MONTHYEARML20217J3341999-10-19019 October 1999 Forwards Request for Addl Info Re Sale of Portion of Land Part of Oyster Creek Nuclear Generating Station Site Including Portion of Exclusion Area ML20217E0181999-10-0606 October 1999 Provides Nj Dept of Environ Protection Comments on Oyster Creek Nuclear Generating Station TS Change Request 267 Re Clarifications to Several TS Sections ML20216J7591999-09-30030 September 1999 Informs NRC That Remediation Efforts for Software Sys Etude & Rem/Aacs/Cico Have Been Completed According to Schedule & Now Y2K Ready 05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts1999-09-30030 September 1999 Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts ML20212J6721999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Oyster Creek Nuclear Generating Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216K1421999-09-29029 September 1999 Provides NRC with Name of Single Point of Contact for Purpose of Accessing Y2K Early Warning Sys,As Requested by NRC Info Notice 99-025 ML20217D1661999-09-27027 September 1999 Forwards Proprietary Completed NRC Forms 396 & 398,in Support of License Renewal Applications for Listed Individuals,Per 10CFR55.57.Encl Withheld ML20217B2531999-09-24024 September 1999 Informs That on 980903,Region I Field Ofc of NRC Ofc of Investigations Initiated Investigation to Determine Whether Crane Operator Qualification/Training Records Had Been Falsified at Oyster Creek Nuclear Generating Station ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A7921999-09-13013 September 1999 Forwards Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Issued on 950817 to Plant ML20212B5571999-09-10010 September 1999 Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V ML20211N2941999-09-0303 September 1999 Responds to NRC 990802 Telcon Request for Environ Impact Assessment of TS Change Request 251 Concerning Movement of Loads Up to 45 Tons with RB Crane During Power Operations ML20211J9831999-09-0202 September 1999 Discusses 990804 Telcon Re Sale of Portion of Oyster Creek Nuclear Generating Station Land.Requests Info Re Location of All Areas within Property to Be Released Where Licensed Radioactive Matl Present & Disposition of Radioactive Matl ML20211J6771999-08-30030 August 1999 Submits Response to NRC 990802 Telcon Request for Gpu to Provide Environ Impact Assessment for Tscr 251 ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211C0161999-08-19019 August 1999 Advises That Info Submitted by Ltr,Dtd 990618, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool, Holtec Rept HI-981983,rev 4,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211B9011999-08-18018 August 1999 Forwards Rev 0 to EPIP 1820-IMP-1720.01, Emergency Public Info Implementing Procedure ML20210U4341999-08-17017 August 1999 Responds to to Chairman Dicus of NRC on Behalf of Fm Massari Concern About Oyster Creek Nuclear Generating Station Not Yet Being Fully Y2K Compliant ML20210Q7331999-08-12012 August 1999 Responds to Re TS Change Request (TSCR)264 from Oyster Creek Nuclear Generating Station.Questions Re Proposed Sale of Property within Site Boundary & Exclusion Area ML20210L6311999-08-0606 August 1999 Discusses Licensee Response to GL 92-01,Rev1,Suppl 1, Rv Structural Integrity, for Plant.Staff Has Revised Info in Rv Integrity Database & Releasing as Rvid Version 2 ML20210D2801999-07-22022 July 1999 Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001 ML20209H5001999-07-14014 July 1999 Forwards Revised TS Pages 3.1-15 & 3.1-17 Which Include Ref to Note (Aa) & Approved Wording of Note H of Table 3.1.1, Respectively ML20210U4411999-07-12012 July 1999 Forwards Article from Asbury Park Press of 990708 Faxed to Legislative Officer by Mutual Constitute Fm Massari Indicating That Oyster Creek Nuclear Generating State Not Fully Y2K Compliant ML20209G1451999-07-0909 July 1999 Forwards Rev 1 to 2000-PLN-1300.01, Oyster Creek Generating Station Emergency Plan. Attachment 1 Contains Brief Summary of Changes,Which Became Effective on 990702 ML20209E0821999-07-0707 July 1999 Forwards TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20209B7501999-07-0101 July 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Generic Ltr 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Licensee Y2K Readiness Disclosure for Ocngs,Encl ML20196G1361999-06-23023 June 1999 Provides Status of Corrective Actions Proposed in in Response to Insp Rept 50-219/98-80 & Revised Schedule for Completion