Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301
ML17103A251
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/13/2017
From: Vincent Gaddy
Operations Branch IV
To: Halpin E
Pacific Gas & Electric Co
References
50-275/18-301, 50-323/18-301 50-275/18-OL, 50-323/18-OL
Download: ML17103A251 (4)


See also: IR 05000275/2018301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

April 13, 2017

Mr. Edward D. Halpin, Senior Vice President

and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF

NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2018301;

05000323/2018301

Dear Mr. Halpin:

In a conversation on April 6, 2017, between Messrs. R. Fortier, Lead Examination Developer,

and C. Osterholtz, Chief Examiner, arrangements were made for the administration of licensing

examinations at Diablo Canyon Power Plant, Units 1 and 2, during the week of January 22,

2018.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in Revision 11, of NUREG-1021, Operator Licensing Examination Standards for

Power Reactors. The NRCs regional office will discuss with your staff any changes that might

be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outlines by August 20, 2017. The written examinations, operating tests, and supporting

reference materials identified in Attachment 3 to ES-201 will be due by November 3, 2017.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

examinations and tests before they are submitted to the NRC for review and approval. All

materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Delays in

receiving the required materials, or the submittal of inadequate or incomplete materials, may

cause the examinations to be cancelled or rescheduled. In addition, your support for on-site

validation of the examinations is required during the week of December 11, 2017.

To conduct the requested written examinations and operating tests, it will be necessary for your

staff to provide adequate space and accommodations in accordance with ES-402, and to make

the simulation facility available on the dates noted above. In accordance with ES-302, your staff

should retain the original simulator performance data (e.g., system pressures, temperatures,

E. Halping 2

and levels) generated during the dynamic operating tests along with any video and audio

recordings of the dynamic operating tests until the NRC takes its licensing action on all of the

applications and any adjudicatory actions on any hearing demands are complete. Appendix E

to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while

the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator waiver or excusal requests (if any) (Office of Management

and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination

date (if able). Mr. Osterholtz should be contacted to determine the method for submission of the

waiver and/or excusal requests. Preliminary reactor operator and senior reactor operator

license applications (OMB approval number 3150-0090) and, medical certifications

(OMB approval number 3150-0024) should be submitted at least 30 days before the first

examination date. If the preliminary applications are not received at least 30 days before the

examination date, a postponement may be necessary. Final, signed applications certifying that

all training has been completed and requesting any waivers or excusals, as applicable, should

be submitted at least 14 days before the first examination date.

Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the

first examination date (preliminary) and 14 days before the first examination date (final), the

requests should be submitted as early in the process as possible (see the 60-day guideline,

above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.

Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or

as directed when Mr. Osterholtz is contacted to determine the method for submission). The

NRCs final decision on whether to grant a waiver or excusal will be documented on the final

(not preliminary) NRC Form 398 submitted for the applicant and will not be provided until the

final application is submitted to the NRC.

Paperwork Reduction Act Statement

This letter contains information collection requirements that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved

by the Office of Management and Budget, approval number 3150-0018.

The burden to the public for these voluntary information collections is estimated to average

2250 hours0.026 days <br />0.625 hours <br />0.00372 weeks <br />8.56125e-4 months <br /> per examination including the time for reviewing instructions, searching existing data

sources, gathering and maintaining the data needed, and completing and reviewing the

information collection. You may submit comments on any aspect of the information collection,

including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections

Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by

electronic mail to INFOCOLLECTS.Resource@nrc.gov, and to the Desk Officer, Office of

Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and

Budget, Washington, DC 20503.

Public Protection Notification

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid OMB control number.

E. Halping 3

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available

electronically for public inspection in the NRCs Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page

of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Osterholtz at 817-200-1269, or myself at

817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket Nos. 50-275 and 50-323

License Nos. DPR-80 and DPR-82

cc: Electronic Distribution

ML17103A251

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: VGaddy Yes No Publicly Available Sensitive NRC-002

OFFICE SOE C:OB

NAME COsterholtz VGaddy

SIGNATURE /RA/ /RA/

DATE 4/12/17 4/13/17