FVY-88-026, Forwards YAEC-1363, CASMO-3G Validation. Rept Entitled Simulate-3 Validation & Verification Will Be Submitted by 880701.Schedule for Submission of plant-specific Repts Re Subj Repts Stated.Fee Paid
ML20151H949 | |
Person / Time | |
---|---|
Site: | Vermont Yankee, Yankee Rowe, Maine Yankee, 05000000 |
Issue date: | 04/11/1988 |
From: | Papanic G YANKEE ATOMIC ELECTRIC CO. |
To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
Shared Package | |
ML20151H952 | List: |
References | |
FVY-88-026, FVY-88-26, FYR-88-048, FYR-88-48, MY-88-043, MY-88-43, NUDOCS 8804210010 | |
Download: ML20151H949 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N3901999-10-25025 October 1999
[Table view]Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217J0241999-10-13013 October 1999 Documents 991005 Telcon Between NRC & Util to Address All of Areas Identified in Reg Guide 1.179 & NUREG-1700 Re Final Survey Plan Except for One Area ML20217N8371999-10-13013 October 1999 Forwards Summary of Changes Made to Maine Yankee Defueled Security Plan,Iaw 10CFR50.54(p)(2).Without Encl ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217C1051999-10-0808 October 1999 Forwards Amend 153 to License DPR-3 & Safety Evaluation. Amend Revises TS Section 6.0,Administrative Controls,By Deleting TS Sections 6.2.2.f Which Contains Limits on Working Hours of Plant Staff ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J2231999-10-0101 October 1999 Forwards Copy of Environ Assessment & Fonsi Re 990317 Application for Amend to Revise TS Section 6.0 by Deleting TS Section 6.2.2.f Which Contains Limits on Working Hours of Plant Staff ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 ML20212F4321999-09-24024 September 1999 Responds to 990921 e-mail to E Poteat,Requesting Waiver of Late Charges of Listed Amount for Annual Fee Invoice AR0431-99.Request Denied Because 10CFR15.37 Does Not Provide for Waiver Based on Info Provided in e-mail ML20212M2431999-09-22022 September 1999 Expresses Concern Re NRC Consideration of Adoption of Policy Based on Requests from Licensees,To Allow as Part of Decommissioning of Nuclear Power Plants & Demolition of Onsite Structures at Reactor Plant Sites BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212F2521999-09-20020 September 1999 Confirms That NMSS Has Received 990916 Submittal & Will Be Included as Attachment to Commission Paper Along with State of Maine Submittal ML20212F1361999-09-20020 September 1999 Confirms That NMSS Has Received 990916 Submittal & Will Be Included as Attachment to Commission Paper Along with State of Maine Submittal ML20212E4611999-09-20020 September 1999 Responds to Concerning Possible Involvement in Weekly Telephone Calls NRC Staff Has with Maine Yankee Staff ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20212B7011999-09-14014 September 1999 Submits Comments & Raises Questions Re Generation of White Paper for Commission to Decide Merits of Rubberization ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation ML20212A5911999-09-0808 September 1999 Responds to 990816 e-mail & 990901 Telcon with Respect to Comments Re Decommissioning of Maine Yankee Site.Concerns Raised with Respect to Status of Fuel at Maine Yankee Have Been Raised in Previous Ltrs to Us NRC ML20211J5001999-08-31031 August 1999 Forwards Proposed Rev 29 to Yankee Decomissioning QA Program, for NRC Info & Approval.Yaec Requests That Rev 29, Dtd May 1999 & Originally Transmitted in Be Withdrawn from Further Consideration by NRC Staff BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution ML20212B2181999-08-30030 August 1999 Responds to Re 990707 Message from N Allen Re Transportation Incident Involving Shipment from Maine Yankee Nuclear Power Plant ML20211M9371999-08-30030 August 1999 Addresses Two Issues Raised in s to Senator Collins & Governor a King That Relate to Construction of ISFSI at Maine Yankee ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core ML20212E4841999-08-27027 August 1999 Informs That at 990429 Meeting of Myap Community Advisory Panel,R Shadis,Asked If Given Lack of Resident Inspectors & Limited NRC-license Review Correspondence,If Shadis Could Take Part in Weekly NRC Conference Calls with Licensee ML20211J2711999-08-27027 August 1999 Forwards Amend 152 to License DPR-3 & Safety Evaluation. Amend in Response to Application Dated 990324,deletes License Condition 2.C (10) Which States: Licensee Shall Maintain FFD Program IAW Requirements of 10CFR26 ML20216F1891999-08-26026 August 1999 Forwards Copies of Maine Yankee & Yankee Rowe Refs Listed, Supporting Industry Position That Branch Technical Position Asb 9-2 Methodology over-estimates Spent Fuel Decay Heat BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered ML20211C0591999-08-19019 August 1999 Forwards Addl Justification for Proprietary Request Re 990809 Submittal Info on Maine Yankee License Termination Plan BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 ML20212A5981999-08-16016 August 1999 Expresses Appreciation for with Respect to e-mail Message Re Site Release Criteria Standards Can Never Be Verified Using Existing Database ML20210S0621999-08-10010 August 1999 Forwards semi-annual fitness-for-duty Program Performance Data for six-month Period of 990101-990630,IAW 10CFR26.71(d) ML20217M6501999-08-0909 August 1999 Responds to 990719 E-mail Re Cleanup Stds at MYAPC Station & Verification of Meeting Cleanup Stds.Informs That NRC Criteria for Licensing NPPs Contained in 10CFR50 & That 10CFR50.82 Addresses Requirements for License Termination 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARML20217J0241999-10-13013 October 1999
[Table view]Documents 991005 Telcon Between NRC & Util to Address All of Areas Identified in Reg Guide 1.179 & NUREG-1700 Re Final Survey Plan Except for One Area ML20217N8371999-10-13013 October 1999 Forwards Summary of Changes Made to Maine Yankee Defueled Security Plan,Iaw 10CFR50.54(p)(2).Without Encl ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 ML20212M2431999-09-22022 September 1999 Expresses Concern Re NRC Consideration of Adoption of Policy Based on Requests from Licensees,To Allow as Part of Decommissioning of Nuclear Power Plants & Demolition of Onsite Structures at Reactor Plant Sites BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20212B7011999-09-14014 September 1999 Submits Comments & Raises Questions Re Generation of White Paper for Commission to Decide Merits of Rubberization ML20211J5001999-08-31031 August 1999 Forwards Proposed Rev 29 to Yankee Decomissioning QA Program, for NRC Info & Approval.Yaec Requests That Rev 29, Dtd May 1999 & Originally Transmitted in Be Withdrawn from Further Consideration by NRC Staff BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution ML20212E4841999-08-27027 August 1999 Informs That at 990429 Meeting of Myap Community Advisory Panel,R Shadis,Asked If Given Lack of Resident Inspectors & Limited NRC-license Review Correspondence,If Shadis Could Take Part in Weekly NRC Conference Calls with Licensee ML20216F1891999-08-26026 August 1999 Forwards Copies of Maine Yankee & Yankee Rowe Refs Listed, Supporting Industry Position That Branch Technical Position Asb 9-2 Methodology over-estimates Spent Fuel Decay Heat BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered ML20211C0591999-08-19019 August 1999 Forwards Addl Justification for Proprietary Request Re 990809 Submittal Info on Maine Yankee License Termination Plan BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 ML20212A5981999-08-16016 August 1999 Expresses Appreciation for with Respect to e-mail Message Re Site Release Criteria Standards Can