of Actions Which Are Not Yet Complete ML20196E6421999-06-22022 June 1999 Forwards Revised Pages of TS Change Request 261,dtd 990618. Replacement Requested Due to Several Dates Being Omitted on Certain Pages ML20195G6541999-06-0707 June 1999 Discusses 981204 Initiation to Investigate Whether Contract Valve Technician,Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20195G6631999-06-0707 June 1999 Discusses 981204 Intiation to Investigate Whether Contract Valve Technician Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20209B0561999-06-0404 June 1999 Informs That NRR Has Reorganized,Effective 990328.Forwards Organizational Chart ML20195D0551999-06-0303 June 1999 Forwards TS Change Request 226 to License DPR-16,permitting Operation with Three Recirculation Loops.Certificate of Svc & Tss,Encl ML20195C5511999-05-25025 May 1999 Forwards Book of Controlled Drawings Currently Ref But Not Contained in Plant Ufsar.Drawings Were Current at Time of Submittal ML20206N7711999-05-11011 May 1999 Forwards Rev 0 to Oyster Creek Emergency Plan, IAW 10CFR50.47(b) & 10CFR50.54(q).Changes Became Effective on 990413 ML20206H9441999-04-28028 April 1999 Forwards Application for Amend to License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons Using Reactor Bldg Crane During Power Operations,Per NRC Bulletin 96-002 ML20206B6991999-04-26026 April 1999 Forwards Copy of Rev 11 to UFSAR & Rev 10 to Oyster Creek Fire Hazards Analysis Rept. Without Fire Hazard Analysis ML20206D3801999-04-26026 April 1999 Forwards Rev 11 to UFSAR, & Rev 10 to Fire Hazards Analysis Rept, for Oyster Creek Nuclear Generating Station, Per 10CFR50.712(e) ML20206A9931999-04-22022 April 1999 Forwards Number of Personnel & Person Rems by Work & Job Function Rept for Period Jan-Dec 1998. Included in Rept Is Listing of Number of Station,Util & Contractor Personnel as Well as Diskette Reporting 1998 Occupational Radiation ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 ML20205P8411999-04-15015 April 1999 Forwards TS Change Request 267 to License DPR-16,modifying Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4. Certificate of Svc Encl ML20205P5381999-04-14014 April 1999 Ack Receipt of Re Request for Exception to App J. Intended Correction Would Need to Be Submitted as Change to TS as Exceptions to RG 1.163 Must Be Listed in Ts,Per 10CFR50,App J ML20205P9401999-04-12012 April 1999 Informs NRC That Gpu Nuclear Is Modifying Oyster Creek FSAR to Reflect Temp Gradient of 60 F & to Correct Historical Record ML20205P0651999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Results of PPR Used by NRC Mgt to Facilitate Planning & Allocation of Insp Resources 05000219/LER-1998-015, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page1999-04-0505 April 1999 Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page ML20205J3281999-04-0101 April 1999 Discusses Arrangements Made on 990323 for NRC to Inspect Licensed Operator Requalification Program at Oyster Creek Nuclear Generating Station During Week of 990524 ML20205H1081999-03-31031 March 1999 Forwards Current Funding Status for Decommissioning Funds Established for OCNPP,TMI-1,TMI-2 & SNEC ML20205F0611999-03-25025 March 1999 Submits Info on Sources & Levels of Property Insurance Coverage Maintained & Currently in Effect for Oyster Creek Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20205E1171999-03-24024 March 1999 Forwards Rev 39 to Oyster Creek Security Plan & Summary of Changes,Iaw 10CFR50.54(p).Rev Withheld ML20207F0331999-03-0404 March 1999 Forwards Insp Rept 50-219/98-12 During Periods 981214-18, 990106-07 & 20-22.Areas Examined During Insp Included Implementation of GL 89-10 & GL 96-05.No Violations Noted ML20207K2471999-02-25025 February 1999 Forwards Fitness for Duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Ny 1999-09-30
