarmed Ke While performing E-0, Reactor Trip or Safety Injection, the operator reports the following:
- RM-74, Steamline Radiation Monitor, has just pegged high, and PK11-18, Main Steam Line y
- RM-15 and RM-15R, Steam Jet Air Ejector Radiation Monitors, have both lowered from their normal, pre-trip levels
- RM-19/23, Steam Generator Blowdown Radiation Monitors, have remained at pre-trip levels
- All steam generator narrow range levels are approximately 40% and rising slowly mitigate the event?
sw Which of the following procedure flowpaths from E-0, should be taken by the Shift Foreman to er A. Go to E-1, Loss of Reactor or Secondary Coolant, and remain in E-1.
B. Go to E-1, Loss of Reactor or Secondary Coolant, then transition to E-1.2, Post LOCA An Cooldown and Depressurization.
C. Go to E-3, Steam Generator Tube Rupture, then transition to E-3.1, Post SGTR Cooldown Using Backfill.
D. Go to E-3, Steam Generator Tube Rupture, then transition to ECA-3.1, SGTR With Loss of 62 Reactor Coolant-Subcooled Recovery Desired.
Proposed Answer: B. Go to E-1, Loss of Reactor or Secondary Coolant, then transition to E-1.2, Explanation:
Post LOCA Cooldown and Depressurization. QUESION DELETED. SEE EXAM REPORT 2018-301 FOR DETAILS L1A. Incorrect. The leak size is such that E-1.2 will be used to cooldown the RCS and perform the step wise ECCS flow reduction. E-1 is for LOCAs that reduce RCS pressure to less than RHR injection pressure, 300 psig.
B. Correct. Diverse indications of SG activity should convince the operators that RM-74 has failed high. There is no valid indication of activity in any SG. E-0 diagnostic should lead to E-1. With a leak rate of only 150 gpm, the next procedure transition at Step 13 should be E-1.2.
C. Incorrect. There is not a valid indication of a tube rupture. E-0 transition is "valid" alarm.
Plausible, this would be correct if there was a tube rupture and RCS leakage.
D. Incorrect. No valid indication of a tube rupture. Plausible, this is the normal flowpath for a tube rupture.
Technical
References:
E-0, E-1, E-1 background References to be provided to applicants during exam: none DCPP L162 Exam Rev 0
Learning Objective:
Question Source: Bank #DCPP Bank P-91788 X (note changes; attach parent) Modified Bank #
New Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.5 Difficulty: 3.0 Key swer An 62 L1 DCPP L162 Exam Rev 0
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs?
No Ke Yes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- assessment of plant conditions (normal, abnormal, or emergency) and then selection of a procedure or section of a procedure to mitigate or recover, or with which to An proceed (E-0 to E-1 to -E1.2) knowledge of when to implement attachments and appendices, including how to coordinate these items with procedure steps knowledge of diagnostic steps and decision points in the Yes SRO-only question EOPs that involve transitions to event-specific sub-62 procedures or emergency contingency procedures (RCS pressure for small break and what constitutes a small break in E-1) knowledge of administrative procedures that specify L1 hierarchy implementation and/or coordination of plant No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 1 APE 022 G2.4.4 - Loss of Reactor Coolant Makeup: Ability Group # 1 to recognize abnormal indications for system operating K/A # APE022 G2.4.4 parameters that are entry-level conditions for emergency Rating 4.7 and abnormal operating procedures.
Question 77 RCS temperature is 400°F and pressure is 600 psig.
The operator reports the following:
- Pressurizer level is lowering
- Pressurizer backup heaters are OFF
- Charging flow indicates 0 gpm
- Seal injection is 0 gpm to each RCP
- CCP 1-3 amps are approximately 60 amps
- FCV-128, CCP Flow Control Valve, demand indicates 100%
- Letdown is in service at 75 gpm Key
- VCT level is lowering sw The Shift Foreman will go to OP AP-17, Loss of Charging:
A. Section A, Loss of All Charging.
er B. Section B, Charging System Equipment Malfunctions.
C. Section C, Charging Line Leak at Power.
D. Section D, Charging Line Leak on RHR.
Explanation:
An Proposed Answer: C. Section C, Charging Line Leak at Power.
Event is a loss of charging due to a leak. Indications are for a leak - lowering VCT and pressurizer level indicates a leak. Multiple indications for each section, some overlapping, cause the SRO to determine which section will successfully deal with the event in progress.
62 A. Incorrect. While charging flow indication is zero, it is not a loss of charging but a leak which is another procedure section.
B. Incorrect. While FCV-128 indicates full open and flow is 0 gpm, it is not a malfunction of a component, but a leak that has occurred as indicated by lowering VCT and pressurizer L1 level.
C. Correct. Pressurizer and VCT level are lowering due to leak upstream of FCV-128.
D. Incorrect. The plant is in MODE 3, RHR would not in service, but there is a leak.
Technical
References:
OP AP-17 References to be provided to applicants during exam: none Learning Objective: 3478 - Given initial conditions, assumptions, and symptoms, determine the correct abnormal operating procedure to be used to mitigate an operational event Question Source: Bank #
(note changes; attach parent) Modified Bank #82 DCPP NRC Exam 03/2012 X New Past NRC Exam Yes Question History: Last Two NRC Exams No DCPP L162 Exam Rev 0
Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.5 Difficulty: 3.0 Key swer An 62 L1 DCPP L162 Exam Rev 0
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs? No multiple sections available for choice.
No KeYes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- assessment of plant conditions (normal, abnormal, or emergency) and then selection of a procedure or section of a procedure to mitigate or recover, or with which to proceed - yes An knowledge of when to implement attachments and appendices, including how to coordinate these items with procedure steps knowledge of diagnostic steps and decision points in the Yes SRO-only question EOPs that involve transitions to event-specific sub-62 procedures or emergency contingency procedures - yes knowledge of administrative procedures that specify hierarchy, implementation, and/or coordination of plant normal, abnormal, and emergency procedures L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 1 EPE 029 EA2.08 Ability to determine or interpret the Group # 1 following as they apply to a ATWS: Rod bank step K/A # EPE 029 EA2.08 counters and RPI. Rating 3.5 Question 78 GIVEN:
- Unit 1 experienced an RCS leak
- Safety Injection actuated
- In E-0, Reactor Trip or Safety Injection, the reactor failed to automatically or manually trip
- In accordance with FR-S.1, the Work Control Lead has implemented and completed E-0, steps 1 through 4 and steps 1 through 11 of Appendix E
- Reactor Trip Breakers are closed
- All DRPI rod bottom lights are LIT Ke Later, while performing step #9 of FR-S.1, CHECK If Reactor Is Subcritical, the operator reports:
y
- Group Step counters for Control Bank read 110 steps
- Intermediate Range Start Up rate is negative sw What action should be taken by the Shift Foreman?
er A. Stop at the current step of FR-S.1 and go to E-0, step 1.
B. Stop at the current step of FR-S.1 and go to E-0, step 5.
C. Prepare to exit the procedure by going to step 19, Ensure Adequate Shutdown Margin, then go to E-0, step 1.
An D. Prepare to exit the procedure by going to step 19, Ensure Adequate Shutdown Margin, then go to E-0, step 5.
62 Proposed Answer: C. Prepare to exit the procedure by going to step 19, Ensure Adequate Explanation:
Shutdown Margin, then go to E-0, step 1.
A. Incorrect. The reactor is subcritical, however, the procedure is exited at a defined point and L1 then the proper transition is to E-0, step 1 despite having had the steps done while in S.1.
B. Incorrect. The reactor is subcritical, however, the procedure is exited at a defined point and then the proper transition is to E-0, step 1 despite having had the steps done while in S.1.
C. Correct. With the reactor subcritical, the action will be to complete FR-S.1 to a defined exit point and then go to E-0, step 1.
D. Incorrect. While some E-0 steps have been implemented and completed, E-0 still must be addressed and the diagnostic steps performed to ensure the appropriate EOP is transitioned to from E-0.
Technical
References:
FR-S.1 References to be provided to applicants during exam: none Learning Objective: 9703 Identify exit conditions for the FRPs Question Source: Bank #81 South Texas Project 04/2014 X (note changes; attach parent) Modified Bank #
DCPP L162 Exam Rev 1
New Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.5 Difficulty: 2.5 Key swer An 62 L1 DCPP L162 Exam Rev 1
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs?
No Ke Yes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- assessment of plant conditions (normal, abnormal, or emergency) and then selection of a procedure or section of a procedure to mitigate or recover, or with which to proceed An knowledge of when to implement attachments and appendices, including how to coordinate these items with procedure steps knowledge of diagnostic steps and decision points in the Yes SRO-only question EOPs that involve transitions to event-specific sub-62 procedures or emergency contingency procedures (Requires knowing how to recognize the reactor is subcritical and procedural action.)
L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 1 APE 054 G2.1.23 Loss of Main Feedwater: Ability to Group # 1 perform specific system and integrated plant procedures K/A # APE 054 G2.1.23 during all modes of plant operation. Rating 4.4 Question 79 The crew is stabilizing the plant at approximately 50% power following a program ramp from 90% power in accordance with OP AP-15, Loss of Feedwater Flow, due to the trip of a Main Feed pump.
In accordance with OP AP-15, Chemistry is notified of the power change because a sample is required in the next 4 to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to satisfy:
Ke A. SR 3.4.16.1, Verify reactor coolant DOSE EQUIVALENT XE-133 specific activity 600.0 Ci/gm.
y B. SR 3.4.16.2, Verify reactor coolant DOSE EQUIVALENT I-131 specific activity 1.0 Ci/gm.
C. SR 3.7.18.1, Verify the specific activity of the secondary coolant is 0.10 µCi/gm DOSE EQUIVALENT I-131.
sw D. SR 7.4 The Reactor Coolant System chemistry shall be determined to be within the limits by er analysis of those parameters in Table 7.4-1.
Proposed Answer: B. SR 3.4.16.2, Verify reactor coolant DOSE EQUIVALENT I-131 specific activity 1.0 Ci/gm.
Explanation:
An A. Incorrect. Required per SR 3.4.16.1 but not after a power change.
B. Correct. Required per SR 3.4.16.2 - Between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after a THERMAL POWER change of 15% RTP within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period.
C. Incorrect. steam generator specific activity is addressed by SR 3.7.18.1 but not required after a power change.
62 D. Incorrect. Addressed by ECG 7.4, SR 7.4 but not required for power changes (every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />).
Technical
References:
OP AP-15, LCO 3.4.16, 3.7.18, ECG 7.4 References to be provided to applicants during exam: none L1 Learning Objective: 9697D - Apply TS 3.4 Technical Specification LCOs Question Source:
(note changes; attach parent)
Bank #79 DCPP NRC L051 04/2007 Modified Bank #
New X
Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.43.2 Difficulty: 2.5 DCPP L162 Exam Rev 0
Figure 2-1 Screening for SRO-Only Linked to 10 CFR 55.43(b)(2) (Technical Specifications)
Can the question be answered solely by knowing Yes RO question 1-hour TS/TRM Action?
No Can the question be answered solely by knowing the Yes LCO/TRM information listed above the line?
No Key Can the question be answered solely by knowing the Yes TS safety limits?
No swer Does the question involve one or more of the following for the TS, TRM, or ODCM:
An application of required actions (TS Section 3) and SRs (TS Section 4) in accordance with rules of application requirements (TS Section 1) application of generic LCO requirements (LCO 3.0.1 through Yes 3.0.7 and SR 4.0.1 through 4.0.4) 62 knowledge of TS bases that is required to analyze TS-required actions and terminology No SRO-only L1 Question might not be linked to 10 CFR 55.43(b)(2) for SRO-only question ES-401, Page 21 of 52 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 1 APE 058 AA2.03 Ability to determine and interpret the Group # 1 following as they apply to the Loss of DC Power: DC loads K/A # APE 058 AA2.03 lost; impact on ability to operate and monitor plant Rating 3.9 systems.
Question 80 The crews for both units have entered ECA-0.0, Loss of All Vital AC Power.
If the loss of power is determined to last for a MINIMUM of ___1)_______, then the crews should ____2)_______ FSG 04, DC Bus Load Shed and Management to extend the availability of the vital batteries.
A. 1) one hour B. 1) one hour C. 1) two hours
- 2) REFER TO
- 2) IMPLEMENT
- 2) REFER TO Key D. 1) two hours 2) IMPLEMENT Explanation:
NOTE:
sw Proposed Answer: B. 1) one hour 2) IMPLEMENT er REFER TO: The designated procedure may be used for guidance at the Operator's discretion.
IMPLEMENT: Perform the second procedure in parallel with the procedure in effect Use of the FSG is SRO knowledge, per the FSG "With careful evaluation, directed by the An SM/SEC, this guideline can be modified to suit the plant conditions existing at the time of its use. Additionally, whether the procedure is performed or implemented is not required RO knowledge (that there is a procedure to address DC load shed, would be RO knowledge, not the type of adherence required). The knowledge of how quickly to implement FSG 04 will aid the operating crew in the ability to operate and monitor the minimum key systems and indications 62 associated with DC on a loss of all power event..
A. Incorrect. An ELAP is a loss of power for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The FSGs are implemented from ECA-0.0.
B. Correct. The FSG is IMPLEMENTED if power is lost for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
L1C. Incorrect. The procedure is implemented after 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> is plausible as this is the design basis for the batteries.
D. Incorrect. The procedure is implemented, 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> is plausible as this is the design basis for the batteries.
Technical
References:
ECA-0.0, FSG 04, OP1.DC10 References to be provided to applicants during exam: none Learning Objective: Explain the basis for securing DC loads on loss of vital AC bus. (7118)
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No DCPP L162 Exam Rev 1
Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.43.5 Difficulty: 2.0 Key swer An 62 L1 DCPP L162 Exam Rev 1
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs?
No KeYes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- assessment of plant conditions (normal, abnormal, or emergency) and then selection of a procedure or section of a procedure to mitigate or recover, or with which to proceed An knowledge of when to implement attachments and appendices, including how to coordinate these items with procedure steps knowledge of diagnostic steps and decision points in the Yes SRO-only question EOPs that involve transitions to event-specific sub-62 procedures or emergency contingency procedures knowledge of administrative procedures that specify hierarchy, implementation, and/or coordination of plant normal, abnormal, and emergency procedures L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 1 APE 077 AA2.05 Ability to determine and interpret the Group # 1 following as they apply to Generator Voltage and Electric K/A # APE 077 AA2.05 Grid Disturbances: Operational status of offsite circuit. Rating 3.8 Question 81 GIVEN:
- Both units are at 100% power
- An earthquake causes a grid disturbance
- Grid Control reports:
o loss of the Morro Bay-Diablo Canyon 230 kV line o loss of the Diablo Canyon-Gates 500 kV line o 500 kV voltage is unchanged o 230 kV voltage is 232 kV o Los Padres Area Load is 420 MW o DCPP has 2 capacitors IN o Mesa transformer is in service Key o Mesa has 2 capacitors that are available and IN
- Auto start of all standby Condensate/Booster Pump Sets is blocked sw What is the operational status of the 230 kV and 500 kV offsite power sources?
er A. Both the 230 kV and 500 kV offsite power sources remain OPERABLE.
B. The 230 kV source remains OPERABLE, the 500 kV source is inoperable.
C. The 230 kV source is inoperable, the 500 kV source remains OPERABLE.
An D. Both the 230 kV and 500 kV offsite power sources are inoperable.
Proposed Answer: C. The 230 kV source is inoperable, the 500 kV source remains OPERABLE.
Explanation:
62 The SFM is responsible for Tech Spec entries due to inoperable electrical sources or equipment.
If there is a question of operability, SR 3.8.1.1 is performed by completing section 17 of STP I-1C and OP J-2:VIII.
Working thru the attachments of OP J-2:VIII:
L1 For DCPP/Mesa configuration, table 1, 2 DCPP caps - 2 and 2 caps for Mesa is line 2-3.
Minimum DCPP normal transfer limits - voltage 230 kV , load 400 MW. For Level C, 229 and 415 respectively Per attachment 2 (left to right) - YES for first block (230 required but currently 232), NO for next block (Normal transfer load limit is 400 and currently at 420 MW). Configuration (at power) 3 for next block, Comp actions 1 or 3 complete - YES (Cond Booster pumps auto start blocked), YES for next block (Level C voltage greater than 229), Load less than Level C - NO, load is 420, max is 415 mw. Startup is inoperable.
A. Incorrect. There are two 230 kV lines and three 500 kV lines. According to the bases for LCO 3.8.1, the sources are OPERABLE if one 230 kV (with conditions) and two 500 kV lines satisfy the LCO. A loss of one line of each does not affect operability providing DCPP L162 Exam Rev 1
voltage and load for the existing 230 kV lineup is acceptable. For the current lineup, the minimum voltage is 229 kV. Working thru the attachments, show that this is the minimum even if comp measures are in place. NOTE: The 12 kV cutouts would need to be taken to cutout, the condensate booster pump cutouts are cutout at power. For the current conditions, voltage is too low, the 230 kV is inoperable. 500 kV voltage has not changed and because a loss of a single line does not make the system inoperable, the 500 kV system remains OPERABLE.
B. Incorrect. A single line loss does not make the 500 kV inoperable as long as voltage is acceptable, if its unchanged from the initial conditions, then the 500 kV is still OPERABLE. Plausible because loss of one line would seem likely to cause at least one offsite source inoperable. Additionally, using J-2:VIII, 230 kV is inoperable.
C. Correct. A single line loss does not make 500 kV inoperable. Additionally, for the current configuration, 230 kV is inoperable. See explanation above.
Technical
References:
LCO 3.8.1, OIM J-1-1 and OP J-2:VIII Ke D. Incorrect. A single line loss does not make 500 kV inoperable. Plausible because 230 kV is inoperable and loss of a line would seem plausible to be inoperable.
y References to be provided to applicants during exam: OP J-2:VIII att 1, 2 and 49 and 66 (page 37 and 54 of 64 of attachment 3)
Learning Objective: 9697H Apply TS 3.8 Technical Specification LCOs Question Source: Bank #
(note changes; attach parent) Modified Bank #
Question History:
Question Cognitive Level:
swer New Past NRC Exam Last Two NRC Exams Memory/Fundamental X
No No Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.2 Difficulty: 3.5 An 62 L1 DCPP L162 Exam Rev 1
SRO Justification:
ES-401 5 Attachment 2 Can the question be answered solely by knowing Yes 1-hour TS/TRM Action?
