Category:INSPECTION REPORT
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 05000483/19970201997-12-16016 December 1997 Insp Rept 50-483/97-20 on 971026-1206.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19970181997-11-12012 November 1997 Insp Rept 50-483/97-18 on 971027-31.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Personnel,Packages & Vehicles,Assessment Aids & Security Plans IR 05000483/19970171997-11-12012 November 1997 Insp Rept 50-483/97-17 on 970914-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970161997-10-0707 October 1997 Insp Rept 50-483/97-16 on 970915-19.No Violations Noted. Major Areas Inspected:External & Internal Exposure Controls, Dose Assessment & Records,Controls of Radioactive Matl & Contamination & Surveying & Monitoring IR 05000483/19970151997-09-22022 September 1997 Insp Rept 50-483/97-15 on 970802-0913.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970131997-09-0404 September 1997 Insp Rept 50-483/97-13 on 970811-15.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000483/19970141997-08-0606 August 1997 Insp Rept 50-483/97-14 on 970622-0802.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20141E4791997-06-26026 June 1997 Insp Rept 50-483/97-05 on 970210-14 & 24-28.Violations Noted.Major Areas Inspected:Engineering IR 05000483/19970061997-06-20020 June 1997 Insp Rept 50-483/97-06 on 970519-23.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000483/19970081997-05-20020 May 1997 Insp Rept 50-483/97-08 on 970317-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970101997-05-19019 May 1997 Insp Rept 50-483/97-10 on 970330-0510.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000483/19970091997-05-0909 May 1997 Partially Withheld Insp Rept 50-483/97-09 on 970422-25.No Violations Noted.Major Areas Inspected:Licensee Implementation of Land Vehicle Control Measures Implemented IAW 10CFR73, Physical Protection of Plants & Matl IR 05000483/19970071997-04-0808 April 1997 Insp Rept 50-483/97-07 on 970216-0329.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970011997-03-26026 March 1997 Insp Rept 50-483/97-01 on 970224-28.No Violations Noted. Major Areas Inspected:Competency of Six SRO and Five RO Applicants for Issuance of Operating Licenses IR 05000483/19970041997-02-28028 February 1997 Insp Rept 50-483/97-04 on 970127-31.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Program to Maintain Occupational Exposures Alara,Training & Qualifications of Radiation Protection Organizations 1999-09-22
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 05000483/19970201997-12-16016 December 1997 Insp Rept 50-483/97-20 on 971026-1206.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19970181997-11-12012 November 1997 Insp Rept 50-483/97-18 on 971027-31.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Personnel,Packages & Vehicles,Assessment Aids & Security Plans IR 05000483/19970171997-11-12012 November 1997 Insp Rept 50-483/97-17 on 970914-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970161997-10-0707 October 1997 Insp Rept 50-483/97-16 on 970915-19.No Violations Noted. Major Areas Inspected:External & Internal Exposure Controls, Dose Assessment & Records,Controls of Radioactive Matl & Contamination & Surveying & Monitoring IR 05000483/19970151997-09-22022 September 1997 Insp Rept 50-483/97-15 on 970802-0913.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970131997-09-0404 September 1997 Insp Rept 50-483/97-13 on 970811-15.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000483/19970141997-08-0606 August 1997 Insp Rept 50-483/97-14 on 970622-0802.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20141E4791997-06-26026 June 1997 Insp Rept 50-483/97-05 on 970210-14 & 24-28.Violations Noted.Major Areas Inspected:Engineering IR 05000483/19970061997-06-20020 June 1997 Insp Rept 50-483/97-06 on 970519-23.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000483/19970081997-05-20020 May 1997 Insp Rept 50-483/97-08 on 970317-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970101997-05-19019 May 1997 Insp Rept 50-483/97-10 on 970330-0510.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000483/19970091997-05-0909 May 1997 Partially Withheld Insp Rept 50-483/97-09 on 970422-25.No Violations Noted.Major Areas Inspected:Licensee Implementation of Land Vehicle Control Measures Implemented IAW 10CFR73, Physical Protection of Plants & Matl IR 05000483/19970071997-04-0808 April 1997 Insp Rept 50-483/97-07 on 970216-0329.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970011997-03-26026 March 1997 Insp Rept 50-483/97-01 on 970224-28.No Violations Noted. Major Areas Inspected:Competency of Six SRO and Five RO Applicants for Issuance of Operating Licenses IR 05000483/19970041997-02-28028 February 1997 Insp Rept 50-483/97-04 on 970127-31.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Program to Maintain Occupational Exposures Alara,Training & Qualifications of Radiation Protection Organizations 1999-09-22
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 05000483/19970201997-12-16016 December 1997 Insp Rept 50-483/97-20 on 971026-1206.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19970181997-11-12012 November 1997 Insp Rept 50-483/97-18 on 971027-31.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Personnel,Packages & Vehicles,Assessment Aids & Security Plans IR 05000483/19970171997-11-12012 November 1997 Insp Rept 50-483/97-17 on 970914-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970161997-10-0707 October 1997 Insp Rept 50-483/97-16 on 970915-19.No Violations Noted. Major Areas Inspected:External & Internal Exposure Controls, Dose Assessment & Records,Controls of Radioactive Matl & Contamination & Surveying & Monitoring IR 05000483/19970151997-09-22022 September 1997 Insp Rept 50-483/97-15 on 970802-0913.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970131997-09-0404 September 1997 Insp Rept 50-483/97-13 on 970811-15.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000483/19970141997-08-0606 August 1997 Insp Rept 50-483/97-14 on 970622-0802.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20141E4791997-06-26026 June 1997 Insp Rept 50-483/97-05 on 970210-14 & 24-28.Violations Noted.Major Areas Inspected:Engineering IR 05000483/19970061997-06-20020 June 1997 Insp Rept 50-483/97-06 on 970519-23.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000483/19970081997-05-20020 May 1997 Insp Rept 50-483/97-08 on 970317-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970101997-05-19019 May 1997 Insp Rept 50-483/97-10 on 970330-0510.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000483/19970091997-05-0909 May 1997 Partially Withheld Insp Rept 50-483/97-09 on 970422-25.No Violations Noted.Major Areas Inspected:Licensee Implementation of Land Vehicle Control Measures Implemented IAW 10CFR73, Physical Protection of Plants & Matl IR 05000483/19970071997-04-0808 April 1997 Insp Rept 50-483/97-07 on 970216-0329.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970011997-03-26026 March 1997 Insp Rept 50-483/97-01 on 970224-28.No Violations Noted. Major Areas Inspected:Competency of Six SRO and Five RO Applicants for Issuance of Operating Licenses IR 05000483/19970041997-02-28028 February 1997 Insp Rept 50-483/97-04 on 970127-31.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Program to Maintain Occupational Exposures Alara,Training & Qualifications of Radiation Protection Organizations 1999-09-22
