Forwards YAEC-1363, CASMO-3G Validation. Rept Entitled Simulate-3 Validation & Verification Will Be Submitted by 880701.Schedule for Submission of plant-specific Repts Re Subj Repts Stated.Fee Paid
ML20151H949
Person / Time
Site: Vermont Yankee, Yankee Rowe, Maine Yankee, 05000000
Issue date: 04/11/1988
From: Papanic G
YANKEE ATOMIC ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151H952 List:
References
FVY-88-026, FVY-88-26, FYR-88-048, FYR-88-48, MY-88-043, MY-88-43, NUDOCS 8804210010
Download: ML20151H949 (2)


Text

___ _,

Te.'whone t617) GT2-c100 TWX 710-380-7319 YANKEE ATOMIC ELECTRIC COMPANY y 1671 Worcester Road, Framingham, Massachusetts 01701 FYR-88-048 FVY-88-026 MY-88-043 April 11, 1988 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 2v555

Reference:

(a) License No. DPR-03 (Docket No.50-029)

(b) License No. DPR-28 (Docket No. 50-271)

(c) License No. DPR-36 (Docket No. 50-309)

Subject:

Submittal of new Reactor Physics Methods reports and schedule for submitting plant specific reports.

Dear Sir:

Yankee met with the USNRC on August 25, 1987 to discuss our plans to utilize new reactor physics methods for Yankee Nuclear Power Station (YNPS), Vermont Yankee Nuclear Power Station (VY) and Maine Yankee Atomic Power Station (MY).

At that time, we indicated that we would begin submitting reports on the new methods by early 1988.

The first report, "CASMO-3 Validation and Verification," is enclosed with this letter. CASMO-3 is a lattice physics code used to generate nuclear constants for application in spatial core models. The second report, "SIMULATE-3 Validation and Verification," will be submitted on or before July 1, 1988. SIMULATE-3 is an advanced nodal code used to generate physics data for reload analysis calculations.

Yankee intends to utilize these methods first in Cycle 21 of YNPS, scheduled for a summer 1990 stactup. A YNPS plant specific report will be submitted by December of 1988. We will begin the licensing analysis for Cycle 21 in April of 1989. Therefore, it would be helpful to us if we had some as;essment of the status of the review prior to this date. In addition, we will be submitting a Vermont Yankee plant specific report also by December of 1988. The Maine Yankee plant specific report will be submitted by December of 1989.

t f \ g!k gb C 8804210010 880411 9 DR ADOCK 0500 ,

0p 0\

U.S. Nuclear Regulatory Commission April 11, 1988 Page 2 We trust that you will find this submittal satisfactory. Please note that pursuant to the requirements of 100FR170, an application fee of $150 is enclosed.

In order to expedite the review process, we are willing to diccuss the intended method in a technical meeting at your earliest convenience.

Very truly yours, P

eor [apani,Jr.

Senior Proje t Engineer Licensing GP/ nib Enclosures cc UShtC Region 1 USNRC Resident Inspector, YNPS Nort Fairtile - Yankee Nuclear Power Station Project Manager Project Directorate I-3 Vern Rooney - Vermont Yankee Project Manager Project Directorate I-3 Patrick Sears - Maine Yankee Project Manager Project Directorate I-3 4