IE Insp Rept 50-302/79-49 on 791115-16.No Noncompliance Noted.Major Areas Inspected:Review of Licensee 791015 Commitments Re Mod of Vital Area Doors & Intrusion Alarm Responses
ML19257B712
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/26/1979
From: Besecker K, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19257B709 List:
References
50-302-79-49, NUDOCS 8001180178
Download: ML19257B712 (2)


Text

[

'o,,

UNITED STATES

NUCLEAR REGULATORY COMMISSION o

$

E REGION 11

o 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, G EORGIA 30303 o

.....

NOV 2 61979 Report No. 50-302/79-49 Docket No. 50-302 License No. DPR-72 Licensee: Florida Power Corporation P. O. Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733 Facility Name: Crystal River 3 Inspection at:

Crystal River, Florida Inspection conducted: November 15-16, 1979 Date of Last Physical Security Inspection:

September 11-13, 1979

Type of Inspection: Unannounced Physical Security Inspector j

6d

  1. />c /) ')

,

K/llMes'scker, Physical Security Inspector D t9/Si ned Approved by:

-b (h l( / c?[o () 4 W. J. Tobin, Ac g Ssction Chief, S&I Section, Date Sligned Safeguards B ch Inspection Summary Areas Inspected: Included a review of licensee's commitments regarding modifica-tion of vital area doors and intrusion alarm responses contained in licensee's letter to Region II dated October 15, 1979.

The inspectica involved six inspector hours on site by one NRC inspector.

Results: The licensee was found to be in compliance with NRC requirements within the two areas examined during the inspection.

.

.

W 176h155 80011f0178

.

DETAILS 1.

Persons Contacted Licensee Employees

  • D. C. Poole, Plant Manager
  • H. B. Lucas, Administrative Supervisor
  • J.

L. Buckner, Officer of the Guard

  • Attended exit interview 2.

Licensee Action on Previous Inspection Findings Not inspected.

3.

Exit Interview An exit interview was held on November 15, 1979, with those persons indicated in Paragraph 1 above. The inspection findings were presented as indicated below. The inspector's observations of vital area door mountings found them to be provided with astragals as indicated in the licensee's letter to RII, dated October 15, 1979. It was also found that the licensee responds to and records vital area intrusion alarm annunciations.

4.

Unresolved Items None.

5.

MC81155B Response On November 14, 1979, the inspector interviewed the on shift operator of the Central Alarm Station to determine the operator's familarity with the vital area intrusion detection system. Time was also spent during this period observing the operator perform her duties as alarm station operator to include dispatching guards to alarmed points and recording alarm annun-ciations.

On November 15, 1979, the inspector reviewed the vital area alarm record for the period November 2-13, 1979, and compared it to the automatic printout from the vital area card reader system.

6.

MC 81139B Vital Area Access Control On November 14, 1979 the inspector observed each vital door indicated in the approved security plan and found each door frame to be provided with an astragal as indicated in the licensee's letter of. 0ctob'er 15, 1979. to Region II.

"-

2 *,.

-