[Table view] Category:UTILITY
MONTHYEARIR 05000483/19900181990-11-14014 November 1990 Insp Rept 50-483/90-18 on 901001-03 & 1105.No Violations Noted.Major Areas Inspected:Inservice Insp Activities Including Review of Program Procedures,Observation of Work Activities & Data Review IR 05000483/19900161990-10-22022 October 1990 Insp Rept 50-483/90-16 on 901001-05.No Violations Noted. Major Areas Inspected:Insp of Licensee Corrective Actions Initiated for Issues Identified in self-initiated Safety Sys Assessment of ESW Sys IR 05000483/19900151990-10-18018 October 1990 Insp Rept 50-483/90-15 on 900816-0930.No Violations Noted IR 05000483/19900141990-08-31031 August 1990 Insp Rept 50-483/90-14 on 900724-27.No Violations Noted. Major Areas Inspected:Licensee fitness-for-duty Program,Drug & Alcohol Abuse Policies,Testing Program & Randon Testing Program IR 05000483/19900131990-08-28028 August 1990 Insp Rept 50-483/90-13 on 900701-0815.Violations Noted. Major Areas Inspected:Lers,Followup on Previous Insp Findings,Followup on Generic Ltrs,Plant Operations,Maint/ Surveillance & Regional Requests IR 05000483/19900121990-07-13013 July 1990 Insp Rept 50-483/90-12 on 900516-0630.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations, ESF Walkdown & Maint & Surveillance Performed IR 05000483/19900031990-02-13013 February 1990 Insp Rept 50-483/90-03 on 900124-25 & 900131 Telcon.No Violations Noted.Major Areas Inspected:Radiochemistry & Radiological Environ Monitoring Programs,Including Qa/Qc Program in Counting Room,Procedures,Organization & Training IR 05000483/19890171989-09-22022 September 1989 Insp Rept 50-483/89-17 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization,Training,Primary & Secondary Sys Water QC Programs & Qa/Qc Program in Lab IR 05000483/19890161989-09-0707 September 1989 Insp Rept 50-483/89-16 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection & Radwaste Mgt Programs Including Changes Since Last Insp, Audits & Appraisals,External Exposure Control & ALARA IR 05000483/19890141989-08-28028 August 1989 Insp Rept 50-483/89-14 on 890717-0803.No Violations or Deviations Noted.Major Areas Inspected:Design Changes & Mod & Dedication of Commercial Grade Equipment for safety- Related Applications IR 05000483/19890111989-07-27027 July 1989 Insp Rept 50-483/89-11 on 890601-0715.No Violations Noted. Major Areas Inspected:Nonroutine Events,Plant Operations & Maint/Surveillance IR 05000483/19880081989-07-21021 July 1989 Addendum to Insp Rept 50-483/88-08 Comparing Results of Analyses Performed on Liquid Spike & Monitor Tank Sample IR 05000483/19890121989-07-18018 July 1989 Partially Withheld Safeguards Insp Rept 50-483/89-12 on 890626-0707 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Protected Area Assessment Aids,Power Supply, Training & Qualification IR 05000483/19890091989-06-22022 June 1989 Safety Insp Rept 50-483/89-09 on 890401-0531.No Violations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance & Onsite Followup of Nonroutine Events IR 05000483/19890081989-06-0101 June 1989 Insp Rept 50-483/89-08 on 890328-0515.No Violations Noted. Major Areas Inspected:Inservice Insp Activities,Including Review of Procedures,Observation of Work Activities & Review of Data IR 05000483/19890101989-05-30030 May 1989 Insp Rept 50-483/89-10 on 890501-05 & 11.No Violations Noted.Major Areas Inspected:Radiation Protection Program During Refueling/Maint Outage Including,Changes in Organization,Audits & Appraisals IR 05000483/19890071989-04-14014 April 1989 Insp Rept 50-483/89-07 on 890403-06.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program, Including Emergency Plan Activations,Licensee Actions on Previously Identified Items & Operational Status of Program IR 05000483/19890041989-04-13013 April 1989 Safety Insp Rept 50-483/89-04 on 890216-0331.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint/Surveillance,Emergency Preparedness,Security & Safety Assessment/Quality Verification IR 05000483/19890031989-03-21021 March 1989 Partially Withheld Physical Security Insp Rept 50-483/89-03 on 890213-23 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Barriers,Access Control,Personnel,Packages,Vehicles & Alarm Stations IR 05000483/19890011989-03-0606 March 1989 Safety Insp Rept 50-483/89-01 on 890101-0215.Weaknesses Noted.Major Areas Inspected:Previous Insp Findings,Lers, Plant Operations,Radiological Controls,Maint Surveillance, Emergency Preparedness & Security IR 05000483/19890021989-03-0202 March 1989 Insp Rept 50-483/89-02 on 890124-0215.Violations Noted. Major Areas Inspected:Environ Qualification of Electrical Equipment within Scope of 10CFR50.49 (Modules 30703 & 92701) IR 05000483/19880151988-09-22022 September 1988 Insp Rept 50-483/88-15 on 880731-0831.Violations Noted.Major Areas Inspected:Ler,Plant Operations,Radiological Controls, Maint/Surveillance,Emergency Preparedness,Security, Engineering & Technical Support & Safety Assessment IR 05000483/19880171988-09-16016 September 1988 Insp Rept 50-483/88-17 on 880822-26.No Violations Noted. Major Areas Inspected:Chemistry Program,Including Procedures,Organization & Training,Reactor Sys Water QC Programs & Qa/Qc Programs in Labs IR 05000483/19880161988-09-16016 September 1988 Insp Rept 50-483/88-16 on 880815-19.No Violations Noted. Major Areas Inspected:Maint Activities Using Selected Portions of Insp Modules 62700,62702,62705 & 62720 IR 05000483/19880141988-08-11011 August 1988 Insp Rept 50-483/88-14 on 880703-30.No Violations or Deviations Noted.Major Areas Inspected:Lers,Plant Operations,Radiological Controls,Maint/Surveillance, Emergency Preparedness,Security & Technical Support IR 05000483/19880091988-07-12012 July 1988 Insp Rept 50-483/88-09 on 880606-09.No Violations, Deficiencies or Deviations Noted.Major Areas Inspected: Emergency Preparedness Program,Emergency Response Facility Appraisal & Review of Radioactive Release Assessment IR 05000483/19880111988-06-17017 June 1988 Partially Withheld Physical Security Insp Rept 50-483/88-11 on 880523-27 (Ref 10CFR73.21).Noncompliance Noted:Four Licensee Designated Vehicles Failed to Meet Security Plan Criteria for Such Designation IR 05000483/19880101988-06-16016 June 1988 Insp Rept 50-483/88-10 on 880606-07.No Violations, Deficiencies,Deviations or Exercise Weaknesses Noted.Major Areas Inspected:Plant Emergency Exercise.Objectives of Exercise Encl IR 05000483/19880131988-06-16016 June 1988 Insp Rept 50-483/88-13 on 880525.Allegations Not Substantiated.Major Areas Inspected:Allegation Re Aberrant Behavior by Named Individual W/Unescorted Access to Plant IR 05000483/19880071988-06-0707 June 1988 Insp Rept 50-483/88-07 on 880403-0521.No Violations Noted. Major Areas Inspected:Plant Operations,Esf Sys Walkdown,Qa, Administrative Controls Affecting Quality,Surveillance, Maint,Fire Protection Radiological