Forwards IE Insp Rept 50-302/79-49 on 791114-15.No Noncompliance Noted
ML19257B708
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/26/1979
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19257B709 List:
References
NUDOCS 8001180173
Download: ML19257B708 (2)


See also: IR 05000302/1979049

Text

/

o

UNITED STATES

[O -d'o &

8

I

NUCLEAR REGULATORY COMMISSION

o

$

E

REGION 11

t

3

o,

'[

101 MARIETTA ST., N.W.. SUITE 3100

b

o

ATLANTA, GEORGIA 30303

.....

In Reply Refer To:

NOV 2 61979

RII:KHB

50-302/79-49

Florida Power Corperation

ATTN: John A. Hancock, Director

Nuclear Operations

P. O. Box 14042, Hail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by K. H. Besecker of this office on

November 14-15, 1979, of activities authorized by NRC Operating License No.

DPR-72 at Crystal River 3 and to the discussions of our findings held with G. P.

Beatty, Jr. , at the conclusion of the inspection.

Areas examined during this inspection included your physical security program as

,

implemented under the provisions of Title 10, Code of Federal Regulations, Part

73, " Physical Protection of Plants and Materials" and the specific requirements

of your approved Security Plan. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, performance tests, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in NRC's Public Document Room. If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad.to discuss

them with you.

e el ,

-

.I .

enn , Chief

~

'

'

B

'

Safeguards Branch

lh9.j' Enclosures: S.:a Page 2 $ 80011go 173

. Florida Power Company -2- NOV 2 61979 , Enclosures: 1. Inspection Report No. 50-302/79-49 (Not Exempt) 2. Inspection Summary (Not Exempt) cc w/ enc 1: G. P. Beatt.y, Jr. ' Plant Superintendent P. O. Box 1240 Crystal River, FL 32629 ., . 0 1769iS4 . }}