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217J3341999-10-19019 October 1999 Forwards Request for Addl Info Re Sale of Portion of Land Part of Oyster Creek Nuclear Generating Station Site Including Portion of Exclusion Area ML20212J6721999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Oyster Creek Nuclear Generating Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20217B2531999-09-24024 September 1999 Informs That on 980903,Region I Field Ofc of NRC Ofc of Investigations Initiated Investigation to Determine Whether Crane Operator Qualification/Training Records Had Been Falsified at Oyster Creek Nuclear Generating Station ML20212A7921999-09-13013 September 1999 Forwards Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Issued on 950817 to Plant ML20211J9831999-09-0202 September 1999 Discusses 990804 Telcon Re Sale of Portion of Oyster Creek Nuclear Generating Station Land.Requests Info Re Location of All Areas within Property to Be Released Where Licensed Radioactive Matl Present & Disposition of Radioactive Matl ML20211C0161999-08-19019 August 1999 Advises That Info Submitted by Ltr,Dtd 990618, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool, Holtec Rept HI-981983,rev 4,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20210U4341999-08-17017 August 1999 Responds to to Chairman Dicus of NRC on Behalf of Fm Massari Concern About Oyster Creek Nuclear Generating Station Not Yet Being Fully Y2K Compliant ML20210Q7331999-08-12012 August 1999 Responds to Re TS Change Request (TSCR)264 from Oyster Creek Nuclear Generating Station.Questions Re Proposed Sale of Property within Site Boundary & Exclusion Area ML20210L6311999-08-0606 August 1999 Discusses Licensee Response to GL 92-01,Rev1,Suppl 1, Rv Structural Integrity, for Plant.Staff Has Revised Info in Rv Integrity Database & Releasing as Rvid Version 2 ML20195G6541999-06-0707 June 1999 Discusses 981204 Initiation to Investigate Whether Contract Valve Technician,Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20195G6631999-06-0707 June 1999 Discusses 981204 Intiation to Investigate Whether Contract Valve Technician Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20209B0561999-06-0404 June 1999 Informs That NRR Has Reorganized,Effective 990328.Forwards Organizational Chart ML20205P5381999-04-14014 April 1999 Ack Receipt of Re Request for Exception to App J. Intended Correction Would Need to Be Submitted as Change to TS as Exceptions to RG 1.163 Must Be Listed in Ts,Per 10CFR50,App J ML20205P0651999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Results of PPR Used by NRC Mgt to Facilitate Planning & Allocation of Insp Resources ML20205J3281999-04-0101 April 1999 Discusses Arrangements Made on 990323 for NRC to Inspect Licensed Operator Requalification Program at Oyster Creek Nuclear Generating Station During Week of 990524 ML20207F0331999-03-0404 March 1999 Forwards Insp Rept 50-219/98-12 During Periods 981214-18, 990106-07 & 20-22.Areas Examined During Insp Included Implementation of GL 89-10 & GL 96-05.No Violations Noted ML20206U3551999-02-0505 February 1999 Refers to Concerns Recipient Expressed to V Dricks on 990126 Related to Oyster Creek About Event Which Occurred on 970801 & About Administrative Control of EDG Vendor Manuals ML20199L2471999-01-22022 January 1999 Discusses GL 96-01, Testing of Safety-Related Logic Circuits, Issued on 960110 & Gpu Nuclear 960418 & 981202 Responses for Ocngs.Informs That Based on Confirming GL 96-01 Commitments Review Effort Closed ML20199G8241999-01-12012 January 1999 Responds to Ltr to Senator Lt Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20199G8631999-01-0707 January 1999 Responds to Ltr to Senator Lt Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20198B2121998-12-0909 December 1998 Advises of Planned Insp Efforts Resulting from Licensee Irpm Review.Historical Listing of Plant Issues & Details of Insp Plan for Next 6 Months Encl ML20196C6001998-11-25025 November 1998 Forwards Insp Rept 50-219/98-09 on 980914-1025 & Notice of Violation.Inspector Identified That Security Force Member Left Running Unlocked Vehicle Unattended in Protected Area ML20195G8901998-11-17017 November 1998 Responds to to Lt Connors Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20195G9101998-11-17017 November 1998 Responds to to Lt Connors Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20195G8801998-11-17017 November 1998 Responds to to Senator Lt Conners Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20195G9181998-11-17017 November 1998 Responds to to Lt Connors Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community IR 05000219/19980031998-11-13013 November 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-219/98-03 Issued on 980717.Corrective Actions Will Be Examined During Future Insp of Licensed Program ML20196D1431998-11-10010 November 1998 Forwards Exam Forms with Answers,Results Summary for Plant & Individual Answer Sheets of GFE Section of Written Operator Licensing Exam,Administered on 981007.Without Encl ML20195C4111998-11-0606 November 1998 Discusses 980825 Gpu Submittal of Proposed Mod