IR 05000321/1980034
| ML19338D440 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/29/1980 |
| From: | Mcguire D, Tobin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19064A131 | List: |
| References | |
| 50-321-80-34, 50-366-80-34, NUDOCS 8009230210 | |
| Download: ML19338D440 (1) | |
Text
IAATERIALTPAMSt.11TTED HEREWITH CONTAINS 2.OINFiRMAT10M
- pocz'o,,
UNITED 5VATES
NUCLEAR REGULATORY COMMISSION
~
o t
na REGION ll o,
'[
101 MARIETTA ST., N.W., SutTE 3100
- "*/
ATLANTA, GEORGIA J0303 m
x; AUG 291980 Report Nos. 50-321/80-34 and 50-366/80-34 Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5 Licensee: Georgia Power Company
-
270 Peachtree Street Atlanta, GA 30303 Facility Name: Plant Hatch 1 and 2 Inspection at: Baxley, Georgia Inspection conducted: August 13 - 14, 1980 Date of Last Physical Security Inspection Visit: March 26-28, 1980 Type of Inspection: Special Announced Physical Security Inspe[y / W. J. Tobin,denior Physical Security Inspector Meffo M
t) ate i
Approved by:
b P/hd D. R. McGuire, Section Chief, Safeguards Branch Dite Inspection Summary Areas Inspected: Included review of the licensee's implementation of the Contin-gency Strike Plan.
The inspection involved 14 inspector-hours onsite by one NRC inspector. The inspection was begun during an offshift period; six inspection hours were accom-plished during offshift periods.
Results:
The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection.