Category:License-Operator
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16337A0232016-10-20020 October 2016 2016-10 Public Forms ML16336A5732016-10-20020 October 2016 Diablo-2016-10 Draft Written Examination ML16336A5722016-10-20020 October 2016 2016-10 Draft Outlines ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines ML16336A5782016-10-20020 October 2016 2016-10 Written Exam Comments ML16336A5762016-10-20020 October 2016 2016-10 Operating Test Comments ML16336A5572016-10-20020 October 2016 2016-10 Draft Operating Test ML16321A2432016-10-20020 October 2016 2016-10 Final Written Exam 2024-08-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML16321A2602016-10-20020 October 2016 2016-10 Final Operating Test ML16336A5572016-10-20020 October 2016 2016-10 Draft Operating Test ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines ML16336A5732016-10-20020 October 2016 Diablo-2016-10 Draft Written Examination ML16336A5722016-10-20020 October 2016 2016-10 Draft Outlines ML16337A0232016-10-20020 October 2016 2016-10 Public Forms ML16336A5782016-10-20020 October 2016 2016-10 Written Exam Comments ML16336A5762016-10-20020 October 2016 2016-10 Operating Test Comments ML16321A3212016-10-20020 October 2016 2016-10 Post Examination Comments DCL-16-112, Diablo Canyon-2016-10 Post Examination Comments2016-10-20020 October 2016 Diablo Canyon-2016-10 Post Examination Comments 2024-08-02
[Table view] |
Text
DRAFT OUTLINE COMMENTS Facility: DC First Exam Date: October 14, 2016 Written Exam Outline (Date)
Comment Resolution Add KA Topics for replaced KAs Complete 1
including correct IR SRO T2G1 006 A2.13 mark the A2 Complete column and delete the information in T2G1 078 that this question replaced RO T1G1 APE 054 - Typo - KA should Complete 2
be AK3.03 instead EK3.03 RO T1G1 APE 062 - KA replacement Complete 3
should be AK3.03 instead EK3.03 RO T1G2 APE 036 AA2.01 - Remove Complete 4 the X from the K2 column that was added in error.
RO T1G2 APE 059 AA1.02 - Annotate Complete 5 that PRM is used instead of the KA standard statement of ARM Be cognizant of repeating questions Complete from the last 2 written exams because 7 questions on this exam have identical K/As from the previous 2 written exams.
- a. RO T2G1 076 K2.08 replaced with K2.01. Same KA selected on previous exam.
- b. SRO T1G2 024 AA2.04 Same KA selected on previous exam.
6 c. RO T1G1 029 EK2.06 same KA as 2014 exam.
- d. RO T2G1 012 K2.01 same as 2014 exam
- e. RO T3 2.1.15 same as 2014 exam
- f. RO T3 2.3.11 same as 2014 exam
- g. SRO T1G1 022 AA2.01 same as 2014 exam Administrative JPM Outline (Date)
Comment Resolution 1 None 2 OBDI 202 - IOLE Process Rev 2
Control Room / In-Plant System JPM Outline (Date)
Comment Resolution Replacing LJC-S6 with another JPM Complete 1
due to similar to scenario actions 2
Simulator Scenario Outline Comments (Date)
Comment Resolution Generic Comments Complete
- a. Need to work on the bounding criteria for the critical tasks in all of the scenarios and description of the safety function impact if the task is not performed.
Scenario 1 Complete
- a. Change out events 3 for an ASW Failure. This will give a component failure and a TS call.
- b. Event 4 change to a component failure and TS call.
- c. Event 5 is a TS only call due to actions are not required to be taken until after the major event occurs. For this to be a component failure it will need to be after the major event.
Scenario 2 Complete
- a. Event 2 need to annotate that it is a TS only call. Is not a component failure due to no operator actions
- b. Review CT 2 and 3 for validity.
Additionally need to clarify bounding task and justifications Scenario 3 Complete
- a. CT1 identify the indications of severe challenge develops in the critical task. (ie. Red Path)
Scenario 4 Complete
- a. Event 3 is there an AR or AOP that is performed in response to this malfunctions?
- b. CT1 needs to define method of addition of negative reactivity OBDI 202 - IOLE Process Rev 2
that is needed to complete the critical task
- c. CT2 needs to have bounding criteria (i.e time to restore cooling, maximum temperature.
etc..) Isolation of the seal occurs prior to isolating safeguard loads OBDI 202 - IOLE Process Rev 2