for Ocnpp Core Support Plate Which Involved Installation of Wedges During 17R Outage.Licensee Intends to Use Recommendations of BWRVIP-25 & BWRVIP-50.SE Accepting Proposed Mod Encl ML20195B7981998-11-0505 November 1998 Discusses Alternative Evaluation of Flaws in Ferritic Piping.Core Spray Sys Test Line Was Concluded to Have Acceptable Level of Quality & Safety ML20155C6881998-10-29029 October 1998 Responds to Ltr to Senator Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C7201998-10-29029 October 1998 Responds to Ltr to Assemblyman Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C7051998-10-29029 October 1998 Responds to Ltr to Senator Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C7481998-10-29029 October 1998 Responds to Ltr to Assemblyman Morgan, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C6241998-10-29029 October 1998 Responds to Ltr to Senator Connors,Dtd 980926,re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C7021998-10-29029 October 1998 Responds to Ltr to Senator Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C6661998-10-29029 October 1998 Responds to Ltr to Senator Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C6841998-10-29029 October 1998 Responds to Ltr to Senator Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C6721998-10-29029 October 1998 Responds to Ltr to Senator Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C7251998-10-29029 October 1998 Responds to Ltr to Senator Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C7371998-10-29029 October 1998 Responds to Ltr to Senator Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C6981998-10-29029 October 1998 Responds to Recent Ltr to Senator Connors Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C6481998-10-29029 October 1998 Responds to Ltr to Sentor Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C7091998-10-29029 October 1998 Responds to Ltr to Assemblyman Connors, Re Possible Closure of Oyster Creek Nuclear Generating Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155C8781998-10-29029 October 1998 Informs That Oyster Creek Generating Station Operating License,Paragraph 2.C.5 Re Evaluation of Core Spray Internals Insp Requires Authorization from NRC Before Plant Is Restarted from Refueling Outage.Plant Restart Authorized ML20155C7301998-10-29029 October 1998 Responds to Ltr to 9th District Legislative Offices, Re Possible Closure of Oyster Creek Nuclear Station & Possible Impact That Closure May Have on Economy & Environ of Community ML20155D2041998-10-26026 October 1998 Forwards Synopsis of 980604 Investigation Rept 1-98-027 Re Possible Discrimination Against Employee for Contacting NRC in Nov 1997 with Security & Safety Concerns ML20154Q9021998-10-20020 October 1998 Forwards Insp Rept 50-219/98-08 on 980727-0913.No Violations Noted.Licensee Have Established & Implemented Effective Programs for Initial & Continuing Training of Workers, Especially Those Having Access to Controlled Areas ML20154L3001998-10-14014 October 1998 Forwards Safety Evaluation Re Reduced Scope of IGSCC Insp, During Refueling Outage 17 ML20154J8251998-10-0707 October 1998 Discusses Concerns Raised to NRC on 980913 Re Oyster Creek. Thoroughness of NRC Insps as Documented in NRC Integrated Insp Rept 50-219/98-03 Was of Concern 1999-09-30
[Table view] |
Text
..
E. Ot5 I .
I gp 5 B90
'
Docket No. 50-210 GPU NucWe Corporation ATTN: Mr. Eugene E. Fitzpatrick ,
Vice President and Director '
Oyster Creek Nuclear Generating Station P. O. Box 388 Forked River, New Jersey 08731 Gentlemen:
Subject: Inspection Report No. 50-219/90-80 This refers to your letter dated September 24, 1990, in response to our letter dated August 20, 1990, which forwarded the results of our inspection on your I training programs.
L Thank you for informing us of the corrective and preventive actions documented '
in your letter. This acknowledges receipt of your letter only. Your correc-tive and preventive actions will be examined during future evaluations of your licensed program. Additionally, the Human Factors Assessment Branch, NRR has been asked to review your response to the areas of program evaluation and job and task analysis for the operator training programs.
Your cooperation with us is appreciated.
Sincerely, Original Signed By; Marvin W. Hodces Marvin W. Hodges, Director Division of Reactor Safety CC:
M. Laggart, BWR Licensing Manager Licensing Manager, Oyster Creek Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
!
