IE Insp Repts 50-321/80-34 & 50-366/80-34 on 800813-14.No Noncompliance Noted.Major Areas Inspected:Licensee Implementation of Contingency Strike Plan.Details Withheld (Ref 10CFR2.790)
ML19338D440
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/29/1980
From: Mcguire D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19064A131 List:
References
50-321-80-34, 50-366-80-34, NUDOCS 8009230210
Download: ML19338D440 (1)


Text

IAATERIALTPAMSt.11TTED HEREWITH CONTAINS 2.OINFiRMAT10M

  1. pocz'o,,

UNITED 5VATES

NUCLEAR REGULATORY COMMISSION

~

o t

na REGION ll o,

'[

101 MARIETTA ST., N.W., SutTE 3100

    • "*/

ATLANTA, GEORGIA J0303 m

x; AUG 291980 Report Nos. 50-321/80-34 and 50-366/80-34 Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5 Licensee: Georgia Power Company

-

270 Peachtree Street Atlanta, GA 30303 Facility Name: Plant Hatch 1 and 2 Inspection at: Baxley, Georgia Inspection conducted: August 13 - 14, 1980 Date of Last Physical Security Inspection Visit: March 26-28, 1980 Type of Inspection: Special Announced Physical Security Inspe[y / W. J. Tobin,denior Physical Security Inspector Meffo M

t) ate i

Approved by:

b P/hd D. R. McGuire, Section Chief, Safeguards Branch Dite Inspection Summary Areas Inspected: Included review of the licensee's implementation of the Contin-gency Strike Plan.

The inspection involved 14 inspector-hours onsite by one NRC inspector. The inspection was begun during an offshift period; six inspection hours were accom-plished during offshift periods.

Results:

The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection.

S-F2 RA 1CA

-

Copy of Copies 4009230g/p a

rages MATERIALTRANSf.ffiTED HEREHWH This Document is not to be

..

CONTAlHS 2.700INFORMATION reproduced without specifia

'

-