Security Inspection Report 05000275 and 05000323/2021420
ML22082A239
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/31/2022
From: Clark J
Security Performance Evaluation Branch
To: Gerfen P
Pacific Gas & Electric Co
References
IR 2021420
Download: ML22082A239 (6)


Text

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - SECURITY INSPECTION REPORT 05000275/2022420 AND 05000323/2022420

Dear Ms. Gerfen:

On March 4, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant, Units 1 and 2. On March 9, 2022, the NRC inspectors discussed the results of this inspection with Mr. Adam Peck and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket No. 05000275 and 05000323 License No. DPR-80 and DPR-82

Enclosure:

Inspection Report

Inspection Report

Docket Numbers:

05000275 and 05000323 License Numbers:

DPR-80 and DPR-82 Report Numbers:

05000275/2022420 and 05000323/2022420 Enterprise Identifier:

I-2022-420-0002 Licensee:

Pacific Gas & Electric Company Facility:

Diablo Canyon Power Plant, Units 1 and 2 Location:

Avila Beach, California Inspection Dates:

January 31, 2022, to March 9, 2022 Inspectors:

D. Bradfield, Team Leader, NSIR R. Lanfear, Physical Security Inspector, RIV P. Negrete, Physical Security Inspector, NSIR R. Ober, Sr. Physical Security Inspector, NSIR Approved By:

Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security inspection at Diablo Canyon Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

92707 - Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited

NRC inspectors completed this inspection by gathering sufficient information to develop a scenario that can be segmented into limited scope tactical response drills that allows for a limited assessment of the ability of licensees physical security systems and security organization to meet the general performance objective of Title 10 of the Code of Federal Regulations (10 CFR) 73.55(b) and to ensure changes made to the physical protection program in response to a local, State, or Federal emergency (e.g., state of emergency, disaster, or public health emergency) have not adversely impacted the licensees implementation of their protective strategy.

REPORT ATTACHMENTS Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS125895.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On March 9, 2022, the inspectors presented the security inspection results to Mr. Adam Peck and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

Resulting from

Inspection

Diablo Canyon

Power Plant

Corrective

Actions

51145052 - Controller positioning

51145053 - Officer looked away to communicate with his

controller

51145045 - Brass Catcher issue

51145044 - Hand held radio microphone

03/02/2022

Critical Target

Sets

Diablo Canyon Target Sets

2/31/2021

Physical Security

Plan

Diablo Canyon Physical Security Plan

2/16/2020

2707

Miscellaneous

Protective

Strategy

Diablo Canyon Protective Strategy

06/16/2020

ML22082A239

OFFICE

NSIR/DSO/SPEB

NSIR/DSO/SPEB

/ETC

R-IV/DRS/PSB1

NSIR/DSO/SPEB

/ETA

NAME

RStone

DBradfield

RLanfear

JClark

DATE

Mar 29, 2022

Mar 30, 2022

Mar 30, 2022

Mar 31, 2022