Controls & Security ML20155D4101988-05-31031 May 1988 Insp Rept 50-483/88-08 on 880502-06.No Violations or Deviations Noted.Major Areas Inspected:Confirmatory Measurements & Radiological Environ Monitoring Programs, Including Plant Chemistry,Organization & Mgt Control IR 05000483/19880041988-04-25025 April 1988 Insp Rept 50-483/88-04 on 880207-0402.Violations Noted. Major Areas inspected:LERs,inspector-identified Problems, Plant Operations,Esf Walkdown,Radiological Controls,Maint, Fire Protection,Emergency Preparedness & Security ML20150C8181988-03-17017 March 1988 Partially Withheld Insp Rept 50-483/88-05 on 880218,0222-26 & 0303 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Effectiveness - Security Program,Records, Protected Area Barriers & Alarms & Lighting Assessment Aids IR 05000483/19870361988-02-23023 February 1988 Insp Rept 50-483/87-36 on 871205-880206.No Violations Noted. Major Areas inspected:LER,inspector-identified Problems, Plant Operations,Esf Sys Walkdown,Radiological Controls, Maint,Surveillance,Fire Protection & Security IR 05000483/19880031988-02-19019 February 1988 Insp Rept 50-483/88-03 on 880125-0202.Violations Noted. Major Areas Inspected:Emergency Preparedness Program Including,Emergency Plan Activations,Licensee Actions on Previously Identified Items & Required Drills IR 05000483/19880021988-02-0404 February 1988 Safety Insp Rept 50-483/88-02 on 880105-14.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Control Rod Testing,Core Power Distribution Limits & Calibr of Nuclear Instrumentation Sys IR 05000483/19870321987-12-31031 December 1987 Safety Insp Rept 50-483/87-32 on 871004-1204.Violations Noted But No Notice Issued.Major Areas Inspected:Lers,Plant Operations,Esf Sys,Radiological Controls,Maint,Surveillance, Fire Protection,Emergency Preparedness & Security IR 05000483/19870291987-12-16016 December 1987 Insp Rept 50-483/87-29 on 870921-1203.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Work Activities,Training & Qualification Effectiveness & Facility Mods (73501,73057,73753,73755,41400,37701,55700 & 57700) IR 05000483/19870311987-11-19019 November 1987 Insp Rept 50-483/87-31 on 871006-09.Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Changes in Organization,Personnel,Facilities,Equipment, Programs & Procedures IR 05000483/19870351987-11-19019 November 1987 Enforcement Conference Rept 50-483/87-35 on 871110. Violations Noted.Major Areas Discussed:Condition in Which Mispositioned Flow Balancing Damper Affected Performance of One Train of Control Room Emergency Ventilation Sys IR 05000483/19870331987-11-0404 November 1987 Safety Insp Rept 50-483/87-33 on 871007-17.Violations Noted: Failure to Perform Adequate Preoperational Test & Failure to Promptly Rept Condition Adverse to Quality.Major Areas Inspected:Mispositioned Balancing Damper IR 05000483/19870341987-10-27027 October 1987 Enforcement Conference Rept 50-483/87-34 on 871002 Re Events in Which Mispositioned Valve Resulted in Reduced Flow Capability of One Essential Svc Water Train & Breached Seals Resulted in Emergency Ventilaton Sys Inoperability IR 05000483/19870301987-09-29029 September 1987 Safety Insp Rept 50-483/87-30 on 870922-24.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance & Functional Testing Program & Training IR 05000483/19870201987-09-29029 September 1987 Insp Rept 50-483/87-20 on 870601-0801.No Violations or Deviations Noted.Major Areas Inspected:Previous Insp Findings,Operational Safety,Esf Sys Walkdown,Radiological Control,Maint,Fire Protection,Security & Quality Programs ML20235J7981987-09-25025 September 1987 Insp Rept 50-483/87-23 on 870908-11.Violations Noted.Major Areas Inspected:Licensee Action Following 870709 Surveillance Test Which Indicated That Both Independent Control Room Emergency Ventilation Sys Inoperable IR 05000483/19870281987-09-25025 September 1987 Insp Rept 50-483/87-28 on 870824-0911.Violation Noted Re Failure to Identify & Correct Incorrect Essential Svc Water Valve Position.Major Areas Inspected:Essential Svc Water Sys Operability IR 05000483/19870251987-09-17017 September 1987 Safety Insp Rept 50-483/87-25 on 870812-21.Violation Noted. Major Areas Inspected:Isolation of Safety Injection Sys Combined Recirculation Valve BN-HV-8813 IR 05000483/19870241987-09-0303 September 1987 Insp Rept 50-483/87-24 on 870730 & 0804-07.Violations Noted. Major Areas Inspected:Nonconservative Setting of Overtemp delta-temp Reactor Trip Setpoint & Adequacy of Corrective Actions Specified in LER 87-012-01 IR 05000483/19870271987-09-0101 September 1987 Partially Withheld Insp Rept 50-483/87-27 on 870811-18. Violation Noted.Major Areas Inspected:Circumstances Re Event Involving Safeguards Info Documents Not Adequately Protected at Offsite Location IR 05000483/19870221987-08-20020 August 1987 Insp Rept 50-483/87-22 on 870714-17.No Violations Noted. Major Areas Inspected:Ie Bulletin 85-003, Motor-Operated Valve Failures During Plant Transients Due to Improper Switch Settings 1990-08-31
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators PNO-IV-99-035A, on 990810,heater Drain Line Pipe Rupture Occurred.Caused by Flow Accelerated Corrosion in Conjunction with Moisture Impingement.Licensee Has Completed Replacement of Damage Heater Drain Piping & Conducted Insps of Piping1999-08-18018 August 1999 PNO-IV-99-035A:on 990810,heater Drain Line Pipe Rupture Occurred.Caused by Flow Accelerated Corrosion in Conjunction with Moisture Impingement.Licensee Has Completed Replacement of Damage Heater Drain Piping & Conducted Insps of Piping IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support PNO-IV-99-035, on 990810,operators Initiated Manual Rt When High Pressure Heater Drain Line Ruptured in Turbine Bldg. Licensee Is Evaluating Options for Facilitating Repair & Restarting Plant.Region IV Will Conduct Special Insp1999-08-11011 August 1999 PNO-IV-99-035:on 990810,operators Initiated Manual Rt When High Pressure Heater Drain Line Ruptured in Turbine Bldg. Licensee Is Evaluating Options for Facilitating Repair & Restarting Plant.Region IV Will Conduct Special Insp IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19993021999-05-0303 May 1999 Exam Rept 50-483/99-302 on 990416.Exam Results:Ro License Applicant Passed Retake Written Exam & Test Matl Adequate IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19993011999-02-0202 February 1999 NRC Operator Licensing Exam Rept 50-483/99-301 for Exams Administered on 990111-15 ML20199D9261999-01-12012 January 1999 Notice of Violation from Insp on 981115-1226.Violation Noted:Licensee Failed to Perform Written Safety Evaluation, from 840611-980505 IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 ML20198A1231998-12-0404 December 1998 Notice of Violation from Insp on 980914-1002.Violation Noted:Listed Activities Affecting Quality Either Not Prescribed by Documented Instructions Appropriate to Circumstances or Not Accomplished with Procedures PNO-IV-98-059, on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee1998-11-30030 November 1998 PNO-IV-98-059:on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program ML20196G3471998-11-25025 