No RO question Can the question be answered solely by knowing Yes the LCO/TRM information listed above the line?
No Key RO question Can the question be answered solely by knowing Yes the TS safety limits?
No swer RO question Does the question involve one or more of the following for the TS, TRM, or ODCM:
An application of required actions (TS Section 3) and SRs (TS Section 4) in accordance with rules of application requirements (TS Section 1)
Yes
- application of generic LCO requirements (LCO 3.0.1 SRO-62 through 3.0.7 and SR 4.0.1 through 4.0.4) knowledge of TS bases that is required to analyze TS-required actions and only question L1 terminology No Question might not be linked to 10 CFR 55.43(b)(2) for SRO l ES-401, Page 21 of 52 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 1 APE033 AA2.04 Ability to determine and interpret the Group # 2 following as they apply to the Loss of Intermediate Range K/A # APE 033 AA2.04 Nuclear Instrumentation: Satisfactory overlap between Rating 3.2 source-range, intermediate-range and power-range instrumentation.
Question 82 A plant shutdown is in progress. Reactor power is 25%.
A loss of compensating voltage to Intermediate Range channel N36 occurs.
- 1) During the shutdown, P6, Intermediate Range Permissive _______ automatically energize the Source Range channels channel _________________.
A. 1) will Ke
- 2) The Shift Foreman is required to enter a Technical Specification LCO for the inoperable N36 y
- 2) immediately B. 1) will C. 1) will NOT
- 2) immediately sw
- 2) when reactor power is less than 10%
er D. 1) will NOT
- 2) when reactor power is less than 10%
Proposed Answer: D.
1) 2)
will NOT An when reactor power is less than 10%
Explanation:
Candidate must know that due to the loss of compensating voltage, the channel will not lower 62 sufficiently to provide the necessary overlap and cause P6 to automatically energize the Source Range (requires two IR channels less than 10-10 amps. Also, from LCO 3.3.1 that the action is to either lower power to less than P-6 or raise power to greater than 10% with one channel inoperable. Coming down, the LCO will not be entered until power is less than 10&% (SRO).
L1A. Incorrect. For many instrument failures, the LCO immediately applies, such as for a failed Power Range channel. Also, the necessary overlap to energize the Source Range would be met if the N36 channel was over compensated (it would read lower and get to the setpoint sooner).
B. Incorrect. The effect of undercompensation is to make the channel read higher, preventing auto energizing of the source range channels. Second part is correct..
C. Incorrect. First part is correct, Second part plausible, for many instrument failures, a shutdown is required, however the LCO for IR channels apply when less than 10%
D. Correct. P6 will not energize the source range channels and the LCO does not apply until less than 10% power.
Technical
References:
LCO 3.3.1 ACTION F, OIM B-4-3a References to be provided to applicants during exam: none Learning Objective:
DCPP L162 Exam Rev 1
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.2 Difficulty: 3.0 Key swer An 62 L1 DCPP L162 Exam Rev 1
SRO Justification:
ES-401 5 Attachment 2 Figure 2-1 Screening for SRO-Only Linked to 10 CFR 55.43(b)(2) (Technical Specifications)
Can the question be answered solely by knowing Yes 1-hour TS/TRM Action? RO question No Can the question be answered solely by knowing the LCO/TRM information listed above the line?
Ke Yes y RO question No the TS safety limits?
sw Can the question be answered solely by knowing er Yes RO question No Does the question involve one or more of the An following for the TS, TRM, or ODCM:
- application of required actions (TS Section 3) and SRs (TS Section 4) in accordance with rules of application requirements (TS Section 1)
Yes 62
- application of generic LCO requirements (LCO 3.0.1 through 3.0.7 and SR 4.0.1 through 4.0.4) knowledge of TS bases that is required SRO-only questi L1 No Question might not be linked to 10 CFR 55.43(b)(2) for SRO l ES-401, Page 21 of 52 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 1 APE 036 AA2.03 Ability to determine and interpret the Group # 2 following as they apply to the Fuel Handling Incidents: K/A # APE036 AA2.03 Magnitude of potential radioactive release. Rating 4.2 Question 83 Per the bases for LCO 3.9.7, Refueling Cavity Water Level, offsite doses for a fuel handling accident inside containment are maintained well within allowable limits due to which of the following?
A minimum water level of 23 feet above the:
Ke A. top of a fuel assembly being moved and and one loop of RHR in service to maintain RCS temperature less than 200°F.
y B. top of a fuel assembly being moved and a minimum decay time of 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to fuel handling.
C. reactor vessel flange and one loop of RHR in service to maintain RCS temperature less than 200°F.
sw D. reactor vessel flange and a minimum decay time of 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to fuel handling.
er Proposed Answer: D. reactor vessel flange and a minimum decay time of 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to fuel handling.
Explanation:
An A. Incorrect. Plausible - There is a requirement for the SFP for water level that maintains at least 8 feet above the top of the fuel for shielding (not fuel accident). The bases for the RHR in service LCO states the reason is that if the reactor coolant temperature is not maintained below 200°F, boiling of the reactor coolant could result. This could lead to a loss of coolant in the reactor vessel. Additionally, boiling of the reactor coolant could lead to boron plating out on components near the areas of the boiling activity.The loss of reactor 62 coolant and the reduction of boron concentration in the reactor coolant would eventually challenge the integrity of the fuel cladding, which is a fission product barrier. One train of the RHR System is required to be operational in MODE 6, with the water level 23 ft above the top of the reactor vessel flange, to prevent this challenge.
L1B. Incorrect. The requirement is water over the reactor vessel flange, not the top of the fuel, the decay time of 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> is correct.
C. Incorrect. The level is correct. The RHR in service is to prevent boiling (which could reduce level).
D. Correct. Per the bases for LCO 3.9.7, with a minimum water level of 23 ft and a minimum decay time of 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to fuel handling, the analysis and test programs demonstrate that the iodine release due to a postulated fuel handling accident is adequately captured by the water and offsite doses are maintained well within allowable limits.
Technical
References:
LCO Bases for 3.9.5, 3.9.7 and 3.7.15 References to be provided to applicants during exam: none Learning Objective: 9694I - Apply TS 3.9 Technical Specification bases Question Source: Bank #
DCPP L162 Exam Rev 0
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.43.2 Difficulty: 3.0 Key swer An 62 L1 DCPP L162 Exam Rev 0
SRO Justification:
ES-401 5 Attachment 2 Figure 2-1 Screening for SRO-Only Linked to 10 CFR 55.43(b)(2) (Technical Specifications)
Can the question be answered solely by knowing Yes RO question 1-hour TS/TRM Action?
No Can the question be answered solely by knowing the LCO/TRM information listed above the line?
Key Yes RO question No the TS safety limits?
swer Can the question be answered solely by knowing Yes RO question No Does the question involve one or more of the following An for the TS, TRM, or ODCM:
application of required actions (TS Section 3) and SRs (TS Section 4) in accordance with rules of application requirements (TS Section 1)
Yes 62
- application of generic LCO requirements (LCO 3.0.1 through 3.0.7 and SR 4.0.1 through 4.0.4) knowledge of TS bases that is required to SRO-only question L1 analyze TS-required actions and terminology (bases for LCO 3.9.7)
Question might not be linked to 10 CFR 55.43(b)(2) for SRO l ES-401, Page 21 of 52 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 1 APE 037 G2.2.22 Steam Generator Tube Leakage: Group # 2 Knowledge of limiting conditions for operations and safety K/A # APE037 G2.2.22 limits. Rating 4.2 Question 84 Unit 1 is at 100% power.
Chemistry reports that the latest sample indicates a primary to secondary leak rate of approximately 200 gpd from the 11 Steam Generator.
- 1) Per OP O-4, Primary to Secondary Steam Generator Tube Leak Detection, once the crew commences a plant shutdown, the unit must be less than 50% in ________.
A. 1) one hour 2) six hours Ke
- 2) Per LCO 3.4.13, RCS Operational Leakage, the unit must be in MODE 3 in no more than y
B. 1) one hour 2) ten hours C. 1) three hours D. 1) three hours
- 2) six hours
- 2) ten hours swer Proposed Answer: A. 1) one hour 2) six hours Explanation:
A. Correct. Per O-4, once the downpower is started, the unit must be less than 50% in one hour. The time to reach MODE 3 is 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
An B. Incorrect. Time to less than 50% is correct, however, the time to reach MODE 3 is 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> is plausible because if its considered operational leakage, then there are 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to "reduce leakage" and then 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to MODE 3.
C. Incorrect. Time is incorrect, it is one hour, not three (half of the time to MODE3). The LCO of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is correct.
62 D. Incorrect. Time is incorrect, it is one hour, not three (half of the time to MODE3). The LCO of 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> is correct.
Technical
References:
LCO 3.4.13, O-4 References to be provided to applicants during exam: none L1 Learning Objective: 9697D Apply TS 3.4 Technical Specification LCOs.
Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New Past NRC Exam X
No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.43.2 Difficulty: 2.0 DCPP L162 Exam Rev 0
SRO Justification:
ES-401 5 Attachment 2 Figure 2-1 Screening for SRO-Only Linked to 10 CFR 55.43(b)(2) (Technical Specifications)
Can the question be answered solely by knowing Yes RO question 1-hour TS/TRM Action?