State of New Jersey 9012170105 901205 PDR ADOCK 05000219 O PDR I h '
I 0FFICIAL RECORD COPY WALKER /IR 50-219-90-80 - 0001.0.0 10/10/90 09113 3
F. l l
GPU Nuclear Corp. 2 I
bec:
Region I Docket Room (with concurrences)
Management Assistant, DRPA M. Hodges, DRS L. Bettenhausen, DRS R. Conte, DRS T. Walker, DRS J. Caldwell, EDO .
A. Dromerick, Project Manager, NRR '
J. Wermiel, DLPQE, NRR R. Bellamy, DRSS Section Chief, DRP K. Abraham, PA0 (20) SALP Report and (2) All Inspection Reports DRS Files (3)
DRS:RI DRS:RI DRS:RI DRS:RI Walker /ajk/dmg Con / Bet ausen Hodg '.
f11/2T/90 11/ 90
/90 14/ /90 l
l l
'
0FFICIAL RECORD COPY WALKER /IR 50-219-90-80 - 0002.0.0-l 10/10/90
,
'
l
-
-
.
. _ _ - - _ _ _ _ - _ - _ .
..-(, , ,
'
.
GPU Nuclear Corporstlen er Post Office Box 388 Route 9 South Forked River, New Jersey 087310388
,
-
609 971 4000 Wnter's Direct Dial Number:
i Septanber 24, 1990 ;
Mr. Thomas T. Martin, Administrator U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 i l
l Dear Mr. Martin Subjects Oyster Creek Nuclear Generating Station Docket No. 50-219 Response to Training Inspection 90-80 Enclosed is GPU Nuclear's response to NRC letter dated August 20, 1990 which forwarded NRC Inspection Report 90-80 (NUREG 1220 Audit). As requested, this ,
response identifies actions taken or planned to address the two areas of weakness discussed in the report. In addition, GPUN is providing clarification relative to the job and task analysis for the operator training programs which is also discussed in the report.
If there are any questions regarding this matter, please contact Mr. Michael Niler, [
Licensing Engineer at (609) 971-4680. !
Very truly yours, ;
.
!
O l E.E. Fitzpa ick Vice President & Director Oyster Creek
,
l EEF/MH jc (MH+LTRS 24)
l cc: U.S. Nuclear Regulatory Commission j Attn Document Control Desk Washington, D.C. 20555
l NRC Resident Inspector j Oyster Creek Nuclear Generating Station 1 GPU Nuclear Corporation is a subsidiary of General Pubhc Utikties Corporation 4G/213937 &
,.-( , 1
.
'
.
ATTACHMENT 1 Provided below are the actions taken or planned to address the two areas of l weakness identified in NRC Inspection Report 90-80. .
!
Area # 1 : Trainee Evaluatio.D i
In response to the grading discrepancies identified as a result of the special NRC team inspection (NUREG 2220 Audit), a critique was commenced on June 28, 1990 and completed on July 16, 1990. Additionally, LER 90-011 was submitted on July 23, 1990 to report the non-compliance related to this matter. !
'
The critique identified personnel error (lack of attention to detail) and inadequate procedures (lack of a comprehensive procedure on the preparation, administration, and grading of exams) as the root causes of this event. t Additionally, the requalification exam bank question format and quality (short answer / essay format along with ambiguous or non-specific wording stemming from a less than adequate validation) was cited as a major contributor.
In response to these findings, the following actions were completedt a) By means of a written Training Department Instruction / Directive and a special departmental staff meeting, the Manager, Plant Training communicated management expectations relative to exam preparation, grading and administrative closeout to all training department ,
personnel.
b) The operator Training Manager and Supervisor of operator Training also reinforced grading expectations tc.all operator training personnel in writing and in a special section meeting.
c) The critique report was required reading for all training ,'
department personnel.
Additionally, the following actions are underway l a) A training session on the proper development of open reference _ test ( items for all operator training instructors is being presented (September 30, 1990). 1 I
b) A revalidation of the entire requalification written exam bank is on-going. Included in this effort will be the conversion of a major portion of the bank to an objective question format (March 31, 1991).
c) An operator training examination administration procedure is in the approval process. This procedure addresses the " process" aspects I of the various steps of examination activity including preparation, administration and grading (october 30, 1990).
