Issue date | Title | Topic | |
---|---|---|---|
ML20217J024 | 13 October 1999 | Documents 991005 Telcon Between NRC & Util to Address All of Areas Identified in Reg Guide 1.179 & NUREG-1700 Re Final Survey Plan Except for One Area | |
ML20217N837 | 13 October 1999 | Forwards Summary of Changes Made to Maine Yankee Defueled Security Plan,Iaw 10CFR50.54(p)(2).Without Encl | |
ML20217F126 | 12 October 1999 | Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 | Safe Shutdown |
BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station | 8 October 1999 | Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station | |
BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl | 6 October 1999 | Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl | |
ML20216J353 | 29 September 1999 | Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process | Maintenance Rule Program |
BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 | 28 September 1999 | Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 | |
ML20212M243 | 22 September 1999 | Expresses Concern Re NRC Consideration of Adoption of Policy Based on Requests from Licensees,To Allow as Part of Decommissioning of Nuclear Power Plants & Demolition of Onsite Structures at Reactor Plant Sites | |
BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing | 21 September 1999 | Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing | |
BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested | 21 September 1999 | Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested | |
BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 | 21 September 1999 | Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 | |
BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal | 20 September 1999 | Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal | |
BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld | 16 September 1999 | Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Earthquake |
BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions | 16 September 1999 | Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions | |
ML20212B701 | 14 September 1999 | Submits Comments & Raises Questions Re Generation of White Paper for Commission to Decide Merits of Rubberization | |
ML20211J500 | 31 August 1999 | Forwards Proposed Rev 29 to Yankee Decomissioning QA Program, for NRC Info & Approval.Yaec Requests That Rev 29, Dtd May 1999 & Originally Transmitted in Be Withdrawn from Further Consideration by NRC Staff | |
BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp | 31 August 1999 | Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp | |
BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution | 31 August 1999 | Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution | |
ML20212E484 | 27 August 1999 | Informs That at 990429 Meeting of Myap Community Advisory Panel,R Shadis,Asked If Given Lack of Resident Inspectors & Limited NRC-license Review Correspondence,If Shadis Could Take Part in Weekly NRC Conference Calls with Licensee | |
ML20216F189 | 26 August 1999 | Forwards Copies of Maine Yankee & Yankee Rowe Refs Listed, Supporting Industry Position That Branch Technical Position Asb 9-2 Methodology over-estimates Spent Fuel Decay Heat | |
BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies | 26 August 1999 | Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies | Ultimate heat sink |
BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered | 19 August 1999 | Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered | Generic Fundamentals Examination |
ML20211C059 | 19 August 1999 | Forwards Addl Justification for Proprietary Request Re 990809 Submittal Info on Maine Yankee License Termination Plan | |
BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 | 18 August 1999 | Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 | |
ML20212A598 | 16 August 1999 | Expresses Appreciation for with Respect to e-mail Message Re Site Release Criteria Standards Can Never Be Verified Using Existing Database | Fuel cladding |
ML20210S062 | 10 August 1999 | Forwards semi-annual fitness-for-duty Program Performance Data for six-month Period of 990101-990630,IAW 10CFR26.71(d) | Fitness for Duty |
ML20210Q720 | 9 August 1999 | Forwards non-proprietary & Proprietary Draft Documents Re Info on Myap License Termination Plan & Diskette.Proprietary Info & Diskette Withheld | |
ML20211D704 | 9 August 1999 | Forwards Rev 17 of Maine Yankee Defueled Safety Analysis Rept (Dsar), Per 10CFR50.71 & 10CFR50.4 | |
ML20212B227 | 6 August 1999 | Discusses Concerns Re Recent Incindent Involving Transport of Nuclear Matl from Maine Yankee | |
ML20210M817 | 5 August 1999 | Forwards Draft License Termination Plan/Amend Plan for Maine Yankee Atomic Power Co, to Enhance Dialogue Between Various Stakeholders & Provide Springboard for Clarifying Mutual Expectations.With Three Oversize Drawings | |
ML20210L221 | 2 August 1999 | Forwards Two Copies of Objectives & Sequence of Events for Maine Yankee Emergency Preparedness Exercise for 990922. Without Encl | |
BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings | 2 August 1999 | Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings | |
ML20210M579 | 30 July 1999 | Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed | |
ML20211E170 | 28 July 1999 | Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS | |
ML20210G427 | 27 July 1999 | Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 | Fitness for Duty |
ML20210G504 | 27 July 1999 | Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 | |
ML20210J303 | 27 July 1999 | Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change | Fuel cladding |
ML20210F369 | 21 July 1999 | Submits Response to NRC Request for Clarification of Certain Details of Yaec Proposed Mods to Yankee Nuclear Power Station Defueled TS | |
ML20216D431 | 19 July 1999 | Informs That Util Intends to Construct ISFSI Located on Owner Controlled Property Currently Part of Maine Yankee Reactor Site | |
ML20217M657 | 19 July 1999 | Expresses Concern Re Verification of Cleanup Stds at Maine Yankee Atomic Power Co Power Station | |
ML20210C627 | 15 July 1999 | Forwards Draft Site Characterization Summary in Support of 10CFR50 License Termination & Copy of Latest Decommissioning Schedule with Milestones Identified.Info Submitted Per License Termination Plan | |
ML20209J060 | 14 July 1999 | Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included | |
ML20209G153 | 12 July 1999 | Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 | Minimum Critical Power Ratio |
ML20209D488 | 9 July 1999 | Forwards Rev 29 to Decommissioning QA Program, for Info & NRC Approval,Iaw 10CFR50.54(a)(3).Attachment a Provides Listing of Changes,But Does Not Discuss All Refomatting, Grammatical,Editorial or Typographical Changes | Nondestructive Examination Condition Adverse to Quality Liquid penetrant |
ML20209C315 | 1 July 1999 | Forwards Rev 9 to Security Plan,Reflecting Plant Decommissioning Activities & Continues to Provide Protection Against Radiological Sabotage.Rev Withheld | |
ML20209C327 | 1 July 1999 | Forwards Rev 2 to Security Training & Qualification Plan.Rev Withheld | |
ML20209C773 | 30 June 1999 | Responds to EDO Backfit Appeal Determination Re Emergency Plan Exemptions for Decommissioning Plants | Exemption Request Backfit |
ML20210G398 | 30 June 1999 | Discusses Review of Ltr Re Maine Yankee Backfit Appeal with Respect to Emergency Plan Exemptions for Decommissioning Plants | Exemption Request Backfit |
ML20196J232 | 30 June 1999 | Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible | |
ML20196J742 | 29 June 1999 | Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC |