|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEAR3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With 3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With ML20210U5341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Crystal River,Unit 3 3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With ML20210U5411999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3 ML20210U5601999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3 3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With ML20210U5631999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3 3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With 3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With 3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With 3F0199-05, Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With 3F1298-13, Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With 3F1198-05, Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With 3F1098-06, Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With 3F0998-07, Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With 3F0898-02, Monthly Operating Rept for Jul 1998 for Crystal River,Unit 11998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Crystal River,Unit 1 3F0798-01, Monthly Operating Rept for June 1998 for Crystal River Unit 31998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Crystal River Unit 3 3F0698-02, Monthly Operating Rept for May 1998 for Crystal River Unit 31998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Crystal River Unit 3 3F0598-07, Monthly Operating Rept for Apr 1998 for Crystal River Unit 31998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Crystal River Unit 3 3F0498-07, Monthly Operating Rept for Mar 1998 for Crystal River,Unit 31998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Crystal River,Unit 3 3F0398-05, Monthly Operating Rept for Feb 1998 for Crystal River, Unit 31998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Crystal River, Unit 3 3F0298-06, Monthly Operating Rept for Jan 1998 for Crystal River,Unit 31998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Crystal River,Unit 3 3F0198-05, Monthly Operating Rept for Dec 1997 for Crystal River,Unit 31997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Crystal River,Unit 3 3F1297-02, Monthly Operating Rept for Nov 1997 for Crystal River,Unit 31997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Crystal River,Unit 3 3F1197-02, Monthly Operating Rept for Oct 1997 for Crystal River, Unit 31997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Crystal River, Unit 3 3F1097-03, Monthly Operating Rept for Sept 1997 for Crystal River,Unit 31997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Crystal River,Unit 3 3F0997-08, Monthly Operating Rept for Aug 1997 for Crystal River1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Crystal River 3F0897-04, Monthly Operating Rept for Jul 1997 for Crystal River Unit 31997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Crystal River Unit 3 3F0797-01, Monthly Operating Rept for June 1997 for Crystal River Unit 31997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Crystal River Unit 3 3F0697-01, Monthly Operating Rept for May 1997 for Crystal River 31997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Crystal River 3 3F0597-02, Monthly Operating Rept for Apr 1997 for Crystal River Unit 31997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Crystal River Unit 3 3F0497-01, Monthly Operating Rept for Mar 1997 for Crystal River Unit 31997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Crystal River Unit 3 3F0397-07, Monthly Operating Rept for Feb 1997 for Crystal River Unit 31997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Crystal River Unit 3 3F0297-08, Monthly Operating Rept for Jan 1997 for Crystal River Unit 31997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Crystal River Unit 3 3F0197-08, Monthly Operating Rept for Dec 1996 for Crystal River Unit 31996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Crystal River Unit 3 3F1296-03, Monthly Operating Rept for Nov 1996 for Crystal River Unit 31996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Crystal River Unit 3 3F1196-08, Monthly Operating Rept for Oct 1996 for Crngp1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Crngp 3F1096-03, Monthly Operating Rept for Sept 1996 for Crystal River Unit 31996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Crystal River Unit 3 ML20117N5101996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Crystal River Unit 3 3F0896-01, Monthly Operating Rept for Jul 1996 for Crystal River Unit 31996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Crystal River Unit 3 3F0796-01, Monthly Operating Rept for June 1996 for Crystal River Unit 31996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Crystal River Unit 3 3F0696-02, Monthly Operating Rept for May 1996 for Crystal River Unit 31996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Crystal River Unit 3 3F0596-08, Monthly Operating Rept for Apr 1996 for Crystal River Unit 31996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Crystal River Unit 3 3F0496-12, Monthly Operating Rept for Mar 1996 for Crystal River,Unit 31996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Crystal River,Unit 3 3F0396-06, Monthly Operating Rept for Feb 1996 for Crystal River Unit 31996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Crystal River Unit 3 3F0296-14, Monthly Operating Rept for Jan 1996 for Crystal River Unit 31996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Crystal River Unit 3 3F0196-05, Monthly Operating Rept for Dec 1995 for Crystal River Unit 31995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Crystal River Unit 3 3F1295-02, Monthly Operating Rept for Nov 1995 for Crystal River Unit 31995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Crystal River Unit 3 3F1195-02, Monthly Operating Rept for Oct 1995 for Crystal River Unit 31995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Crystal River Unit 3 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G0191999-10-15015 October 1999 Safety Evaluation Concluding That Licensee Followed Analytical Methods Provided in GL 90-05.Grants Relief Until Next Refueling Outage,Scheduled to Start on 991001.Temporary non-Code Repair Must Then Be Replaced with Code Repair 3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated1999-10-13013 October 1999 Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated ML20217B0931999-10-0606 October 1999 Part 21 Rept Re Damaged Safety Grade Electrical Cabling Found in Supply on 990831.Damage Created During Cabling Process While Combining Three Conductors Just Prior to Closing.Vendor Notified of Reporting of Issue ML20212L0881999-10-0404 October 1999 SER Accepting Licensee Requests for Relief 98-012 to 98-018 Related to Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp for Crystal River Unit 3 ML20212J8631999-10-0101 October 1999 Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i) ML20212E9031999-09-30030 September 1999 FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999 3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With ML20212E6911999-09-21021 September 1999 Safety Evaluation Supporting Proposed EALs Changes for Plant Unit 3.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20211L1321999-08-31031 August 1999 EAL Basis Document 3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With ML20212C1501999-08-31031 August 1999 Non-proprietary Version of Rev 0 to Crystal River Unit 3 Enhanced Spent Fuel Storage Engineering Input to LAR Number 239 ML20211B7291999-08-16016 August 1999 Rev 2 to Cycle 11 Colr ML20210P1111999-08-0505 August 1999 SER Accepting Evaluation of Third 10-year Interval Inservice Insp Program Requests for Relief for Plant,Unit 3 ML20210U5341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Crystal River,Unit 3 ML20209F5601999-07-31031 July 1999 EAL Basis Document, for Jul 1999 3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With ML20210U5411999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3 3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With ML20210U5601999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3 ML20195C6271999-05-28028 May 1999 Non-proprietary Rev 0 to Addendum to Topical Rept BAW-2346P, CR-3 Plant Specific MSLB Leak Rates ML20196L2031999-05-19019 May 1999 Non-proprietary Rev 0 to BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs 3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With ML20210U5631999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3 3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With ML20204D9661999-03-31031 March 1999 Non-proprietary Rev 1,Addendum a to BAW-2342, OTSG Repair Roll Qualification Rept 3F0399-04, Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease1999-03-10010 March 1999 Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease 3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With ML20203A4381999-02-0303 February 1999 Safety Evaluation Supporting EAL Changes for License DPR-72, Per 10CFR50.47(b)(4) & App E to 10CFR50 ML20206E9891998-12-31031 December 1998 Kissimmee Utility Authority 1998 Annual Rept ML20206E9021998-12-31031 December 1998 Florida Progress Corp 1998 Annual Rept ML20206E9701998-12-31031 December 1998 Ouc 1998 Annual Rept. with Financial Statements from Seminole Electric Cooperative,Inc 3F0199-05, Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With ML20206E9261998-12-31031 December 1998 Gainesville Regional Utilities 1998 Annual Rept 3F1298-13, Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With 3F1198-05, Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With ML20155F4071998-10-31031 October 1998 Rev 2 to Pressure/Temp Limits Rept ML20155J2701998-10-28028 October 1998 Second Ten-Year Insp Interval Closeout Summary Rept 3F1098-06, Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With ML20206E9461998-09-30030 September 1998 Utilities Commission City of New Smyrna Beach,Fl Comprehensive Annual Financial Rept Sept 30,1998 & 1997 ML20206E9561998-09-30030 September 1998 City of Ocala Comprehensive Annual Financial Rept for Yr Ended 980930 ML20206E9101998-09-30030 September 1998 City of Bushnell Fl Comprehensive Annual Financial Rept for Fiscal Yr Ended 980930 ML20206E9811998-09-30030 September 1998 City of Tallahassee,Fl Comprehensive Annual Financial Rept for Yr Ended 980930 ML20195E3121998-09-30030 September 1998 Comprehensive Annual Financial Rept for City of Leesburg,Fl Fiscal Yr Ended 980930 3F0998-07, Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With ML20236W6501998-07-31031 July 1998 Emergency Action Level Basis Document 3F0898-02, Monthly Operating Rept for Jul 1998 for Crystal River,Unit 11998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Crystal River,Unit 1 ML20236V8801998-07-30030 July 1998 Control Room Habitability Rept 3F0798-01, Monthly Operating Rept for June 1998 for Crystal River Unit 31998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Crystal River Unit 3 ML20236Q4611998-06-30030 June 1998 SER for Crystal River Power Station,Unit 3,individual Plant Exam (Ipe).Concludes That Plant IPE Complete Re Info Requested by GL 88-20 & IPE Results Reasonable Given Plant Design,Operation & History 3F0698-02, Monthly Operating Rept for May 1998 for Crystal River Unit 31998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Crystal River Unit 3 1999-09-30
[Table view] |
Text
- . _ _ - . ~ . . . . . _ - , . . ~ - . - .- --- . - . . - . ~ . ~ -
6, *
^
3 OPERATING DATA REPORT DOCKET NO. 50-302
, DATE 5/1/a7 COMPLETED 8Y m c .hm.
TELEPHONE <;;g 7=5-3802 OPERATING STATUS 4
- 1. Unit Name: creatal River Unit 3 Notes
- 2. Reportug Pened: 4/1/87 - 4/30/87
- 3. Licensed T;sermal Power (MWt): 2544
- 4. Namepiste Rating (Gross MWe): 890
- 5. Design Electrical Ratang (Not MWe): 825
- 6. Maximum Dependable Capacity (Gross MWe): ""
, 7. Maximum Dependable Capacity (Net MWe): 821
- 8. If Changes Occur in Capacity Ratangs (Iteens Number 3 Thsough 7) Since Last Report. Give Reasons-E/A -
- 9. Power Level To Which Resencted. If Any (Et MWe): N/A
- 10. Reasons For Resenctions.lf Any: N/A
. in 4: j'1 This Month . Yr..to.Dete Cumuistive "-
i
- 11. Hours In Reporting Pened 719 2879 88823
- 12. Number Of Hours Reactor Was Critical 719 2376 56368.4
- 13. Reactor Reserve Shutdown Hours 0 0 1280.3 l
- 14. Hours Generator On Line 719 2371 55123.1
, 15. Unit Reenrve Shutdown Hours 0 - 0 0
- 16. Gross Themal Emergy Generated (MWH) 1580526 5514743 124118680 .