No Can the question be answered solely by knowing the LCO/TRM information listed above the line?
Key Yes RO question No the TS safety limits?
swer Can the question be answered solely by knowing Yes RO question No An Does the question involve one or more of the following for the TS, TRM, or ODCM:
- application of required actions (TS Section 3) and SRs (TS Section 4) in accordance with rules of application requirements (TS Section 1) 62
- application of generic LCO requirements (LCO 3.0.1 through 3.0.7 and SR 4.0.1 through 4.0.4) knowledge of TS bases that is required to analyze TS-required actions and terminology Yes SRO-only question L1 No Question might not be linked to 10 CFR 55.43(b)(2) for SRO l ES-401, Page 21 of 52 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 1 E16 G2.4.2 - Containment Radiation; Knowledge of system Group # 2 set points, interlocks and automatic actions associated with K/A # E16 G2.4.2 EOP entry conditions. Rating 4.6 Question 85 The STA is monitoring Critical Safety Function Status trees.
If Containment Radiation monitors ______1)_________ exceed 12 R/HR, the crew
______2)___________ EOP FR-Z.3, Response To High Containment Radiation Level.
- RM Containment Air Particulate
- RM Containment Rad Gas
- RM-30, 31 - Containment High Range A. 1) RM-11, RM-12 B. 1) RM-11, RM-12
- 2) must GO TO
- 2) may elect to GO TO Key C. 1) RM-30, RM-31 2) must GO TO D. 1) RM-30, RM-31 Proposed Answer: D. 1) RM-30, RM-31 Explanation:
sw
- 2) may elect to GO TO er 2) may elect to GO TO.
FR-Z.3 is a yellow path procedure, not RO knowledge, and the SRO must apply the rules of usage for FRGs to determine how the procedure is performed.
A. Incorrect. RM-11 and RM12 are containment rad monitors but RM-30 and 31 are the rad An monitors used. Transition is required for a RED or MAGENTA challenge..
B. Incorrect.RM-11 and RM12 are containment rad monitors but RM-30 and 31 are the rad monitors used. The status tree is YELLOW and as such, it is performed at the operator's option and may be exited at any time.
C. Incorrect. The rad monitors are RM-30 and 31 however, Z.3 is a yellow path, but unlike red or magenta challenges, performance is not mandatory.
62 D. Correct. High radiation on RM-30 and 31 represents a "not satisfied" or yellow challenge to containment integrity. Because it is not a extreme or severe challenge, it is performed at the option of the operator (SFM) and may be exited at any point.
Technical
References:
F-0 L1 References to be provided to applicants during exam: none Learning Objective: 7988 Describe when procedure transitions are made while using the EOP set Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.5 Difficulty: 2.0 DCPP L162 Exam Rev 1
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs? Yellow paths are not major EOPs No Ke Yes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- assessment of plant conditions (normal, abnormal, or emergency) and then selection of a procedure or section of a procedure to mitigate or recover, or with An which to proceed knowledge of administrative procedures that specify hierarchy, implementation, and/or coordination of plant normal, abnormal, and emergency procedures Yes SRO-only question 62 L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 2 004 A2.26 Ability to (a) predict the impacts of the following Group # 1 malfunctions or operations on the CVCS; and (b) based on K/A # 004 A2.26 those predictions, use procedures to correct, control, or Rating 3.0 mitigate the consequences of those malfunctions or operations: Low VCT pressure.
Question 86 GIVEN:
- VCT level is 10% and lowering rapidly
- VCT pressure lowers rapidly to 0 psig
- Letdown flow is 75 gpm
- PK11-25, PLANT VENT RADIATION, is in alarm
- PK11-21, HIGH RADIATION, is in alarm Key
- 1) The Shift Foreman should enter ___________ to address the leak.
- 2) Per EP RB-2, DCPP Emergency Exposure Guidelines, if Emergency Exposure authorization is required to isolate the leak and the TSC and EOF are not activated, it should be approved by the _______________________.
A. 1) OP AP-14, Tank Ruptures B. 1) OP AP-14, Tank Ruptures swer
- 2) Shift Manager
- 2) Emergency Director C. 1) OP AP-17, Loss of Charging 2) Shift Manager D. 1) OP AP-17, Loss of Charging 2) Emergency Director Explanation:
An Proposed Answer: A. 1) OP AP-14, Tank Ruptures 2) Shift Manager A. Correct. Low VCT pressure and level are indicative of a VCT rupture. The procedure to address it is OP AP-14. In AP-14, step 4 is to implement radiological emergency 62 procedures. First bullet is RB-2. RB-2 states the SM or the SEC or ED approves emergency exposures.
B. Incorrect. The procedure is AP-14, however, the SM approves emergency exposures prior to EOF/TSC activation. Plausible as the ED is in charge once the EOF is activated.
L1 C. Incorrect. PK11-21 could be in alarm for either loss of charging or tank rupture. Also, VCT level would lower for a large charging line leak (but pressure would not fall to 0 psig). The SEC approves emergency exposure.
D. Incorrect. The appropriate procedure is AP-14 not AP-17 and the SM approves emergency exposures.
Technical
References:
AR PK11-21, AR PK11-25, OP AP-14, AP-17, RB-2 References to be provided to applicants during exam: none Learning Objective: 3477P Given an abnormal condition, summarize the major actions of OP AP-14 to mitigate an event in progress.
9848 - State who may authorize emergency doses Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X DCPP L162 Exam Rev 1
Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.4 Difficulty: 3.0 Key swer An 62 L1 DCPP L162 Exam Rev 1
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs?
No KeYes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- assessment of plant conditions (normal, abnormal, or emergency) and then selection of a procedure or section of a procedure to mitigate or recover, or with which to An proceed (AP-14) knowledge of administrative procedures that specify hierarchy, implementation, and/or coordination of plant normal, abnormal, and emergency procedures (RB-2) Yes SRO-only question 62 L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 2 007 A2.04 Ability to (a) predict the impacts of the following Group # 1 malfunctions or operations on the PTRS; and (b) based on K/A # 007 A2.04 those predictions, use procedures to correct, control, or Rating 2.9 mitigate the consequences of those malfunctions or operations: Overpressurization of the waste gas vent header.
Question 87 GIVEN:
- Unit 1 is at 100% power
- PK05-20, PZR Relief/Safety Valve Open - ON
- PK05-23, PZR Safety or Relief Line Temp - ON
- Sonic Flow indication is 0.001
- PRT pressure is 15 psig and rising
- Pressurizer pressure dropped rapidly Key The Shift Foreman is addressing PK05-20.
In accordance with AR PK05-20, the Shift Foreman should enter ________. Additionally,
_______, if open, will close.
swer A. AP-1, Excessive Reactor Coolant System Leakage; RCS-8034A/B, Gas Analyzer valves B. AP-1, Excessive Reactor Coolant System Leakage; PCV-472, PRT Vent Header Pressure Control valve C. AP-13, Malfunction of Reactor Pressure Control; RCS-8034A/B, Gas Analyzer valves Control valve An D. AP-13, Malfunction of Reactor Pressure Control; PCV-472, PRT Vent Header Pressure Proposed Answer: D. AP-13, Malfunction of Reactor Pressure Control; PCV-472, PRT Vent Header Pressure Control valve 62 Explanation:
The SRO will evaluate the plant conditions and determine which of the two abnormal procedures adequately address the plant conditions. AP-1 would eventually address the open PORV/Safety however, AP-13 will address the problem immediately (and is specified in the PK)
L1A. Incorrect. While RCS is leaking, it is due to an open PORV/Safety (no sonic flow). The 8034 valves do have an auto close, but its phase A, not high PRT pressure.
B. Incorrect. While RCS is leaking, it is due to an open PORV/Safety. The PK directs the operator to OP AP-13. At 10 psig of PRT pressure, PCV-472 valve closes isolating the PRT from the vent gas header.
C. Incorrect. The procedure to be entered is AP-13. The 8034 valves do have an auto close, but its phase A, not high PRT pressure.
D. Correct. While RCS is leaking, it is due to an open PORV/Safety. The PK directs the operator to OP AP-13. At 10 psig of PRT pressure, PCV-472 valve closes isolating the PRT from the vent gas header.
Technical
References:
AP-1, AP-13, AR PK05-20, AR PK05-23 References to be provided to applicants during exam: none DCPP L162 Exam Rev 0
Learning Objective: 3478 - Given initial conditions, assumptions, and symptoms, determine the correct abnormal operating procedure to be used to mitigate an operational event Question Source: Bank #88 DCPP NRC 11/2012 X (note changes; attach parent) Modified Bank #
New Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.5 Difficulty: 3.5 Key swer An 62 L1 DCPP L162 Exam Rev 0
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs?
No Ke Yes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- assessment of plant conditions (normal, abnormal, or emergency) and then selection of a procedure or section of a procedure to mitigate or recover, or with which to An proceed (AP-1 vs AP-13)
Yes SRO-only question 62 L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 2 022 G2.4.41 - Containment cooling: Knowledge of the Group # 1 emergency action level thresholds and classifications. K/A # 022 G2.4.41 Rating 4.6 Question 88 According to the EAL, Table F-1, Fission Product Barrier Matrix, which of the following is the minimum depressurization equipment required to prevent a potential loss of the Containment barrier?