Never Be Verified Using Existing Database ML20210S0621999-08-10010 August 1999 Forwards semi-annual fitness-for-duty Program Performance Data for six-month Period of 990101-990630,IAW 10CFR26.71(d) ML20210Q7201999-08-0909 August 1999 Forwards non-proprietary & Proprietary Draft Documents Re Info on Myap License Termination Plan & Diskette.Proprietary Info & Diskette Withheld ML20211D7041999-08-0909 August 1999 Forwards Rev 17 of Maine Yankee Defueled Safety Analysis Rept (Dsar), Per 10CFR50.71 & 10CFR50.4 ML20212B2271999-08-0606 August 1999 Discusses Concerns Re Recent Incindent Involving Transport of Nuclear Matl from Maine Yankee ML20210M8171999-08-0505 August 1999 Forwards Draft License Termination Plan/Amend Plan for Maine Yankee Atomic Power Co, to Enhance Dialogue Between Various Stakeholders & Provide Springboard for Clarifying Mutual Expectations.With Three Oversize Drawings ML20210L2211999-08-0202 August 1999 Forwards Two Copies of Objectives & Sequence of Events for Maine Yankee Emergency Preparedness Exercise for 990922. Without Encl BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20210F3691999-07-21021 July 1999 Submits Response to NRC Request for Clarification of Certain Details of Yaec Proposed Mods to Yankee Nuclear Power Station Defueled TS ML20216D4311999-07-19019 July 1999 Informs That Util Intends to Construct ISFSI Located on Owner Controlled Property Currently Part of Maine Yankee Reactor Site ML20217M6571999-07-19019 July 1999 Expresses Concern Re Verification of Cleanup Stds at Maine Yankee Atomic Power Co Power Station ML20210C6271999-07-15015 July 1999 Forwards Draft Site Characterization Summary in Support of 10CFR50 License Termination & Copy of Latest Decommissioning Schedule with Milestones Identified.Info Submitted Per License Termination Plan ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20209D4881999-07-0909 July 1999 Forwards Rev 29 to Decommissioning QA Program, for Info & NRC Approval,Iaw 10CFR50.54(a)(3).Attachment a Provides Listing of Changes,But Does Not Discuss All Refomatting, Grammatical,Editorial or Typographical Changes ML20209C3151999-07-0101 July 1999 Forwards Rev 9 to Security Plan,Reflecting Plant Decommissioning Activities & Continues to Provide Protection Against Radiological Sabotage.Rev Withheld ML20209C3271999-07-0101 July 1999 Forwards Rev 2 to Security Training & Qualification Plan.Rev Withheld ML20209C7731999-06-30030 June 1999 Responds to EDO Backfit Appeal Determination Re Emergency Plan Exemptions for Decommissioning Plants ML20210G3981999-06-30030 June 1999 Discusses Review of Ltr Re Maine Yankee Backfit Appeal with Respect to Emergency Plan Exemptions for Decommissioning Plants ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC 1999-09-29 Category:UTILITY TO NRC MONTHYEARML20059J2831990-09-10010 September 1990
[Table view]Forwards Updated Operator Licensing Exam Schedule for FY91, FY92,FY93 & FY94,per Generic Ltrs 90-07 & 89-12 ML20059G0411990-09-0707 September 1990 Lists Util Organizational Changes.Ac Kadak Named President & CEO & Jk Thayer Named vice-president,effective 901001 ML20059J6681990-09-0707 September 1990 Forwards Operator Licensing Natl Exam Schedule Through FY94, Per Generic Ltr 90-07 ML20059H1791990-09-0707 September 1990 Forwards Addl Info Re Control Element Assembly Failure at Facility ML20059G0351990-09-0606 September 1990 Advises That Util Intends to Modify Tech Specs Re Emergency Diesel Generator Surveillance Testing.Util Will Continue to Follow Testing Prescribed by Plant Tech Specs Until Such Time as Approval Received ML20059E1081990-08-28028 August 1990 Forwards Revised Diesel Generator Test Plan,Which Includes Addl Commitments Made During 900822 Discussions ML20059D9831990-08-28028 August 1990 Forwards fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71.NRC