- 17. Gross Ele.:trical Energy Generated (MWH) "" aa . 1e9911e 42477550
- 18. Nt Elecencal Energy Generated (MWH) %*aaAa 1R27354 40340152
- 19. Unit Service Factor 1001 82.4% 62.11 -
- 20. Unit Avadsbility Factor inni 82.4% 62.1%
- 21. Unit Capacity Factor (Using MDC Nt) na 11 77.3% 56.8%
- 22. Unit Capacity Factor (Using DER Net) 87.7% 76.9% 55.1%
- 23. Unit Forced Outage Rate 01 17.6% 23. 5'A
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Dete.and Duration of Eachl: .
Refuel outane scheduled to begin September 19, 1987 and last 12 weeks.
- 25. If Shut Down At End Of Report Period. Estisnated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operationi: Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY
} COMMERCIAL OPERATION 1/to177 3/13/77 R PDR g(
,- a AVERAGE DAILY UNIT POWER LEVEL
",'g-DOCKET NO. m u, UNIT F'M *-3 DATE 5/1/87 COMPLEED BY D. cr-h-TELEPHONE (904) 795-3802 MONTH 4/87 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 809 37 7%
2 7A1 jg 777 .
3 818 g9 783 4 798 20 783 5 792 21 780 6 798 22 767
.g 7 792 23 773 N g 545 24 719 9 544 25 545 10 , 540 26 788
~
11 951 27 . 788 12 u? 746 23 13 545 29 728 14 771 30 767 15 791 31 16 793 ,
INSTRUCTIONS On this format.hst the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.
(9/77 )
w
<e-w w an.-,--r,----v.-- , - , - p--------w--- - - , - - - - - - - - - - ---,,---m-,--,~,- -------r--,--,-,r- ,-----+-.--------r--~ -+ , - , ,
_ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ . _ _ .~ _ _ . _ _ _ .. ._. _
i
N
(, V -
}
o 1, .
i .
DOCKET NO' u-us l UNIT SHUTDOWNS AND POWER REDUCTIONS = = =
COMPLETED BY 'a = * -
j REFORT MONTH 4/a7 MEPHONE CJ m a "k -
- jg } .3 7j Licensee E, Ea g a. Cause & Corrective i No. Date E E=
j$
5
)sE Event *T A0 5-3 Action to i j;gg Report *
[U Prevent Recurrence 6
I 1
l l 87-Ol i 870408 F 0.0 A 9 N/A BR PumpII Lower Motor Bearing Failure On
} Condensate Pump (CDP) 1A. l 87-0; 8B425 5 0.0 5 5 N/A ME PumpII j Main Purpose for Load Reduction Use [
to Investigate Cause for Excessive vibration on Condemente Pump (CDP-15). During the Beduction, Other Maintenance Activities were 1
i '
Performed. They were: Replace i
I Sacrificial' Iron Crating in ;
circulating Waterbou "C"; Tighten '
Shaft Sleeve on Booster Feedwater Pump 15.
E i
t 2 3 4
'(: Forced Reason: Ma6had Exhibit G Instauctions 5: Scheduled A Equipment Failure (Emplain) 1-Man I for Preperation of Deta B-Meintenance of Test 2-Mans 1 Scra. Entry Sheets for IAvnsee C Refueling .3-Auto Scras. Event Report (LER) File (NUREG.
D-Regulatory Restriction '4-Continued 0161) t E-Operator Training & Ucense Emendnatkm .
5-Reduced toad j F Administret'ive '-'th*" 5 j G-Operational Error (Emplain) Exhibit 1 - Same Source j 19/77) IIOther (Emplain)
, *- . V MONTHLY OPERATIONAL
SUMMARY
STATEMENT
-t DOCKET NO. 50-302 UNIT FLCRP-3 DATE 5/1/87 COMPLETED BY J. O. Molton TELEPHONE (904) 795-3802 MONTH 4/87
SUMMARY
STATEMENT:
Crystal River Unit 3 remained on line all month with two major load reductions, each involving different condensate. pumps.
[.* 's 4
i o
e W
o* "*
a t@.....gA a:
Florida Power CORPORA 7 ION May 8, 1987 3F0587-06 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached is the Crystal River Unit 3 April 1987 Monthly Operating Report.
This report is submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, E. C. Simpson Acting Director, Nuclear Site Support AEF/sdr Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Mr. T. F. Stetka Resident Inspector ff0Y GENERAL OFFICE: 3201 Thirty-fourth Street South
- St. Petersburg, Florida 33733 * (813) 866-5151
'lf A Florida Progress Company