Containment Spray Pump(s) CFCU(s)
A.
B.
C.
1 1
2 2
1 2
Key D. 2 1 Proposed Answer: A. 1 2 Explanation:
swer During an accident, the containment is cooled and depressurized by using containment spray and CFCUs.
A. Correct. According to a note on Table 1, one containment spray pump and two CFCUs constitute a train of depressurization equipment and is the MINIMUM required.
An B. Incorrect. Only one containment spray pump is required. However, 2 CFCUs are required.
Plausible - EAL may require less to make a classification.
C. Incorrect. Only one CS pump is required. This is more than the minimum required.
Plausible because less than 2 requires LCO entry. The number of CFCUs required is 2.
D. Incorrect. This is more containment spray pumps than what is required.Number of CFCUs is less than required.
62 Technical
References:
EAL Fission Barrier Table, E-Plan Appendix D Bases, LCO 3.6.6 References to be provided to applicants during exam: none Learning Objective: Given an emergency classification or approval of a protective action L1 recommendation (PAR), use EP G-3 to complete a DCPP Emergency Notification Form with 100% accuracy within 15 minutes. (42288)
Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.43.1 Difficulty: 2.5 DCPP L162 Exam Rev 1
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs?
No Ke Yes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- knowledge of administrative procedures that specify hierarchy, implementation, and/or coordination of plant normal, abnormal, and emergency procedures An (knowledge of EAL threshold for potential loss of containment barrier)
Yes SRO-only question 62 L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 2 073 G2.1.32 Process Radiation Monitoring: Ability to Group # 2 explain and apply system limits and precautions. K/A # 073 G2.1.32 Rating 4.0 Question 89 What is the reason for limiting the open time of the containment purge valves to no more than 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> for the year?
A. To prevent exceeding the NPDES permit.
B. To prevent valve erosion and subsequent excessive leakage past the valves when they are closed.
offsite boundary doses.
Ke C. To minimize the probability of a LOCA occurring while the valves are open, limiting the y
D. To minimize the probability the valves will not fully close when the purge is secured, resulting in a breach of Containment integrity.
Explanation:
sw Proposed Answer: C. To minimize the probability of a LOCA occurring while the valves are open, limiting the offsite boundary doses.
er A. Incorrect. The NPDES covers releases to the environment, but releases to the ocean, not from Containment.
B. Incorrect. These butterfly valves are not fully open (limited to 50 degrees of travel), so its plausible that there is concern of wear.
An C. Correct .Containment purges rely on RM-44A and 44B to be OPERABLE. These are process rad monitors. Their operation is assumed to close the purge valves that are opened.
Per ECG 23.3, The purging time restriction is meant to minimize the probability of a LOCA while conducting purging operations and thereby limit offsite boundary doses.
D. Incorrect. The valves are limited in travel because these valves have not been qualified to close under accident conditions. Knowing that there is a concern with closing makes this 62 distractor plausible.
Technical
References:
CAP A-6A, ECG 23.3.
References to be provided to applicants during exam: none Learning Objective: 7428 - State gaseous radwaste system administrative controls L1 Question Source:
(note changes; attach parent)
Bank #91 DCPP NRC 10/2016 Modified Bank #
New Past NRC Exam X
Yes Question History: Last Two NRC Exams Yes Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.43.2 Difficulty: 3.0 DCPP L162 Exam Rev 0
SRO Justification:
ES-401 5 Attachment 2 Figure 2-1 Screening for SRO-Only Linked to 10 CFR 55.43(b)(2) (Technical Specifications)
Can the question be answered solely by knowing Yes RO question 1-hour TS/TRM Action?
No Can the question be answered solely by knowing the LCO/TRM information listed above the line?
Key Yes RO question No the TS safety limits?
swer Can the question be answered solely by knowing Yes RO question No An Does the question involve one or more of the following for the TS, TRM, or ODCM:
- knowledge of TS bases that is required to analyze TS-required actions and terminology 62 (ECG 23.3 and bases) Yes SRO-only question L1 No Question might not be linked to 10 CFR 55.43(b)(2) for SRO l ES-401, Page 21 of 52 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 2 076 G2.2.25 Service Water - Knowledge of the bases in Group # 1 Technical Specifications for limiting conditions for K/A # 076 G2.2.25 operations and safety limits. Rating 4.2 Question 90 According to the bases for LCO 3.7.8, Auxiliary Saltwater (ASW) System, a train of ASW requires ___1)______ vacuum relief valve(s) to be OPERABLE. The pump vault drain check valve ____2)_____ required for the train to be OPERABLE.
A. 1) at least one 2) is NOT B. 1) both 2) is NOT C. 1) at least one D. 1) both
- 2) is
- 2) is Key Proposed Answer: C. 1) at least one 2) is Explanation:
sw An ASW train is considered OPERABLE during MODES 1, 2, 3, and 4 when:
- a. The pump is OPERABLE; and
- b. The associated piping, valves, heat exchanger, and er instrumentation and controls required to perform the PG&E Design Class I function are OPERABLE. This requires that at least one vacuum relief valve be OPERABLE
- c. The associated pump vault drain check valve is OPERABLE. The ASW pump vault check valves prevent flooding of the ASW pump vaults during design flood events.
A. Incorrect. First part is correct, failure of only one relief valve does not make the train An inoperable. Failure of the vault pump check valve makes the train inoperable. Plausible if the candidate knows the relief valves are required and believes that both are required (like both ASW pumps are required for the LCO to be satisfied) and that a room (vault) pump valve is not required.
B. Incorrect. At least one is required, both is more than what is required. Plausible if the bases 62 is not known and its felt a pump vault check valve is not covered by Tech Specs.
C. Correct. Only ONE is required and the check valve is also required per the bases.
D. Incorrect. ONLY ONE is required. Plausible if the candidate knows the relief valves are required and believes that both are required (like both ASW pumps are required for the L1 LCO to be satisfied). Second part is correct, the check valve is also required.
Technical
References:
B 3.7.8 References to be provided to applicants during exam: none Learning Objective: 9694G Apply TS 3.7 Technical Specification bases Question Source: Bank #90 DCPP NRC Exam 03/2012 X (note changes; attach parent) Modified Bank #
New Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.43.2 Difficulty: 3.0 DCPP L162 Exam Rev 0
SRO Justification:
ES-401 5 Attachment 2 Figure 2-1 Screening for SRO-Only Linked to 10 CFR 55.43(b)(2) (Technical Specifications)
Can the question be answered solely by knowing Yes 1-hour TS/TRM Action? RO question No Can the question be answered solely by knowing the LCO/TRM information listed above the line?
No Ke Yes y RO question the TS safety limits?
No sw Can the question be answered solely by knowing er Yes RO question Does the question involve one or more of the following An for the TS, TRM, or ODCM:
knowledge of TS bases that is required (B3.7.8)
Yes 62 SRO-only question L1 No Question might not be linked to 10 CFR 55.43(b)(2) for SRO l ES-401, Page 21 of 52 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 2 016 A2.01 Ability to (a) predict the impacts of the following Group # 2 malfunctions or operations on the NNIS; and (b) based on K/A # 016 A2.01 those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or Rating 3.1 operations: Detector failure.
Question 91 GIVEN:
- Unit 1 is at 100% power
- Tave is 572ºF
- Pressurizer level channels:
- LT-459 indicates 60%
- LT-460 indicates 51%
- LT-461 indicates 56%
- Pressurizer pressure channels
- PT-455 indicates 2235 psig Key
- PT-456 indicates 2180 psig
- PT-457 indicates 2215 psig sw
- RM-3, Oily Water Separator Detector, analog meter needle is on the low limit peg and motionless er Based on these indications, the Shift Foreman should declare _____________________
- 1. A pressurizer level channel
- 2. A pressurizer pressure channel
- 3. RM-3 A. 1 ONLY An B. 1 and 3 62 C. 2 ONLY D. 2 and 3 L1 Proposed Answer: B. 1 and 3 Explanation:
NOTE: CHANNEL CHECKS are required to satisfy the following surveillance requirements RM ECG 39.3,SR 39.3.1 Pressurizer level and pressure - LCO 3.3.1, SR 3.3.1.1 A. Incorrect. Pressurizer level is greater than the allowable variance of 8.5%. Pressure is within tolerance, however, RM-3 is inoperable.
B. Correct. level is outside of tolerance (greater than 8.5%) and RM-3 is inoperable (needle should have a slight oscillation).
C. Incorrect. Although there is a noticeable difference in pressure channels, they are within 5% (62.5 psig).
D. Incorrect. Pressure channels are operable, RM-3 is not.
DCPP L162 Exam Rev 0
Technical
References:
Ops policy B-5, LCO 3.3.1, ECG 39.3 References to be provided to applicants during exam: none Learning Objective:
Question Source: Bank #
(note changes; attach parent) Modified Bank #95 DCPP L111 NRC 11/2012 New Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.2 Difficulty: 3.0 Key swer An 62 L1 DCPP L162 Exam Rev 0
SRO Justification:
ES-401 5 Attachment 2 Figure 2-1 Screening for SRO-Only Linked to 10 CFR 55.43(b)(2) (Technical Specifications)
Can the question be answered solely by knowing Yes RO question 1-hour TS/TRM Action?
No Can the question be answered solely by knowing the LCO/TRM information listed above the line?