November 1998 Notice of Violation from Insp on 981026-30.Violation Noted: on 981030,control Room Pantry Fire Door,Identified as Being Nonfunctional Without Fire Barrier Impairment Permit or Conpensatory Actions,As Required by Procedure APA-ZZ-00701 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support ML20237B8931998-08-14014 August 1998 Notice of Violation from Insp on 980803-07.Violation Noted: on 980804,inspector Noted Three Containers of Dry Active Waste Stored within 10 Feet of Permanent Structure IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support ML20236V3251998-07-29029 July 1998 Notice of Violation from Insp on 980714-17.Violation Noted: Grinding Needle Gun Work Performed on 2,000 Ft Elevation of Cb Liner Floor Plate W/O Performing Surveys to Evaluate Concentration or Quantities of Radioactive Matl IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20248L2621998-06-0808 June 1998 Notice of Violation from Insp on 980412-0523.Violation Noted:On 980419,workman Protection Assurance 26226 Was Inadequate to Ensure Safety During Work on Valve EJHV8804A IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4491998-04-22022 April 1998 Notice of Violation from Insp on 980324-26.Violations Noted: on 970529,licensee Made Changes to Emergency Plan W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program ML20217F1921998-03-26026 March 1998 Notice of Violation from Insp on 980202-06.Violation Noted: Licensee Did Not Demonstrate That Either Train of Auxiliary Fuel Bldg Emergency Filter Sys Adsorbers Could Comply W/Ts 4.7.7.b.2 Until Charcoal from Each Train Was Replaced IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber ML20216A7971998-03-0909 March 1998 Notice of Violation from Insp on 980118-0228.Violation Noted:On 980216,instructions to Work Authorization C612323 Did Not Provide Adequate Guidance for Concrete Core Drilling Work,As Result,Licensee Personnel Drilled Into Power Cable IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 07100026/20120061997-12-16016 December 1997 Notice of Violation from Insp on 971026-1206.Violation Noted:Licensee Personnel Failed to Follow Documented Instructions During Preventive Maint Task to Record Differential Pressure Across Essential Svc Water Supply 1999-09-22
[Table view] |
Inspection Report - - 2005027 |
---|
|
|
Text
-
F
'
. ,-
U.S. NUCLEAR REGULATORY COMMISSION i
REGION III
Report No. 50-483/85012(ORP)
Docket No. 50-483 License No. NPF-30 Licensee: Union Electric Company Post Office Box 149 - Mail Code 400 St. Louis, MO 63166 Facility Name: Callaway Plant, Unit 1 Inspection At: Callaway Site, Steedman, M0 Inspection Conducted: March 10 through May 27, 1985 Inspector: B. H. Little Approved By: J. F. Sue , 'c Reactor' Projects Section 2A cN+MSq /fGF DAte Inspection Suneary: !
Inspection on March 10 through May 27, 1985 (Report No. 50-483/85012(ORP)) -
Areas Inspected: Routine unannounced inspection by the resident inspector !
of previous inspection findings. The inspection involved a total of 260 -
inspector-hours by one NRC inspector including 62 inspector-hours onsite r during off-shift Results: Two violations (only one of which was cited) were identified (failure to provide adequate acceptance criteria in the QC program / procedures -
Paragraph 5).
\
8510280268 8 3 PDR ADOCK O 3 0 ppR
, m-
'
. .'
DETAILS 1. Persons Contacted D. F. Schnell, Vice President - Nuclear
- S. E. Miltenberger, Manager, Callaway Plant
- R. L. Powers, Assistant Manager - Quality Assarance
- P. T. Appleby, Assistant Manager - Support Services
- J. E. Davis, Compliance Superintendent i
J. C. Gearhart, Supervisory Engineer - QA J. R. Veatch, Supervisor Engineering (QA)
J. V. Laux, Supervisor QA
- T. L. Shaw, Supervisor, QC
- T. W. Stotlar, QA Enigneer
- F. D. Field, Manager, Quality Assurance
- Denotes those present at one or more management interview In addition, a number of QA, Engineering and QC personnel were contacte . Background Summary:
This matter relates to an allegation that Quality Control (QC)
procedures were not followed in the certification of three QC assistant supervisors, and concerns regarding the qualifications of the QC assistant supervisors in some areas for which they had been certified. The allegation and concerns were made verbally by QC inspectors to members of the licensee's Quality Assurance (QA) department and subsequently to the NRC Senior Resident Inspecto Following receipt of the QC inspectors' allegation and concerns, the QA department performed a surveillance of QC programs and procedures including certification and qualification records of currently employed QC inspector The surveillance substantiated the QC inspectors' allegation and concerns and, in addition, identified other QC program / procedure deficiencies. As a result of the additional deficiencies the licensee ordered a complete review of all Union Electric Company (UE) QC (operations) inspectors'
(both past and present) certifications and qualifications and a review of all work authorizing documents. A QA/ Engineering evaluation team was assigned the review and evaluation of the inspection activities performed by QC inspectors having questionable certifications. The licensee determined that the inspections presented no significant impact on plant components, system function or qualit The allegation and a description of the deficiencies were documented in NRC Inspection Report No. 50-483/85002 and were designated as Open Item 483/85002-0 . .
.
.
. ,
b. Chronology of Events December 1984: QC inspectors discussed the following complaints with QC supervision:
- The selection and assignment of QC assistant supervisor * The elimination of lead inspector position * Backshift and weekend inspection assignment QC supervision / management held meetings to resolve QC inspectors'
complaint QC inspectors discussed items with QA department representativo * QA was aware of ongoing QC/ management meetings to resolve the QC inspectors' item * QA viewed the items as being QC departmental issue Late January 1985: QA was verbally informed of the QC inspectors'
concerns regarding the qualifications'of the QC assistant supervisor February 4, 1985: QA received, from QC inspectors, a verbal allegation that QC procedures were not followed in the certification of the QC assistant supervisor QA Supervisor (operations) ordered a QA Surveillance in the area of certifications and qualifications of QC inspector February 5, 1985: NRC resident inspectors received verbal allegation and concern from a QC inspector regarding the QC procedure violation and related qualification issu February 6, 1985: NRC Senior Resident Inspector was advised by two QC inspectors that members of the licensee's QA department had received the QC allegation and concer NRC inspector met with QA management, and was advised that QA had commenced an in-depth surveillance of the issue February 8, 1985: QA issued Request for Corrective Action (RCA)
No. P-8502-028 which documented the procedure violation and substantiated the QC inspector's allegatio Licensee held informal discussions with QC supervision stressing procedure adherenc _ . _ - - -
,
.
.
. .