>
-
,
. _ _ . .. . ___. __ . , _ - - . _ -. ..
. . *L .
.
ATTACHMENT 1 (Continued)
'
Area # 2 : Procram Evaluation GPUN agrees with the accuracy of the examples cited in Section 2.5 of Inspection Report 90-80 regarding concerne expressed by trainees about the training programs. GPUN also believes that' existing evaluation mechanisms were in place to identify all but one of the examples. The exception would be the item related to inaccurate trainee evaluation and we believe corrective actions already identified previously in this attachment will satisfactorily address e that issue.
Additionally, Oyster Creek will perform two integrated program evaluations in
- the operator training area. They will be performed in the third quarters of 1991 and 1992. These evaluations will include a combined assessment of test results, programmatic critiques, on-the-job feeaback, internal and external program evaluations and training staff evaluat. ions.
.
I
!
l l
, -
_ _ .
...*1
.
O ATTACHMENT 2 The following clarification is provided relative to the job and task analyses for the operator training programs:
A) It is true that GPUN chose to enhance the analysis phase of our operator training programs by a revalidation effort. However, the i
revalidation will not result in a complete task analysis for all tasks in all programs. The revalidation effort consists of seven (7) parts:
1) Rev10w all existing tasks for adequacy and usability. This may.
result in breaking a single task into several smaller tasks, accepting the original task and associated learning objectives as written, or significantly modifying an original task's wording to enhance clarity (modified task).
2) Review the current job's scope by reviewing procedures to identify any additional new tasks which should be listed as part of the job analysis.
3) Survey the entire task listing to rate all tasks based on frequency, importance, and difficulty. l 4) Review the completed and surveyed job analysis task listing for selection of tasks for training and identification of which training program (initial, continuing or both) in which to present those tasks. ;
5) Do a full task analysis on any new or modified tasks identified in q parts 1 or 2 above, i 6) Identify the appropriate training setting (classroom, simulator, etc.) for each task selected.
7) Load pertinent data from the completed job / task analysis into the automated Training Matrix Hanagement System (TMMS) for instructor utilization in lesson material development / upgrade. This will ,
automatically result in a readily accessible task-to-training cross '
reference matrix.
Experience thus far indicates that this effort will result in approximately 70% of a program's tasks being fully analyzed. Due to heavy reliance on the control room operator task listing for requalification exam development, it remains our intent that this job classification will have an updated analysis on all tasks.
TMMS is being updated continuously. For example, all original taske 1 are entered into TMMS. As tasks are revalidated (steps 1, 2 and 3), l TMMS is updated with the task list. As tasks are further analyzed j (step 5), TMMS is again updated with this information. This process '
is designed to. keep TMMS as current as possible for maximum.use by instructors. !
! ,
! '
i l
L
e #* L.
. ,
ATTACHMENT 2 (Continued)-
8) A fully current and easy to use task-to-training materials cross reference matrix will exist when the task revalidation / analysis effort is complete and fully loaded into TMMS. Until that time, when instructors are preparing for a lesson, they are required to refer to TMMS for task titles (and associated enabling objectives when available). By entering a system code number into TMMS, all associated tasks and/or enabling objectives can be instantaneously retrieved.
The instructor then generates behavioral learning objectives from the task titles. If enabling objectives already exist, he/she uses them and the associated terminal objective to updcte the lesson plan. The lesscn plans are then reviewed and approved by a user group manager.
The link between these training materials and the task list is now documented by recording the specific job / task analysis used on the cover page (Training Content Record) of the lesson plan.
This entire process is required by our operator Training Lesson plan Instruction which was presented to the ine.naction team. This instruction does not appear in the list of materials reviewed at the end of the inspection report.
We beliove that this process is a good interim measure until all enhancements available through use of TMMS sre tully usaole. This process establishes a workable performance based training program based on the job analysis already in existence (and loaded into TMMS)..
C) Although the number of new or modified tasks (541) in the CRO task revalidation seems large in comparison to the total number of original tasks (726), the original job analysis is not unacceptable. A large percentage of the 541 tasks are modifications to generic tasks that already existed to make the task listing specific to oyster Creek. In the majority of cases, the original tasks were acceptable as written.
This process is simply enhancing a fundamentally sound job analysis.