Key Yes RO question No the TS safety limits?
swer Can the question be answered solely by knowing Yes RO question No An Does the question involve one or more of the following for the TS, TRM, or ODCM:
- application of required actions (TS Section 3) and SRs (TS Section 4) in accordance with rules of 62
- application requirements (TS Section 1) (3.3.1, ECG and LCO 3.3.1 ) Yes SRO-only question L1 No Question might not be linked to 10 CFR 55.43(b)(2) for SRO l ES-401, Page 21 of 52 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 2 035 A2.05 Ability to (a) predict the impacts of the following Group # 2 malfunctions or operations on the S/G; and (b) based on K/A # 035 A2.05 those predictions, use procedures to correct, control, or Rating 3.4 mitigate the consequences of those malfunctions or operations: Unbalanced flows to the S/Gs.
Question 92 GIVEN:
- A natural circulation cooldown is in progress on Unit 2 at 35°F/hour in accordance with EOP E-0.2, Natural Circulation Cooldown
- Pressurizer level is 35% and stable
- RVLIS is 100%
- Steam Generator 21 cannot be fed or steamed
- T in all RCS loops is 25°F Key RCS loop 21 T has lowered to 10°F and Thot has stabilized over the last 20 minutes.
B. 1) stagnant sw
- 2) The Shift Foreman will direct the crew to __________________.
A. 1) stagnant 2) raise the cooldown rate er
- 2) lower the cooldown rate C. 1) voided 2) raise the cooldown rate D. 1) voided An
- 2) lower the cooldown rate Proposed Answer: B. 1) stagnant 2) lower the cooldown rate Explanation:
62 A. Incorrect. The consequence is correct. However, the cooldown rate needs to be lowered.
Plausible because it could be that its believed increasing the cooldown will lower Tcold, which could lower the loop 21 Tcold, possibly restarting cooling in the loop.
B. Correct. Step 10 defines an inactive loop, is a loop that cannot be fed or steamed. Step 11 states that if hot legs in the inactive loop are not lowering at the same rate of the other L1 loops, it is stagnant. If its stagnant (Thot stable) then the RNO states to lower the cooldown rate (by a factor of 2).
C. Incorrect. Voids is plausible as this is also monitored during E-0.2 and is a potential consequence of too high a cooldown rate. Cooldown rate is lowered not raised.
D. Incorrect. Voids is plausible as this is also monitored during E-0.2 and is a potential consequence of too high a cooldown rate. Action to lower cooldown rate is correct.
Technical
References:
E-0.2 step 10 and 11and background References to be provided to applicants during exam: None Learning Objective:Explain the operator actions that can initiate or enhance natural circulation.
(8905)
Explain the basis for emergency procedure steps. (7920C)
Question Source: Bank #
DCPP L162 Exam Rev 1
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.5 Difficulty: 3.0 Key swer An 62 L1 DCPP L162 Exam Rev 1
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
No RO question Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters KeyYes RO question that require direct entry into major EOPs?
No sw Can the question be answered solely by knowing the purpose, overall sequence of events, or overall mitigative strategy of a procedure?
No er Yes RO question Does the question require one or more of the following:
- assessment of plant conditions (normal, abnormal, or An emergency) and then selection of a procedure or section of a procedure to mitigate or recover, or with which to proceed (determine the action for inactive loop) knowledge of when to implement attachments and appendices, including how to coordinate these items with Yes SRO-only procedure steps 62
- knowledge of diagnostic steps and decision points in the EOPs question L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 2 068 A2.04 Ability to (a) predict the impacts of the following Group # 2 malfunctions or operations on the Liquid Radwaste K/A # 068 A2.04 System; and (b) based on those predictions, use procedures Rating 3.3 to correct, control, or mitigate the consequences of those malfunctions or operations: Failure of automatic isolation Question 93 GIVEN:
- Unit 1 is at 100% power
- A High Radiation alarm is received for RE-23, Steam Generator Blowdown Effluent Detector Ke
- The auto actions due to the high radiation signal do not occur but are performed by the y
operator within approximately five minutes of receiving the alarm
- 1) Which of the following identifies an automatic action that should have occurred?
- 2) According to the bases for ECG 39.3, Radioactive Liquid Effluent Monitoring Instrumentation, the automatic isolation setpoint is designed to ensure that isolation occurs sw prior to exceeding the limits of:
A. 1) Blowdown isolation valves, Inside Containment, FCV-760, 761, 762, and 763 close.
er
- 2) 10 CFR Part 20, Standards For Protection Against Radiation.
B. 1) Blowdown isolation valves, Inside Containment, FCV-760, 761, 762, and 763 close.
- 2) the state discharge permit.
An C. 1) Blowdown isolation valves, Outside Containment, FCV-151, 154, 157, and 160, close.
- 2) 10 CFR Part 20, Standards For Protection Against Radiation.
D. 1) Blowdown isolation valves, Outside Containment, FCV-151, 154, 157, and 160, close.
- 2) the state discharge permit.
62 Proposed Answer:
C. 1) Blowdown isolation valves, Outside Containment, FCV-151, 154, 157, and 160, close.
- 2) 10 CFR Part 20, Standards For Protection Against Radiation.
Explanation:
L1A. Incorrect. 10 CFR 20 is correct. The outside, not inside isolation valves close.
B. Incorrect. The state discharge permit is a limit the plant operates by but it is not what the ECG limit is based upon.
C. Correct. The outside isolation valves close and as stated in the bases for ECG 39.3, operable, releases may occur if the actions stated occur. ECG 39.3 bases states: The Alarm/Trip Setpoints for these instruments shall be calculated and adjusted in accordance with the methodology and parameters in the Offsite Dose Calculation procedure (CAP A-8) to ensure that the alarm/trip will occur prior to exceeding the limits of 10 CFR Part 20.
D. Incorrect. The outside isolation valves close but it is not the state permit the ECG is designed to meet but the 10 CFR part 20.
Technical
References:
ECG-39.3, LD-2 References to be provided to applicants during exam: none Learning Objective: 66068 - Apply the requirements of System 39 ECGs.
DCPP L162 Exam Rev 0
Question Source: Bank #93 DCPP NRC Exam 08/14 X (note changes; attach parent) Modified Bank #
New Past NRC Exam Yes Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.1 Difficulty: 2.5 Key swer An 62 L1 DCPP L162 Exam Rev 0
SRO Justification:
ES-401 5 Attachment 2 Figure 2-1 Screening for SRO-Only Linked to 10 CFR 55.43(b)(2) (Technical Specifications)
Can the question be answered solely by knowing Yes RO question 1-hour TS/TRM Action?
No Can the question be answered solely by knowing the LCO/TRM information listed above the line?
Key Yes RO question No the TS safety limits?
sw Can the question be answered solely by knowing er Yes RO question No An Question might not be linked to 10 CFR 55.43(b)(2) for SRO l Does the question involve one or more of the following for the TS, TRM, or ODCM:
62
- application of required actions (TS Section 3) and SRs (TS Section 4) in accordance with rules of application requirements (TS Section 1)
L1
- application of generic LCO requirements (LCO 3.0.1 through 3.0.7 and SR 4.0.1 through 4.0.4) knowledge of TS bases that is required to Yes SRO-only question analyze TS-required actions and terminology (ECG 39.3)
No ES-401, Page 21 of 52 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 3 G2.1.26 Knowledge of industrial safety procedures (such as Group # 1 rotating equipment, electrical, high temperature, high K/A # G2.1.26 pressure, caustic, chlorine, oxygen and hydrogen). Rating 3.6 Question 94 A hazardous material emergency occurs in the U1 Containment due to a leak that is determined to be Immediately Dangerous to Life and Health (IDLH).
- 1) Per CP M-9A, Hazardous Materials Incident - Initial Emergency Response/Mitigation Procedure, the _______ is/are contacted for immediate assistance.
B. 1) DCPP Fire Department Ke
- 2) Due to the IDLH environment, the maximum time to notify the NRC is ________ hour(s).
A. 1) DCPP Fire Department y
- 2) one
- 2) four C. 1) Chemistry and Environmental Operations Departments 2) one sw D. 1) Chemistry and Environmental Operations Departments er Proposed Answer: A.1) DCPP Fire Department 2) one Explanation:
- 2) four DCPP has had 2 emergency ALERT classifications due to IDLH, deficient oxygen concentration in containment and CARDOX actuation in the Turbine Building.
A. Correct. Per the procedure, the fire department is called. Due to IDLH, an ALERT An emergency plan classification will be made and the NRC must be notified within one hour.
B. Incorrect. While fire department is correct, the NRC must be notified within one hour.
Plausible if the IDLH is not put together with the emergency plan. Then either it could be thought that there is no reason to notify the NRC or that there required notification time is longer, like four or eight hours.
62 C. Incorrect. The fire department, not the C and EO department is called. The NRC is notified.
Chemistry is plausible as it seems logical if there is this type of issue and its not known that the fire department is contacted.
D. Incorrect. The fire department is notified and NRC notification is required within one hour due to activation of the emergency plan.
L1 Technical
References:
CP-M-9A and EAL chart (HA 3.1), DCPP OE SAPN 50934898 References to be provided to applicants during exam: none Learning Objective: 42159 Determine reporting requirements of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or less Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental Comprehensive/Analysis X 10CFR Part 55 Content: 55.43.3 DCPP L162 Exam Rev 1
Difficulty: 2.5 Key swer An 62 L1 DCPP L162 Exam Rev 1
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs?