February 22, 1985: QA issued Surveillance Report No. 850209 (Review of Certifications of Union Electric Nuclear Operations (UEN0) Quality Control Inspectors). The report identified additional deficiencies which were documented in the following RCAs:
RCA N Description P-8502-034 Insufficient Records to Support QC Certification P-8502-035 QC Inspectors Don't Have Needed Experience P-8502-039 Certification / Qualification Program Deficiencies February 26, 1985: Licensee response to QA surveillance findings:
- Licensee suspended the QC certifications of seven QC inspectors who were identified by QA as having questionable certificatio * Licensee ordered: a) a complete review and evaluation of the certifications and qualification of all operational QC inspectors (past and present), b) a review of all operational work authorizing documents to identify those documents which involved UENO QC inspectors having questionable certifications, and c) the assignment of a QA/ Engineering task group to review the inspection activities of the QC inspectors having questionable certifications to assess the safety / quality impact on plant hardwar March 7, 1985: Local newspapers contained articles relating to unqualified QC inspectors at the Callaway Plan April 17, 1985: The NRC inspector accompanied licensee personnel during their field verification inspection of eight completed safety-related maintenance / inspection activitie No deficiencies were identifie . Inspection of Quality Control Inspection Program and Practices An inspection of matters relating to the licensee's QC inspection program was performed by the NRC Senior Resident Inspector to assess the following:
- The existence and nature of the QC inspectors' concern l
- The implementation of the licensee's QC progra * The QC certification and program deficiencie l
- The safety / quality impact of the deficiencies on plant hardwar . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
,
.
. .
- The licensee's response, both technically and administratinly, to the issue The inspection included the following:
- Meetings with representatives of the licensee's Corporate, Plant and QA Managemen *
Interviews with QC Personne * Inte dews with QA and Engineering Personne * Document Revie * Field verification inspection of a sample of completed work request Details relating to these five areas are as follows: Meetings with Representatives of Licensee's Corporate, Plant, and QA Management:
The NRC inspector met with licensee management upon notification of the QC deficiencies and on several occasions during the inspection period. Through the initial meetings and observation of the licensee's immediate response, the inspector determined that QA's review of the issues was thorough, and received prompt management attention and support. The licensee's immediate corrective action included the suspension of certifications for QC inspectors, including assistant supervisors, identified as having questionable QC certifications. The resident inspector was advised that: the existing QC programs and procedures would receive a thorough review and be revised as appropriate to assure conservative standards were applied to future QC certifications; conservative qualification standards would be applied during the review of past and present QC inspectors' certifications; and, all inspections performed by those having questionatle certifications would be evaluated for potential hardware problem Through further discussions with the licensee's management and observation of the licensee's actions, the inspector determined that the QC program deficiencies, identified during the QA surveillance, received prompt and thorough evaluation. This evaluation included reviewing ongoing QC activities and assuring that existing policies, administrative controls and procedures governing those activities were being fully implemente Interviews with QC Personnel:
The NRC inspector held interviews with: all QC inspectors who were currently employed in the Civil, Electrical, Mechanical, NDE, and receipt inspection groups; QC assistant supervisors; and the QC Supervisor. These interviews were conducted to obtain 5 ss_- - x~1 - a a - - ~ , s= . -.
--
e , _a ~ - - . . - . - -
-
,
o .
information relative to the existence and nature of QC inspectors'
issues, and to assess the issues for potential quality impac : The QC inspectors were specifically asked if they were aware of
,
any order or directive which prohibited seeking technical advice or information from QA or which discouraged access to higher levels of management. The QC inspectors stated they were not aware of any orders or directives which specified or implied any such f restrictions. The QC inspectors were questioned to obtain their 1 views regarding a QC supervisor's memo dated March 10, 1984 cn the subject of " Communication," which was referred to in a newspaper article on QC issues. The memo mentioned past instances of counterproductive communication, advised QC inspectors of their obligation to take QC problems to their supervisors and restated
, QC and UE management's "open door policy." QC inspectors expressed an overall support of the memo's subjects and did not view this as discouraging contact with upper management, QA, or
! the NR The QC inspectors expressed confidence in their working environment, relating to their ability to identify, document and obtain
]
resolutions of quality and safety issues.
I The QC inspectors were questioned to obtain their views regarding QC l inspector training and qualifications and to determine if the i inspectors had concerns or had complained about unqualified inspectors to their supervision. The inspectors' response regarding training and qualification of themselves and other inspectors in their groups was generally positive. All the inspectors expressed l confidence in being qualified to perform the inspections they had performed, based on their past experience and training, the nature
-
of inspections (not complicated), and adequacy of inspection
criteria and checklist In response to questions on training, all QC inspectors indicated that they had received adequate to very good training for the
- inspections they were performing. This training consisted mainly of
- self-study (required reading) and on-the-job-training (inspections
! with qualified inspectors). One QC inspector said he felt " pushed"
) to complete the required reading assignment. Another inspector said j he would have liked additional training on processing QC paperwork.
Both inspectors indicated they had not discussed their views with i their supervisor.
} Two QC inspectors expressed a desire for training in process j measuring instruments used in the instrumentation and control
(I & C) area. Both inspectors indicated they were qualified to perform their required QC inspections, basically: electrical termination; like-kind replacements; and electrical scheme check ,
Though qualified, the inspectors expressed the view that they 1 would be more comfortable performing I&C inspections if they were given training in addition to what was already provided. The l
i i
i
_,, ,_ _.-- . - . - - - . . .- _ _ -,_ _,.---_-_,- --_ ..-,.rm _-- - - - -.,,~
r.- 7
.
-
.
. .
inspectors also felt that this additional training would provide a basis to support an expanded inspection program. One of the inspectors had communicated these views to QC supervision on several occasions during the past year and has recently been advised that training in this area was scheduled for May 198 The NRC inspector questioned each QC inspector to determine if concerns about unqualified inspectors had been made to QC supervision or members of the QA department, and, if so, when the concerns had been made and what was their natur The QC inspectors' response to these questions indicated that two QC inspectors informally notified members of the QA department of their concerns in late January 198 The nature of their concerns was that QC procedures were not followed in the certification of assistant QC supervisors and that the QC inspectors believed that the assistant supervisors recently certified lacked experience and knowledge in the areas for which they had been certifie Three QC inspectors indicated they had discussed general concerns relating to divisional issues with QA personnel on or about late December 1984. The concerns related to the selection and assignment of the assistant QC supervisors, the planned elimination of lead inspector positions and weekend /backshift assignments. The QC inspectors said the nature of complaints at that time (December 1984) did not relate to unqualified inspectors nor did they identify program or procedure violations. The QC inspectors said the issues which were brought to QA's attention at that time were also being discussed with QC supervision during meetings held by tpper levels of plant managemen The NRC inspector questioned QA personnel regarding their view of the QC concerns brought to their attention in late December 198 These QA personnel indicated that the concerns did not identify quality issues but appeared to be departmental in nature involving employer / employee relation The QA personnel said they were aware that, at the time of the complaints, QC supervision and line management were meeting with QC inspectors to identify and resolve these issue Based on the information provided by QC personnel during these interviews, the NRC inspector determined: that the QC inspectors'
working environment was conducive to the identification and resolution of quality issues; that the QC inspectors were adequately trained and qualified for the performance of assigned inspection activities; and, that the QA department's response to the QC inspectors' concern of QC procedure violation (failure to follow procedure QCP-ZZ-01001 when certifying three individuals as Level III inspectors) was prompt and thoroug __ -- _ _ . - = _ _ _ _
,
.
