ML19007A113
| ML19007A113 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 01/03/2019 |
| From: | Vincent Gaddy Operations Branch IV |
| To: | Welsch J Pacific Gas & Electric Co |
| References | |
| 50-275/19-301, 50-323/19-301 | |
| Download: ML19007A113 (3) | |
See also: IR 05000275/2019301
Text
January 3, 2019
Mr. James Welsch, Chief Nuclear Officer,
and Vice President, Nuclear Generation
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INITIAL
OPERATOR LICENSING EXAMINATION APPROVAL 05000275/2019301;
Dear Mr. Welsch:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at your Diablo Canyon Power Plant, Units 1 and 2.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Mr. R. Fortier,
Lead Examination Developer. Note that any examination waivers and applications denials have
been addressed in separate correspondence.
The Nuclear Regulatory Commission (NRC) has approved the subject examinations and hereby
authorizes you to administer the written examination in accordance with NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors," Revision 11, on January 25,
2019. The NRC staff will administer the operating tests during the week of January 14, 2019.
This examination has undergone extensive review by my staff and representatives responsible
for licensed operator training at your facility. Based on this review, I have concluded that the
examination meets the guidelines of NUREG-1021 for content, operational, and discrimination
validity. By administering this examination, you also agree that it meets NUREG-1021
guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at
your facility. If you determine that this examination is not appropriate for licensing operators at
your facility, do not administer the examination and contact me at 817-200-1159.
J. Welsch
2
Please contact your Chief Examiner, Clyde Osterholtz, at 817-200-1269, if you have any
questions or identify any errors or changes in the license level (RO or SRO) or type of
examination (partial or complete written examination and/or operating test) specified for each
applicant.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-275 and 50-323
License Nos.: DPR-80 and DPR-82
SUNSI Review
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
By: CCO
Yes No
Publicly Available
Sensitive
OFFICE
OB:SOE
C:OB
NAME
COsterholtz
VGaddy
SIGNATURE
/RA/
/RA/
DATE
01/03/19
01/03/19