No Ke Yes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- Knowledge of administration procedures that specify implementation of normal procedures An Yes SRO-only question 62 L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 3 G2.1.35 -Knowledge of the fuel-handling responsibilities of Group # 1 SROs K/A # G2.1.35 Rating 3.9 Question 95 In accordance with OP B-8DS1, Core Unloading, which of the following defueling activities is the first evolution performed requiring the direct supervision of the Refueling SRO in Containment because it is a CORE ALTERATION?
A. Unlatching RCCAs B. Lifting the upper internals C. Moving the first fuel assembly D. Lifting the reactor vessel head Key Proposed Answer: A. Unlatching RCCAs Explanation:
sw A. Correct. Per OP B-8DS1, the Refueling SRO is responsible for supervising Core Alterations. RCCA unlatching and moving of fuel assemblies are core alterations, of the er two, RCCA unlatching would be the first one performed.
B. Incorrect. Lifting the internals, is in the vessel but is not a fuel, sources, or reactivity control components, within the reactor vessel.
C. Incorrect. This is a core alteration, but comes after unlatching.
D. Incorrect. Performed prior to unlatch, but is not a core alteration Technical An
References:
OP L-6, OP B-8DS1 References to be provided to applicants during exam: none Learning Objective:6497 - State the responsibilities and duties of Refueling SRO Question Source: Bank #95 DCPP NRC 10/2016 X (note changes; attach parent) Modified Bank #
62 Question History:
Question Cognitive Level:
New Past NRC Exam Last Two NRC Exams Memory/Fundamental Yes Yes X
L1 10CFR Part 55 Content:
Difficulty: 2.0 Comprehensive/Analysis 55.43.7 DCPP L162 Exam Rev 0
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs?
No KeYes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- knowledge of administrative procedures that specify hierarchy, implementation, and/or coordination of plant normal, abnormal, and An emergency procedures (when SRO approval required)
Yes SRO-only question 62 L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 3 G2.2.6 - Knowledge of the process for making changes to Group # 2 procedures. K/A # G2.2.6 Rating 3.6 Question 96 A plant procedure which affects plant operations is being performed.
Per AD2.ID1, Procedure and Work Plan Use and Adherence, a NON-CONDITIONAL N/A in the procedure being performed ______________.
- 1. may be marked N/A without explanation
- 3. requires SRO approval A. 1 ONLY Ke
- 2. is marked N/A with the reason for the N/A documented in the remarks or cover sheet y
B. 2 ONLY C. 3 ONLY D. 2 and 3 Proposed Answer: D. 2 and 3 swer Explanation:
A. Inorrect. Per AD2.ID1, conditional N/A are typically IF statements or provide specific conditions for being marked N/A and maybe marked N/A without explanation. Non An conditional N/A are steps without conditional statements and require:
- 1. Write N/A at end of step. Perform one of the following to indicate that a consecutive group of steps is N/A:
- Write N/A at the end of the first step, and draw a vertical line through the remaining steps.
- Block-out the steps not to be performed. Write N/A in this block.
- 2. Document the reason for the N/A in the document remarks or cover sheet. Initial and date 62 this explanation.
- 3. A technically cognizant supervisor (Senior Reactor Operator if the procedure affects plant operations) shall perform the following:
- Ensure that the explanation for the N/A is appropriate.
L1
- Document approval by also initialing and dating the explanation.
B. Incorrect. The reason must be documented, however the SRO must approve the N/A.
C. Incorrect. SRO approval is required, however, documentation is required..
D. Correct. Both 2 and 3 are required.
Technical
References:
step 5.7, AD2.ID1 References to be provided to applicants during exam: none Learning Objective: 9809 - State the standard for procedure compliance Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No DCPP L162 Exam Rev 0
Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.43.3 Difficulty: 2.0 Key swer An 62 L1 DCPP L162 Exam Rev 0
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs?
No Ke Yes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- assessment of plant conditions (normal, abnormal, or emergency) and then selection of a procedure or section of a procedure to mitigate or recover, or with which to proceed An knowledge of when to implement attachments and appendices, including how to coordinate these items with procedure steps Yes SRO-only question 62 L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 3 G2.2.17 Knowledge of the process for managing Group # 2 maintenance activities during power operations, such as K/A # G2.2.17 risk assessments, work prioritization, and coordination Rating 3.8 with the transmission system operator.
Question 97 Unit 1 is at 100% power.
Unit 1 is planning to commence a ramp to 75% power for emergent maintenance.
Per Operations Policy B-1, Communications With Generation And Transmission Organizations, the ________________ has the responsibility to notify the Grid Control Center (GCC).
A. Shift Manager B. Unit 1 Shift Foreman Key C. Duty team Station Director D. Work Control Shift Foreman Proposed Answer: A. Shift Manager Explanation:.
swer A. Correct. Per Policy B-1, load changes greater than 10 MWe require notifying STES and GCC. For an unplanned ramp, the SM is responsible for making the notification.
B. Incorrect. While Unit 1 is the affected unit, the SM not the SFM is responsible to make the notification.
An C. Incorrect. The duty team SD leads the duty team which "provides a balanced leadership operational oversight model on non-workdays, as well as when emergent leadership needs arise after hours during the work week".
D. Incorrect. The WCSFM will approve the package for the work, but the notification of GCC and STES is not part of that approval. The SM makes the notification.
62 Technical
References:
OP Policy B-1 step 5 - notifications, AD8.DC59, Forced Outage References to be provided to applicants during exam: none Learning Objective:
Question Source: Bank #
L1 (note changes; attach parent)
Question History:
Modified Bank #
New Past NRC Exam Last Two NRC Exams X
No No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.43.5 Difficulty: 2.0 DCPP L162 Exam Rev 1
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs?
No Ke Yes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- assessment of plant conditions (normal, abnormal, or emergency) and then selection of a procedure or section of a procedure to mitigate or recover, or with which to proceed An knowledge of when to implement attachments and appendices, including how to coordinate these items with procedure steps Yes SRO-only question 62 L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 3 G2.3.6 -Ability to approve release permits Group # 3 K/A # G2.3.6 Rating 3.8 Question 98 In accordance with Form 69-21595, Gas Decay Tank Discharge Authorization, ____1)______ is responsible for preparing and _____2)______ is responsible for approving a Unit 1 gaseous radwaste discharge permit.
A. 1) Chemistry 2) Shift Foreman B. 1) Chemistry 2) Shift Manager C. 1) Radiation Protection 2) Shift Foreman D. 1) Radiation Protection 2) Shift Manager Key Proposed Answer: A. 1) Chemistry 2) Shift Foreman Explanation:
discharges on their unit. sw A. Correct. The permit is prepared by chemistry and approved by the Shift Foreman.
B. Incorrect. The shift manager has overall control of the plant, but the SFM approves work or er C. Incorrect. While offsite dose is part of the permit, the calculation and preparation of the permit is done by chemistry.
D. Incorrect. Prepared by chemistry, approved by the SFM.
Technical
References:
OP G-2:V steps 3.2 and 3.3 References to be provided to applicants during exam: none system Question Source:
An Learning Objective: 8443 - State the administrative requirements of Liquid Rad Waste (note changes; attach parent)
Bank #97 DCPP NRC 03/2012 Modified Bank #
X New 62 Question History:
Question Cognitive Level:
Past NRC Exam Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis Yes No X
L1 10CFR Part 55 Content:
Difficulty: 2.5 55.43.4 DCPP L162 Exam Rev 0
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs?
No Ke Yes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question sw overall mitigative strategy of a procedure?
No er Does the question require one or more of the following:
knowledge of when to implement attachments and appendices, including how to coordinate these items with procedure steps An knowledge of administrative procedures that specify hierarchy, implementation, and/or coordination of plant normal, abnormal, and emergency procedures Yes SRO-only question 62 L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 3 G2.4.5 - Knowledge of the organization of the operating Group # 4 procedures network for normal, abnormal, and emergency K/A # G2.4.5 evolutions. Rating 4.3 Question 99 The crew is performing FR-C.2, Response to Degraded Core Cooling.
Which of the following would require the crew to stop performing FR-C.2 prior to its completion?
- 1) RWST level of 33%
- 2) Negative Intermediate Range Startup Rate of -0.1 DPM A. 1 ONLY Ke
- 3) AFW flow is 400 gpm and steam generator narrow range levels are reading 0%
y B. 2 ONLY C. Either 1 or 3 D. Either 2 or 3 Proposed Answer: C. Either 1 or 3 Explanation:
swer Organization of the EOP network is to remain in the FR procedure UNLESS a higher CSF is challenged (RED- MAGENTA-YELLOW), then the procedure is stopped and the higher challenge is performed.
An A. Incorrect. This is correct, RWST level of 33% requires transition to E-1.3 (per the foldout page of FR-C.2, but is incomplete, the loss of heat sink (option 3) is a "RED" also requires terminating C.2. (note, there are procedures in the emergency response network that do not have the foldout page requirement, such as FR-S.1. Additionally, there are notes and cautions that certain procedures are not performed .. (such as in E-1.3 which states FR 62 procedures are not addressed until aligned for cold leg recirc)
B. Incorrect. This is not the MAGENTA path forsubcriticality. A positive startup rate is the MAGENTA path and would then require stopping FR-C.2 because it would be a higher priority. Priority is Subcriticality, Core Cooling, Secondary Heat Sink, RCS Integrity, L1 Containment Intergrity and RCS Inventory (SCHPZI).