!
l
,
c. Interviews with QA and Engineering Personnel:-
- The inspector held individual and group interviews with members of j the licensee's QA and Engineering departments who were assigned to the QA/ Engineering evaluation team. These interviews were performed +
to ascertain team members' independence and the scope and depth of the evaluation process. Team members were cognizant of their independent review responsibilities and expressed confidence in their ability to freely exercise independent judgement in the evaluation process.
1 The inspector determined that a complete personnel records review I was performed which identified all past and present QC inspectors
- who had been employed by or for the UEQC operations grou Under j the direction of the licensee's Superintendent of Compliance, the i QC department, with QA department overview, performed an evaluation '
i of the QC inspectors' training and qualifications. The evaluation l process applied conservative criteria based on ANSI N45.2.6 - 1978
- and the licensee's commitment to this Standard. The initial QA i review of presant inspectors identified seven QC inspectors with
} questionable certification including two of the assistant QC i '
supervisors identified in the January 1985 concern (See Section 2.b).
The complete review of all UEQC (operations) inspectors (past and
present) re-identified the original seven inspectors and fifteen
- previously enployed QC inspectors. A manual search of approximately 9,700 work authorizing documents (UEN0) was performed to identify those documents which indicated involvement by QC inspectors having questionable certification The work documents indicating
'
involvement by QC inspectors having questionable certifications were submitted to a QA/ Engineering Evaluation Team consisting of two QA Engineers and two Plant Engineers for evaluation. Each document was individually reviewed by each member of the team, with final disposition requiring agreement of all team member The QA/ Engineering evaluation was performed to assess the potential
<
adverse effects the inspection activities may have had on installed
- hardware and to determine the need for reinspection. The evaluation I criteria ircluded:
i
- (1) Acceptability of Hold / Witness / Monitoring points, based on
{ agreement of the reviewers that the appropriate inspection
,
attributes were identifie (2) Acceptability of the maintenance inspection checklist,
'! based on agreement of the reviewers that the checklist contains appropriate inspection attributes and acceptance criteria to perform the task,
,
e
f i
i
\
O I
r . .
.
.
. .
(3) Acceptability of inspectien, based on agreement of the reviewers that the inspection was: a) within the skills of the QC inspector (like-kind replacement, routine activities performed by skilled craft, e.g., turn-of-the-nut torquing, routine terminations, etc.), b) conducted with adequate inspection instructions, or c) without potential impact on equipmen The NRC inspector determined, based on a review of QA surveillance Report No. 850209B, that the QA/ Engineering evaluation team had reviewed 681 Work Requests, 53 Preventive Maintenance Task Sheets, and 165 Startup Maintenance Authorization The QA/ Engineering evaluation determined that the inspections performed were within the capability of the inspectors (e.g.,
routine surveillance of crafts, system cleanliness, routine torquing of bolts or terminations) or that the QC inspection checklist for more complex inspections contained adequate inspection attributes and acceptance criteri Although the QA review identified seven currently employed QC inspectors as having questionable " broad" certifications, the review determined that those inspectors were qualified / capable of performing the inspection activities assigned and could be recertified based on their experience and education as QC level II inspectors in " specific" area The licensee recertified one QC level 11 civil inspector for limited inspection, but chose to maintain the broad scope classification for other inspection areas and as such has not recertified the other QC inspectors at this tim The evaluation team concluded that the inspections presented no significant impact on plant components, system function or qualit The team findings are reported in QA Surveillance Report No. 850209 d. Document Review:
The inspector reviewed the following documents:
- Operations Quality Assurance Manual
- Callaway Plant Technical Specifications (Section 6 - Audits)
- SNUPPS-C-FSAR, Appendix 3A
- NRC Standard Review Plan Section 17 (Quality Assurance)
l l
.
.. ..
.
.
.
. .
- Plant Procedures QCP-ZZ-01001 Certification of QC Personnel QCP-ZZ-01002 Qualification of QC Personnel
- QA Audit Report No. 0QA-0009A, A-0054, A-8407D and A8309-04
- QA Surveillance Reports Nos. 820102, 850209-A and B
+ RCA Nos. P-8502-028, 034, 035 and 039
- Eight QC inspectors' certification / qualification records
- Completed Work Requests (WRs) - Sixty-eight WRs selected from the following plant systems:
High Pressure Coolant Injection Auxiliary Feedwater Chemical and Volume Control Standby Emergency Diesel Generator By review of the licensee's program commitments and procedures, the NRC inspector determined the following: In SNUPPS-C-FSAR, Appendix 3A, th licensee committed to Regulatory Guide 1.58 (ANSI N45.2.6 - 1978)
with the following clarification:
"In instances where the education and experience recommendations of ANSI N45.2.6-1978 are not met by QC personnel, UE will demonstrate by documented results of written examinations and evaluations of actual work proficiency that these individuals possess comparable or equivalent competence. SNT-TC-1A (1975) will be used to ;
qualify and certify NDE personnel."
Plant Administrative Procedure AP-E-301 issued June 24, 1981, and subsequent QC procedures for the qualification of QC inspectors restated ANSI N45.2.6 - 1978, Section 3.5 " Education and Experience - Recommendations," and referenced this Standar These procedures also referred to the above " clarification" statemen The inspector determined that the plant procedures contained no quantitative / qualitative acceptance criteria relating to the determination of initial capabilities or for the evaluation of work proficiency of comparable or equivalent competence other than a reference to ANSI N45.2.6-1978. The licensee's QA organization documented these procedural deficiencies in RCA No. P-8502-03 Operations Quality Assurance Manual (0QAM) was implemented in February 1984, and contains the following commitment:
"The audit system shall include internal and external audit The system shall be planned, documented, and conducted to
.
.
. .
assure coverage of the applicable elements of the 0QAP
[ operations QA program], and overall coordination and scheduling of audit activities are being accomplished in accordance with requirements described herei Internal audits shall be conducted by the Quality Assurance department and shall be performed with a frequency commensurate with their safety significanc An audit of safety-related functions shall be completed in accordance with formal audit schedules within a period of two (2) years. Each element of the 0QAP, such as design control and document control, and each area of plant operations shall be audite Supplementary to the biennial requirement to audit safety-related functions, other activities shall be auditod at the frequencies indicated in Section 6 of the Technical Specifications and under the cognizance of the Nuclear Safety Review Board."
The above commitment is in agreement with the Callaway Plant Technical Specifications, Section 6, which, in part, require audits that encompass:
"The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix B, 10 CFR Part 50, at least once per 24 months."
The resident inspector reviewed current and past QA audits and surveillances relating to QC inspectors' certifications and qualifications to evaluate deficiencies previously identified, their relationship to recent deficiencies, and to assess licensee's corrective action:
QA audit schedule dated June 29, 1984 indicated: a completed audit of QC and Compliance in May 1984; a scheduled audit in July 1984 (actually performed in August 1984) and, a scheduled audit in May 1985. The May 1984 audit was limited to the area of the identification and control of nonconforming item The August 1984 audit (No. AD5A84070) included the qualifications of QC-NDE inspectors. No discrepancies were identified regarding inspector qualifications. The May 1985 audit was in progress at the time this inspection was complete *
QA Audit Report No. A8309-04, performed in September 1983, included an evaluation of the " capability level" (ANSI N45.2.6)
of inspectors in the Test Program Surveillance Group (TPSG).