Review of Data Will Provide Realization That Positive Testing Rate Extremely Low & Limited to pre-access Testing Population BVY-90-087, Forwards Addl Info on Use of RELAP5YA Program for LOCA Analyses.Proprietary Encl Withheld1990-08-28028 August 1990 Forwards Addl Info on Use of RELAP5YA Program for LOCA Analyses.Proprietary Encl Withheld ML20059B8121990-08-24024 August 1990 Provides fitness-for-duty Program Performance Data for Period Ending 900630 BVY-90-086, Responds to NRC Re Violations Noted in Insp Rept 50-271/90-06.Corrective Actions:Incident Rept Initiated & All Required Locking Devices in Place by 9007061990-08-24024 August 1990 Responds to NRC Re Violations Noted in Insp Rept 50-271/90-06.Corrective Actions:Incident Rept Initiated & All Required Locking Devices in Place by 900706 ML20059F2861990-08-23023 August 1990 Responds to NRC Re Violations Noted in Insp Rept 50-309/90-10 Re RCS Inventory.Corrective Actions:Root Cause Evaluation Initiated & RCS Stabilized by Increasing Water Inventory & Venting ML20059F6681990-08-22022 August 1990 Comments on Review of Amend 115 to License DPR-28,including Safety Evaluation.Requests Explanation of Statement in NRC Re How NRC Considers Comments & What Resolution Could Be for Each Util Comment in ML20059E9341990-08-22022 August 1990 Responds to Violations Noted in Insp Rept 50-309/90-11. Corrective Actions:Work Planning Meeting Held Weekly & Radiological Controls Supervision Utilizing Plan of Wk to Assign Radiological Controls Technicians to Specific Jobs ML20056B3561990-08-20020 August 1990 Forwards fitness-for-duty Program Performance Data for Jan- June 1990 ML20059B3941990-08-17017 August 1990 Advises That Util Performed Automated Ultrasonic Insp of Pressurizer Vessel Cladding Interface at Plant During 1990 Refueling Outage.Results of Insp Continue to Indicate No Evidence of Any Cladding Indication BVY-90-085, Informs That Sys Testing & Operator Training Successfully Completed & SPDS Declared Operable on 900813.Util Intends to Operate SPDS in Parallel W/Original Honeywell Gepac Plant Computer Until mid-Nov 19901990-08-15015 August 1990 Informs That Sys Testing & Operator Training Successfully Completed & SPDS Declared Operable on 900813.Util Intends to Operate SPDS in Parallel W/Original Honeywell Gepac Plant Computer Until mid-Nov 1990 ML20059A8111990-08-10010 August 1990 Responds to Emergency Preparedness Exercise & Routine Insp Repts 50-309/88-09 & 90-14,respectively.Corrective Actions: Remedial Training Will Be Given to Available Emergency Coordinators in Use of Procedures for Developing PARs ML20058N0811990-08-0909 August 1990 Request Relief from ASME Section XI Requirements for Low Pressure Surge Tank Cooling Pumps,Per Generic Ltr 89-04 as Result of Review of Facility Inservice Testing Program ML20058P3741990-08-0909 August 1990 Forwards Monthly Operating Rept for Jul 1990 for Maine Yankee Atomic Power Station & Revised Rept for June 1990 ML20058L2241990-08-0303 August 1990 Forwards Peer Review of 900705 Reactor Pressure Vessel Evaluation,Prepared by Le Steele.Review Indicates Agreement W/Methodology in Chapter 5 of Evaluation ML20058L2211990-08-0202 August 1990 Forwards Results of PTS Sensitivity Study for Mean Values of Ref Temps for Four Matls in Beltline Region ML20055J2011990-07-27027 July 1990 Provides Steam Generator Insp Results & Advises of Nine Defective Tubes Discovered During Jul 1990 Insp.Complete Results Will Follow within 12 Months,Per Tech Spec 4.4.10.5.b ML20055H6701990-07-25025 July 1990 Forwards Decommissioning Funding Assurance Rept & Certification, Per 10CFR50.75.Rept Includes Certification That Reasonable Assurance Will Be Provided That Funds Will Be Available for Decommissioning BVY-90-082, Informs That Effective 900723 Facility Implemented Rev 4 of Procedure Generating Package & Corresponding Revs to Eops. Revs Developed Per Rev 4 of BWR Owners Group Emergency Procedure Guidelines1990-07-24024 July 1990 Informs That Effective 900723 Facility Implemented Rev 4 of Procedure Generating Package & Corresponding Revs to Eops. Revs Developed Per Rev 4 of BWR Owners Group Emergency Procedure Guidelines BVY-90-084, Notifies NRC of Intentions to Install Test Fuel Assemblies & Test Control Blades During Cycle 15 Refueling Outage in Sept 19901990-07-24024 July 1990 Notifies NRC of Intentions to Install Test Fuel Assemblies & Test Control Blades During Cycle 15 Refueling Outage in Sept 1990 ML20055G6651990-07-20020 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Model 1153 Series D Transmitters Not Currently in Use at Plant BVY-90-071, Forwards Rev 2 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)1990-07-20020 July 1990 Forwards Rev 2 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) ML20055G6961990-07-20020 July 1990 Forwards YAEC-1731, Yankee Nuclear Power Station Core 21 Performance Analysis. Results of Analysis Demonstrate That Plant Performance Well within Acceptable Limits ML20055G6781990-07-19019 July 1990 Forwards, Yankee Plant Small Break LOCA Analysis ML20055G7031990-07-19019 July 1990 Forwards Rev 0 to Yankee Cycle 21 Core Operating Limits Rept. Cycle Scheduled for Startup on 900811 ML20055G6881990-07-19019 July 1990 Submits Results of Analysis of Component Cooling Heat Balance to Support Operation at 2,700 Mwt.Prior Administrative Controls Overly Conservative & No Longer Required BVY-90-078, Forwards List of Refs for Proposed Change 161 to Facility OL & Tech Specs1990-07-17017 July 1990 Forwards List of Refs for Proposed Change 161 to Facility OL & Tech Specs ML20055H8291990-07-16016 July 1990 Forwards Response to Request for Addl Info Re YAEC-1710, Yankee Nuclear Power Station Pilot Evaluation Rept for Plant License Renewal, & YAEC-1727P, Methodology for Identifying Potential Fluid Component Age-Related.. ML20055H0021990-07-16016 July 1990 Forwards Rev 24 to Security Plan.Rev Withheld ML20055E1531990-07-0505 July 1990 Forwards Reactor Pressure Vessel Evaluation Rept, in Response to NRC 900501,07 & 15 Requests for Addl Info. Specific Chapters Re Requests Listed ML20055E0641990-07-0303 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Outstanding Procurement Actions for Rosemount Pressure & Differential Pressure Transmitters Modified to Specify Mfg After 890711 ML20055D0371990-07-0202 July 1990 Responds to 900319 Commitment to Provide Scope & Schedule for Confirmatory Analysis for Steam Generator Overfill Protection by 900702.Scope of Analysis Will Include Identification of Potential Overfill Scenarios ML20055E0501990-07-0202 July 1990 Responds to Info Notice 88-085 & NRC Bulletin 89-002 Re Two Anchor/Darling Swing Check Valves.Neither Valve Found to Have Any Svc Induced Cracking of Bolting.Existing Bolting Replaced W/Type 17-4PH Matl (Specification A564-630-1100) ML20058K3601990-06-28028 June 1990 Forwards Addl Info to Support Proposed Change 234,modifying Tech Specs to Incorporate Wording Consistent w/NUREG-0452, STS for Westinghouse PWRs Re Min Discharge Pressure ML20058K3021990-06-27027 June 1990 Provides Addl Info for Proposed Change 227 to License DPR-3. One Addl LPSI Pump Must Be Capable of Being Placed in Operable Status When Utilizing Spec 3.10.6 BVY-90-072, Forwards Supplemental Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters 1989,Including Annual Radiological Impact on Man for 19891990-06-27027 June 1990 Forwards Supplemental Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters 1989,Including Annual Radiological Impact on Man for 1989 ML20055D4611990-06-25025 June 1990 Responds to NRC Re Violations Noted in Insp Rept 50-309/89-82.Corrective Actions:Testing Program Developed & Implemented for Testing