MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20243012023-08-24024 August 2023 Notification of NRC Initial Operator Licensing Examination 05000275/2024301; 05000323/2024301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter ML21075A0882021-02-12012 February 2021 DC-2021-01 Final Written Exam ML21075A2252021-02-12012 February 2021 DC-2021-01 Draft Written Exam ML21075A2242021-02-12012 February 2021 DC-2021-01 Draft Written Comments ML21075A2212021-02-12012 February 2021 DC-2021-01 Draft Op Test ML21075A2262021-02-12012 February 2021 DC-2021-01 Final Outlines ML21075A2202021-02-12012 February 2021 DC 2021-01 Draft Op Test Comments DCL-20-073, DC-2021-01 Draft Outlines2021-02-12012 February 2021 DC-2021-01 Draft Outlines ML21075A2222021-02-12012 February 2021 DC-2021-01 Draft Outline Comments ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A0872021-02-12012 February 2021 DC-2021-01 Final Op Test DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments IR 05000275/20203012020-02-19019 February 2020 NRC Initial Operator Licensing Examination Approval 05000275/2020301; 05000323/2020301 DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 2024-08-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20243012023-08-24024 August 2023 Notification of NRC Initial Operator Licensing Examination 05000275/2024301; 05000323/2024301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms ML21075A2242021-02-12012 February 2021 DC-2021-01 Draft Written Comments ML21075A2212021-02-12012 February 2021 DC-2021-01 Draft Op Test ML21075A2202021-02-12012 February 2021 DC 2021-01 Draft Op Test Comments ML21075A2222021-02-12012 February 2021 DC-2021-01 Draft Outline Comments ML21075A2262021-02-12012 February 2021 DC-2021-01 Final Outlines DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A0882021-02-12012 February 2021 DC-2021-01 Final Written Exam ML21075A2252021-02-12012 February 2021 DC-2021-01 Draft Written Exam ML21075A0872021-02-12012 February 2021 DC-2021-01 Final Op Test DCL-20-073, DC-2021-01 Draft Outlines2021-02-12012 February 2021 DC-2021-01 Draft Outlines DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments IR 05000275/20203012020-02-19019 February 2020 NRC Initial Operator Licensing Examination Approval 05000275/2020301; 05000323/2020301 DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines 2024-08-02
[Table view] |
Text
Diablo Canyon 2018-01 Operating Test Comments NOTE: This summary is being provided in lieu of Form 301-7, Operating Test Review Worksheet, because the licensees operating test submittal was reviewed and overall deemed SATISFACTORY.
Scenario 1:
- Event 6 - add steps for E-2 entry; add close MSIVs in D2
- Event 7 - non-verifiable action (not a component failure)
- Page 8 - manual trip not a post-scenario critical task (TDAFW should be started as part of E-0)
- Terminate after SRO announces transition to E-1 Scenario 2:
- Event 1 - Revise such that an adjustment is required Scenario 3:
- Add steps to manually initiate SI Scenario 5:
- Event 2 - Add potential alternate success path
- Event 5 - Add 5 minute RCP trip criteria
- Event 6 - Add note that crew may address charging pump cavitiation\
JPM S1:
- Eliminate 3rd bullet in task standard
- Step 1 change cue to The SM directs you to continually borate
- Step 4.3 is not critical JPM S-2:
- Change time validation to 10 minutes
JPM S-3:
- In task standard make pressure decrease > TS value (579 lbs.)
- Terminate JPM after step 5.8 JPM S-4:
- Add remains running in task standard
- 9.3 critical with addition of pump remains running JPM S-5:
- In task standard add place alternate CFCU in service
- Step 5.4 is critical JPM S-6:
- Terminate JPM after step 12.8 JPM S-7:
- Add ramp complete to task standard
- Eliminate 1st cue on page 6; replace 2nd cue with Tave/Tref are in an acceptable band
- Step 6.1 now critical JPM S-8:
- Change time validation to 10 minutes JPM P-1:
- Change validation time to 15 minutes JPMs P-2 and P-3:
- Delete 2nd bullet of initiating cue
JPM A-2:
- Enhance DRPI picture (need different picture than SRO JPM)
- Delete U2 COLR from required materials
- Change validation time to 20 minutes JPM A-3:
- In task standard, add in first bullet correctly calculate AFD and determine NI-42C and NI-43C exceed limits; delete 2nd bullet JPM A-4:
- Add interlocks verified in initial conditions
- Student handout for PC 936A should say bypassed
- Add note that two temperature comparators may be included in form JPM A-6:
- Delete U2 COLR from required materials
- Remove 2nd bullet from task standard JPM A-7:
- In bullet 3 in task standard add that applicant may choose to restore AFD within 30 minutes JPM A-8:
- Remove ECG from task standard JPM A-9:
- Delete 2nd bullet from task standard