The TPSG provided QC inspections during preoperational testin The audit determined that all of the inspectors' qualifications were acceptabl *
QA Audit Report No. 0QA-0009, performed in April /May 1981, identified QC deficiencies which were documented as five open items and a related unresolved item. Four of the
.
.
.
O .
deficiencies related to procedures, and one identified a procedural violation relative to processing QA record The unresolved item related to the availability of QC certification and training record The NRC inspector determined that the 1981 audit findings relative to QC certification identified the absence of QC certification letters and training records in the QA record file (QA RCA Nos. P8502-034 and 035 identified that some QC inspectors lacked documented experience and lacked experience to support the QC certifications.) The procedural deficiencies identified in the 1981 audit related to procedural disagreement and inspection activitie (QA RCA No. P8502-039 identified deficiencies related to the lack of qualitative and quantitative acceptance criteria for the UEN0 QC certification /
qualification program.)
QA department follow-up review of the licensee's response to the 1981 audit findings determined that acceptable action had been take * QA Surveillance Report No. 820102, performed in January 1982, included a review of the QC training program and the certification of QC inspectors. The report identified that the letters of Certification lacked the employer's name, that test results were not documented for UE courses, and that the date of certification expiration, was not specifie The report also identified the need for validation of the QC inspector's resume when a resume is used as the basis for certification. However, QA did not identify procedure deficiencies regarding the Letters of Certificatio The NRC inspector's review of the licensee's response to these surveillance findings determined that validation of employees previous education and employment is performed by the licensee's Personnel and Security departments. The licensee's corrective action, regarding the deficienc 's ir. the Letters of Certification, did not address the cause of the deficiencies, i.e., inadequate procedures for that activity, but only corrected the specific deficiencies for the certifications identified. (QA RCA No. P8502-39 (February 22, 1985) identified that the UEN0 - QC certification program procedures did not specify the minimum information to be contained on written certifications.)
It is noted that tne criteria (i.e. , individual certification /
qualifications), against which the QA department performed its 1985 surveillance, were different (more prescriptive) than the criteria used in the previous surveillance. Notwithstanding this fact, the NRC inspector determined that all but one certification / qualifications of the QC inspectors reviewed by the QA department and found acceptable in previous audit and surveillance were found acceptable during the surveillance performed in 198 __________________ _ _____
- . .
.
.
. .
The inspector determined that the licensee referenced ANSI N45.2.6-1978 but did not provide specific qualitative acceptance criteria for the UENO - QC certification progra This condition was not detected and/or corrected until identified by QA in 1985 and reported in QA Surveillance Report No. 850209.
t The inspector's review of QA Surveillance Report Nos. 850209A and B and the resulting Requests for forrective Action (RCA's)
determined that the QA department had performed a thorough review and evaluation of the QC Certification and Qualification progra Surveillance Report No. 850209A cor.tair s the !icensee's findings regarding the evaluation of the certifications of past and present QC inspectors. Eighty-five (85) inspectors with 247 certifications were evaluated; 207 certifications met UENO program commitments, 22 inspectors with 29 certifications were found questionable, and 11 certifications were found questionable but the inspectors had not performed inspections related to the certification The QA surveillance identified and documented a QC procedure violation in the certification of QC inspectors wherein the signature of a certified Level III inspector was not obtained as required by procedure QCP-ZZ-0100 The QA surveillance also documented that QC certification and qualification procedures lacked quantitative and qualitative acceptance criteria ir the following areas:
- Work experience used to satisfy the experience and education requiremen * Documented evaluation of actual work experienc * Guidance for formal trainin * Determination of initial trainin The inspector determined that the above procedure violation and QC procedure deficiencies presented a potential for impact on qualit Based on the review of the QC inspections performed, the related inspection criteria and checklists, and interviews with QC inspectors, the inspector determined that an adverse quality system /
hardware impact was unlikel The NRC inspector inspected eight records of the seventy-five QC inspector certification / qualification records that were identified during the licensee's review for inspectors having certifications which comply with UENO program commitment The inspector reviewed fifteen QC certifications in Civil, Electrical, Mechanical, and Receipt disciplines. This review included the certifications of three QC Level III inspectocs and a QC assistant supervisor. No certification deficiencies were identifie . . . . . .
.
. . . . .
,
.
. . Field Verification Inspection of a Sample of Completed Work Requests: '
The NRC inspector, accompanied by licensee personael, performed an in plant inspection of eight completed safety-related maintenance / inspection activities, which had been worked on by QC inspectors with questionable certification Licensee Inspection Team:
QA Electrical Engineer QA Civil Engineer QC Level III Electrical Inspector QC Level II Civil Inspector Electrical and I & E Technicians The following items were verified:
Motor starter phase wiring 30 AMP breakers replacement Electrical cabinet heater size and type Fire barrier penetration seal Wiring scheme Electrical terminations, lugs and crimping Wiring type, identification, size No maintenance / inspection deficiencies were identifie Licensee Corrective Action:
The initial action taken was to assure that no inspections were being performed by QC inspectors having questionable certification /
qualifications, and to identify and evaluate past inspection activities performed by inspectors having questionable certifications. The licensee revised procedures for the qualification and certification of QC inspectors, and held discussions with QC supervision which stressed procedural adherence and procedural improvements. The licensee has responded to each of the QA RCAs, providing root cause, immediate corrective action and action to prevent recurrenc In addition, the licensee has formulated a QC Program Enhancement Assignment and Schedule, elements of which include:
- Task analysis for each area of inspectio * Additional procedures and procedural controls for training, retraining, proficiency demonstrations, and testin . Impact of the Licensee's Operational QC Program on Callaway Construction During the construction phase at the Callaway plant, the QC function was performed by Daniel International Corporation and overviewed by
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
. .
the Union Electric Quality Assurance Organization. Ongoing inspections during the construction of Callaway by the NRC revealed that no significant concerns were identified with the QC inspector certifications at Callaway. Examples of the NRC inspection effort may be reviewed in the Construction Appraisal Team (CAT) Report No. 50-483/82-03 and in routine Inspection Report No. 483/84-30 addressing the Government Accountability Project (GAP) allegations. The NRC has determined that the present UEN0 QC certification issues had no impact on the construction of the Callaway facilit . Summary The inspection activities described heretofore were precipitated by an allegation made to the licensee on February 4, 1985 and to the NRC on February 5, 1985. The allegation was made by members of the licensee's QC department and contended that the QC supervisor failed to follow QC procedure QCP-ZZ-01001 " Certification of Quality Control Inspectors" in certifying three QC Assistant Supervisors as Level III inspector The allegation specified that the signature of the Callaway Plant Manager was obtained on the Letter of Certification rather than the signature of an available certified Level III inspecto On February 8,1985 the licensee's QA Organization issued a Request for Corrective Action (RCA) document substantiating the allegatio At the same time the QA department initiated a surveillance (review)
of the certifications of all presently employed inspectors in the Nuclear Operation QC Organizatio The QA department reviewed the qualification of individuals against a specific set of acceptance criteria, which they had developed, implementing ANSI N45.2.6-1978. The results of the certification surveillance were presented to the licensee's management on February 22, 198 The surveillance indicated that certifications for seven individuals were questionable. The licensee's management responded to the QA surveillance findings on February 26, 1985 and took the following actions: The licensee decertified the seven QC inspectors whose certifications were identified as questionable, Initiated a review of the certifications and qualifications of all operations QC inspectors both past and presen Initiated a review of work authorizing documents to identify those documents which involved inspectors with questionable certification Set up a QA/ Engineering evaluation team to review and evaluate the work documents identified in 5.c above for safety / quality impact on plant hardwar The follow up review (See Item 5.b above) looked at 85 inspectors holding 247 certifications. Of the 247 certifications 207 were acceptable, 11 certifications were found questionable (however, the inspectors holding
. .. .