of Molded Case Circuit Breakers & Procedure Modified to Address Revised Dedication Process ML20043G4351990-06-15015 June 1990 Requests Temporary Waiver of Compliance from Tech Spec Requirements for Limiting Conditions for Operation for Certain post-accident Monitoring Instrumentation Listed in Tech Spec Table 3.2.6.Parameters Listed ML20043E4011990-06-0808 June 1990 Responds to Second Request for Addl Info on Use of RELAP5YA. Explanation Re Why More Accurate View Factor Calculation Not Included in Huxy Code Addressed ML20043C5991990-06-0101 June 1990 Forwards Accepted Version of YAEC-1683-A, MICBURN-3/ CASMO-3/TABLES-3/SIMULATE-3 Benchmarking of Vermont Yankee Cycles 9 Through 13. ML20043C6131990-06-0101 June 1990 Forwards YAEC-1659-A, Simulate-3 Validation & Verification. ML20043C4821990-05-30030 May 1990 Informs of Three Organizational Changes That Will Become Effective on 900601.WP Murphy,Jp Pelletier & DA Reid Will Be Senior Vice President of Operations,Newly Created Vice President of Engineering & Plant Manager,Respectively ML20043B7561990-05-23023 May 1990 Informs That Util Intends to Utilize Relationship Between Frosstey & FROSSTEY-2 to Support Cycle 15 Calculations.Nrc Approval of FROSSTEY-2 Needed by Aug 1990 for LOCA Analysis Program 1990-09-07 |
Contents
Text
___ _,
Te.'whone t617) GT2-c100 TWX 710-380-7319 YANKEE ATOMIC ELECTRIC COMPANY y 1671 Worcester Road, Framingham, Massachusetts 01701 FYR-88-048 FVY-88-026 MY-88-043 April 11, 1988 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 2v555
Reference:
(a) License No. DPR-03 (Docket No.50-029)
(b) License No. DPR-28 (Docket No. 50-271)
(c) License No. DPR-36 (Docket No. 50-309)
Subject:
Submittal of new Reactor Physics Methods reports and schedule for submitting plant specific reports.
Dear Sir:
Yankee met with the USNRC on August 25, 1987 to discuss our plans to utilize new reactor physics methods for Yankee Nuclear Power Station (YNPS), Vermont Yankee Nuclear Power Station (VY) and Maine Yankee Atomic Power Station (MY).
At that time, we indicated that we would begin submitting reports on the new methods by early 1988.
The first report, "CASMO-3 Validation and Verification," is enclosed with this letter. CASMO-3 is a lattice physics code used to generate nuclear constants for application in spatial core models. The second report, "SIMULATE-3 Validation and Verification," will be submitted on or before July 1, 1988. SIMULATE-3 is an advanced nodal code used to generate physics data for reload analysis calculations.
Yankee intends to utilize these methods first in Cycle 21 of YNPS, scheduled for a summer 1990 stactup. A YNPS plant specific report will be submitted by December of 1988. We will begin the licensing analysis for Cycle 21 in April of 1989. Therefore, it would be helpful to us if we had some as;essment of the status of the review prior to this date. In addition, we will be submitting a Vermont Yankee plant specific report also by December of 1988. The Maine Yankee plant specific report will be submitted by December of 1989.
t f \ g!k gb C 8804210010 880411 9 DR ADOCK 0500 ,
0p 0\
U.S. Nuclear Regulatory Commission April 11, 1988 Page 2 We trust that you will find this submittal satisfactory. Please note that pursuant to the requirements of 100FR170, an application fee of $150 is enclosed.
In order to expedite the review process, we are willing to diccuss the intended method in a technical meeting at your earliest convenience.
Very truly yours, P
eor [apani,Jr.
Senior Proje t Engineer Licensing GP/ nib Enclosures cc UShtC Region 1 USNRC Resident Inspector, YNPS Nort Fairtile - Yankee Nuclear Power Station Project Manager Project Directorate I-3 Vern Rooney - Vermont Yankee Project Manager Project Directorate I-3 Patrick Sears - Maine Yankee Project Manager Project Directorate I-3 4