C. Correct. Both the RWST level and the Heat Sink RED path would require stopping the performance of C.2.
D. Incorrect. There is a RED path for loss of secondary heat sink, however, the challenge to subcriticality is not a magenta and does not require stopping Technical
References:
F-0, FR-C.2 References to be provided to applicants during exam: none Learning Objective: 38107Apply the Rules of Usage in EOPs for the CSFSTs and FRGs, including:
the six status trees the priority of use of the status trees the priority of use of the color of each CSF when to monitor and/or implement the CSFSTs and FRGs DCPP L162 Exam Rev 1
Question Source: Bank #
(note changes; attach parent) Modified Bank #
New X Past NRC Exam No Question History: Last Two NRC Exams No Question Cognitive Level: Memory/Fundamental X Comprehensive/Analysis 10CFR Part 55 Content: 55.43.5 Difficulty: 2.0 Key swer An 62 L1 DCPP L162 Exam Rev 1
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters that require direct entry into major EOPs?
No KeYes y
RO question Can the question be answered solely by knowing the purpose, overall sequence of events, or Yes RO question No sw overall mitigative strategy of a procedure?
er Does the question require one or more of the following:
- assessment of plant conditions (normal, abnormal, or emergency) and then selection of a procedure or section of a procedure to mitigate or recover, or with which to proceed An knowledge of administrative procedures that specify hierarchy, implementation, and/or coordination of plant normal, abnormal, and emergency procedures (organization of the EOPs and heirarchy.)
Yes SRO-only question 62 L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
ES-401 5 Attachment 2 Figure 2-1 Screening for SRO-Only Linked to 10 CFR 55.43(b)(2) (Technical Specifications)
Can the question be answered solely by knowing Yes RO question 1-hour TS/TRM Action?
No Can the question be answered solely by knowing the LCO/TRM information listed above the line?
No Ke Yes y RO question the TS safety limits?
No sw Can the question be answered solely by knowing er Yes RO question Does the question involve one or more of the following An for the TS, TRM, or ODCM:
- application of required actions (TS Section 3) and SRs (TS Section 4) in accordance with rules of application requirements (TS Section 1)
Yes 62
- application of generic LCO requirements (LCO 3.0.1 through 3.0.7 and SR 4.0.1 through 4.0.4) knowledge of TS bases that is required to SRO-only question L1 analyze TS-required actions and terminology No Question might not be linked to 10 CFR 55.43(b)(2) for SRO l ES-401, Page 21 of 52 DCPP L162 Exam Rev 0
Examination Outline Cross-Reference Level SRO Tier # 3 G2.4.37 - Knowledge of the lines of authority during Group # 4 implementation of the emergency plan. K/A # G2.4.37 Rating 4.7 Question 100 An ALERT is declared at 1300.
- 1) _________________ may downgrade the classification.
- 2) Both the county and state must initially be notified of the ALERT no later than _______.
A. 1) Either the Shift Manager or the Emergency Director 2) 1315 B. 1) Only the Emergency Director y
- 2) 1315 C. 1) Either the Shift Manager or the Emergency Director D. 1) Only the Emergency Director Ke 2) 1400
- 2) 1400 Proposed Answer: B. 1) Only the Emergency Director 2) 1315 Explanation:
er A. Incorrect. The Shift Manager is the Emergency Director until relieved, which occurs after activation. The SM, as ED, may upgrade a classification but can only downgrade an sw Unusual Event The county and state must be notified within 15 minutes .
B. Correct. Per EP G-1, only the ED has the authority to downgrade a classification of alert or higher. 15 minutes to notify State and County.
C. Incorrect. The SM can only downgrade a NUE. This is the time when NRC notification is required.
An D. Incorrect. Only the ED can downgrade the ALERT and the NRC must be notified within an hour of classification, but 15 minutes is what is required for state and county.
Technical
References:
EP G-1, G-3 References to be provided to applicants during exam: none Learning Objective: 42287 -As described in EP G-3, state the requirements for the following:
62 Initial Notifications (Time Critical)
Question Source:
(note changes; attach parent)
Bank #
Modified Bank #
New X L1 Question History:
Question Cognitive Level:
Past NRC Exam Last Two NRC Exams Memory/Fundamental Comprehensive/Analysis No No X
10CFR Part 55 Content: 55.43.1 Difficulty: 2.5 DCPP L162 Exam Rev 0
SRO Justification:
Can the question be answered solely by knowing systems knowledge (i.e., how the system works, Yes flowpath, logic, component location)?
RO question No Can the question be answered solely by knowing immediate operator actions? Yes RO question No Can the question be answered solely by knowing entry conditions for AOPs or plant parameters Yes y RO question that require direct entry into major EOPs?
No Can the question be answered solely by knowing Ke the purpose, overall sequence of events, or Yes RO question overall mitigative strategy of a procedure?
No er
- License requirement sw Does the question require one or more of the following:
An Yes SRO-only question 62 L1 No Question might not be linked to 10 CFR 55.43(b)(5) for SRO-only DCPP L162 Exam Rev 0
REFERENCES OP AP-7 R47A Page 23 of 29 Turbine Operating Limitations U1&2 Attachment 2: Page 1 of 1 TURBIN E OPERATI NG LIM ITAT IONS (Breaker CLOSED) 11 C
O 1 0.2 10 N
D 118 2 9 TR IP TURBINE IMM EDIATELY P
R 8 E 7.2 S 7 600 S TURBINE TRIP SETPOINT U 6 R
E, 5 IN 4 AC CEPTA BLE OPER ATING R EGION H 3 G
2 A
B S 1 0
0 12 0 240 360 480 600 720 840 9 60 1080 1200 TU RBI NE LOAD, MW e T URBIN E OPERATING LIM ITAT IONS (Breaker OPEN) 11 TRIP TURBI NE IM MEDIATELY C
O 10 10.2 N
126 0 D TURBINE TRIP SETPOI NT 9
P R 8 E 7.2 S 7 162 0 S
U 6 ACCEPTABLE OPE RATING REGION R
E, 5 IN 4 H 3 G
2 A
B S 1 0
0 180 36 0 540 720 90 0 10 80 1260 1 440 16 20 1 800 TURBINE SPEED, RPM OP_AP-7u3r47.DOC 0908.1526
OP AP-7 R47A Page 23 of 29 Turbine Operating Limitations U1&2 Attachment 2: Page 1 of 1 TURBIN E OPERATI NG LIM ITAT IONS (Breaker CLOSED) 11 C
O 1 0.2 10 N
D 118 2 9 TR IP TURBINE IMM EDIATELY P
R 8 E 7.2 S 7 600 S TURBINE TRIP SETPOINT U 6 R
E, 5 IN 4 AC CEPTA BLE OPER ATING R EGION H 3 G
2 A
B S 1 0
0 12 0 240 360 480 600 720 840 9 60 1080 1200 TU RBI NE LOAD, MW e T URBIN E OPERATING LIM ITAT IONS (Breaker OPEN) 11 TRIP TURBI NE IM MEDIATELY C
O 10 10.2 N
126 0 D TURBINE TRIP SETPOI NT 9
P R 8 E 7.2 S 7 162 0 S
U 6 ACCEPTABLE OPE RATING REGION R
E, 5 IN 4 H 3 G
2 A
B S 1 0
0 180 36 0 540 720 90 0 10 80 1260 1 440 16 20 1 800 TURBINE SPEED, RPM OP_AP-7u3r47.DOC 0908.1526
OP J-2:VIII R31 Page 11 of 78 Diablo Canyon Electrical Alignment Configurations U1&2 Attachment 1: Page 1 of 1 CO NFIG UR AT IO N 1 CO NFIG URA T IO N 2 C O NFIG URA T ION 3 B A CK FE E D T RA NS FE R POW ER 230 KV 5 00KV 23 0KV 500K V 2 30KV 5 00KV (S U) (A UX ) (SU ) (AU X) (SU ) (A UX )
PC B PC B P CB MOD MOD MOD DC PP D CP P G EN D CP P G EN LO A D LO AD LO A D G EN (T ypical O ffline) (Typical O nline)
NO TE : Configuration 2 (T ransfer) applies when at least one 12kV bus is aligned to S tartup; other buses aligned to either S tartup or Aux.
OP_J-2~VIIIu3r31.DOC 1003.1310
OP J-2:VIII R31 Page 12 of 78 230kV Offsite Power Operability Evaluation - LTC IN AUTO U1&2 Attachment 2: Page 1 of 1 Load Transfer Level (Att. 3 Table 1)
OP_J-2~VIIIu3r31.DOC 1003.1310
OP J-2:VIII R31 Page 49 of 78 O-23, "Operating Instruction for Reliable Transmission Service to DCPP" U1&2 Attachment 3: Page 37 of 64 OP_J-2~VIIIu3r31.DOC 1003.1310
OP J-2:VIII R31 Page 66 of 78 O-23, "Operating Instruction for Reliable Transmission Service to DCPP" U1&2 Attachment 3: Page 54 of 64 OP_J-2~VIIIu3r31.DOC 1003.1310