_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ -
. .
. .
the certifications had not performed any inspections relating to the certifications), and the remaining 29 certifications, held by 22 inspectors l (the original 7 identified by the QA department plus 15 previously employed inspectors), were also determined to be questionable.
'
The QA/ Engineering evaluation team reviewed and evaluated those Work Requests, Preventive Maintenance Task Sheets, and Startup Maintenance
,
Authorizations which involved inspections performed l'y individuals l
with questionable certification The evaluation team determined that the inspections performed were either within the capabilities of the inspectors (e.g. routine surveillance of crafts, system cleanliness, routine torquing of bolts or terminations) or that the checklists for more complex inspections contained sufficient inspection attributes and acceptance criteria such that the inspector was capable of performing the activit The evaluation team followed up on the document review by selecting eight completed safety-related maintenance / inspection activities, which had been performed by individuals with questionable certifications, for in plant inspection. No deficiencies were identifie Based on the above reviews and inspections, the licensee determined that the inspections performed by questionably certified inspectors presented no significant impact on plant components, system function, or qualit During the surveillance of certifications and qualifications of QC inspectors, the QA organization identified a number of deficiencies in the QC qualification program. The most significant of the deficiencies dealt with QC's lack of specific qualitative and quantitative acceptance criteria to implement the guidance of ANSI N45.2.6-1978. The lack of specific acceptance criteria and attendant documentation requirements can be directly tied to the QA findings of questionable certifications:
Whereas the QC department was utilizing the general guidance of ANSI N45.2.6-1978 in determining the qualifications of individuals, the QA department had developed a detailed set of acceptance criteria to implement ANSI N45.2.6 and had used those criteria in evaluating each inspector's qualification The NRC inspector's activities included: meetings with the licensee's corporate, plant, and QA management; interviews with QC, QA, and engineering personnel; document review; and field inspection of selected safety related work packages. Through these activities the NRC inspector determined that the licensee's response to the original allegation and I the licensee's further investigation were prompt and thoroug l The reviews in this area identified two violations of NRC regulations as follows:
Violation No. 1 10 CFR 50, Appendix B, Criterion V states, in part, " Activities affecting quality shall be prescribed by documented... procedures...
and shall be accomplished in accordance with these... procedures..."
. .
. .
. i The processing of certifying Quality Control personnel for non-NDE activities is described in QCP-ZZ-01001, Revision 2. Step 4.4.2 of this procedure states, in part: "The Quality Control Supervisor shall submit the letter of certification to the level III for his review and approval."
Step 3.3 of that procedure defines the level of authority for a QC Level III as:
A QC Level III person has the authority for the approval of certifications of all Quality Control Personnel performing inspections (excluding NDE and VT). If no QA Level III with certification within the proper area is employed within Nuclear Operations, the Manager, Callaway Plant, shall assume the responsibility of approving a letter of certification for a qualified person to be Level II Contrary to the above, the Quality Control Supervisor submitted letters of certification to the Manager, Callaway Plant, when there was a QC Level III in the specific discipline employed within UENO-Q The above violation was identified by the licensee and documented in QA's Request for Corrective Action (RCA) No. P-8502-028. In response to the RCA the licensee took the following corrective actions:
(1) Procedure QCP-ZZ-01001 was revised to allow approval of QC Level III inspector certification by either a certified QC Level III inspector or the plant manage (2) The importance of procedural compliance was stressed during a meeting between the licensee's upper management and QC supervisor In accordance with the NRC's Enforcement Policy to encourage and support licensee's initiative for self-identification and correction of a problem and since the licensee's actions regarding the above violation meet all the criteria of 10 CFR 2, Appendix C, no citation will be issued for this failure to comply with a procedural requiremen Violation No. 2 10 CFF 50, Appendix B, Criterion V states, in part, ". . . Activities af fecticq quality shall be prescribed by. . . procedures. . . procedures shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished."
Contrary to the above, the licensee's procedure for " Qualification of QC Personnel" QCP-ZZ-01002 did not contain appropriate
- - - - - - - . - - - - - - - - - - - - - - - - _ - -
,
. .
. *
quantitative or qualitative acceptance criteria for determining qualifications for certification and as a result a number of inspectors were certified in areas where the qualifications were questionabl The above is considered a violation, as set forth in the Appendix (483/85012-01).
The above program deficiency and related items were documented by the licensee in RCA's Nos. P-8502-034, P-8502-035 and P-8502-03 In response to the RCA's, the licensee has revised procedures QCP-ZZ-01001 " Certification of QC Personnel" and QCP-ZZ-01002
" Qualification of QC Personnel." The procedures now address the following area (1) Definition of the minimum qualifications of QC inspectors as specified in ANSI N45.2.6-197 (2) Definition of the documentation requirements for a QC certification packag (3) The determination of initial capabilities of candidates for QC certification is now specifie (4) Guidance for the determination of "related" work experience is provide (5) The requirement for proficiency demonstrations (minimum examination questions and inspection points) for candidates not meeting the experience requirement Inasmuch as the licensee has taken timely and appropriate corrective action on this violation, no response to the item is required and violation 483/85012-01 is considered close No other violations or deviations were identifie . Conclusion Based on the review of maintenance / inspection activities performed, the licensee's evaluation and criteria applied, interviews and field verification inspection, the inspector found reasonable assurance that prior maintenance / inspections activities had been adequately performe Additional assurance as to the adequacy of maintenance is provided by the functional / surveillance testing program. The testing program, which is independently specified and reviewed, requires post-maintenance and/or Technical Specification surveillance tests for safety-related systems or components on which maintenance has been performe The inspector has reviewed in detail the QC program deficiencies, causal factors and the licensee's corrective action. The inspector determined that the licensee has taken prompt, appropriate, and comprehensive corrective action . . .
. *
NRC Open Item 483/85002-01(DRP) discussed in paragraph 2.a. above is close . Exit Interview The inspector met with licensee representatives (aenoted under Persons Contacted) at intervals during the inspection perit NRC Region III Chief, Project Branch 2, attended the exit interview on May 10, 198 The inspector summarized the scope and findings of the inspection. The licensee representatives acknowledged the findings as reported herei i