3F0587-06, Monthly Operating Rept for Apr 1987

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1987
ML20215L558
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/30/1987
From: Graham D, Eric Simpson
FLORIDA POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
3F0587-06, 3F587-6, NUDOCS 8705120284
Download: ML20215L558 (5)


Text

-. _ _

. ~..

. ~ -.

-. ~. ~ -

6,

^

3 OPERATING DATA REPORT DOCKET NO.

50-302 DATE 5/1/a7 COMPLETED 8Y m c.hm.

TELEPHONE

<;;g 7=5-3802 OPERATING STATUS 4

1. Unit Name:

creatal River Unit 3 Notes

2. Reportug Pened: 4/1/87 - 4/30/87
3. Licensed T;sermal Power (MWt):

2544

4. Namepiste Rating (Gross MWe):

890

5. Design Electrical Ratang (Not MWe):

825

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

821

8. If Changes Occur in Capacity Ratangs (Iteens Number 3 Thsough 7) Since Last Report. Give Reasons-E/A
9. Power Level To Which Resencted. If Any (Et MWe):

N/A

10. Reasons For Resenctions.lf Any:

N/A in 4: j'1 This Month.

Yr..to.Dete Cumuistive

11. Hours In Reporting Pened 719 2879 88823 i
12. Number Of Hours Reactor Was Critical 719 2376 56368.4
13. Reactor Reserve Shutdown Hours 0

0 1280.3 l

14. Hours Generator On Line 719 2371 55123.1
15. Unit Reenrve Shutdown Hours 0

0 0

16. Gross Themal Emergy Generated (MWH) 1580526 5514743 124118680
17. Gross Ele.:trical Energy Generated (MWH)

"" aa 1e9911e 42477550

18. Nt Elecencal Energy Generated (MWH)

%*aaAa 1R27354 40340152

19. Unit Service Factor 1001 82.4%

62.11

20. Unit Avadsbility Factor inni 82.4%

62.1%

21. Unit Capacity Factor (Using MDC Nt) na 11 77.3%

56.8%

22. Unit Capacity Factor (Using DER Net) 87.7%

76.9%

55.1%

23. Unit Forced Outage Rate 01 17.6%
23. 5'A
24. Shutdowns Scheduled Over Next 6 Months (Type.Dete.and Duration of Eachl:

Refuel outane scheduled to begin September 19, 1987 and last 12 weeks.

25. If Shut Down At End Of Report Period. Estisnated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi:

Forecast Achieved INITIAL CRITICALITY 1/14/77

}

INITIAL ELECTRICITY 1/to177 COMMERCIAL OPERATION 3/13/77 R

PDR g(

a AVERAGE DAILY UNIT POWER LEVEL

",'g DOCKET NO.

m u, UNIT F'M *-3 DATE 5/1/87 COMPLEED BY D. cr-h-TELEPHONE (904) 795-3802 MONTH 4/87 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 809 37 7%

2 7A1 jg 777 3

818 g9 783 4

798 20 783 5

792 21 780 6

798 22 767

.g 7

792 23 773 N

g 545 24 719 9

544 25 545 10,

540 788 26

~

11 951 27 788 12 u?

23 746 13 545 29 728 14 771 30 767 15 791 31 16 793 INSTRUCTIONS On this format.hst the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.

(9/77 )

w

<e-w w

an.-,--r,----v.--

p--------w---

---,,---m-,--,~,-


r--,--,-,r-

,-----+-.--------r--~

-+, -,,

.~

i

N

}

(,

V o

1, i

l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO' u-us N

E

=

  • DATE SII#8' t

4 COMPLETED BY

'a

= * -

j REFORT MONTH 4/a7 MEPHONE CJ m a "k

.3 7j Licensee E,

g a.

Cause & Corrective i

E jg

}

a No.

Date E

E=

)sE Event

  • T 5-3 Action to i

j$

5 j;gg Report

  • A0

[U Prevent Recurrence 6

I 1

l l

87-Ol 870408 F

0.0 A

9 N/A BR PumpII Lower Motor Bearing Failure On i

}

Condensate Pump (CDP) 1A.

l l

87-0; 8B425 5

0.0 5

5 N/A ME PumpII Main Purpose for Load Reduction Use

[

j to Investigate Cause for Excessive vibration on Condemente Pump (CDP-15).

During the Beduction, 1

Other Maintenance Activities were Performed. They were: Replace i

i I

Sacrificial' Iron Crating in circulating Waterbou "C"; Tighten Shaft Sleeve on Booster Feedwater Pump 15.

E i

t 2

3 4

'(: Forced Reason:

Ma6had Exhibit G Instauctions 5: Scheduled A Equipment Failure (Emplain) for Preperation of Deta 1-Man I

B-Meintenance of Test 2-Mans 1 Scra.

Entry Sheets for IAvnsee C Refueling

.3-Auto Scras.

Event Report (LER) File (NUREG.

D-Regulatory Restriction

'4-Continued 0161) t E-Operator Training & Ucense Emendnatkm 5-Reduced toad j

F Administret'ive

'-'th*"

5 i

j G-Operational Error (Emplain)

Exhibit 1 - Same Source j

j 19/77)

IIOther (Emplain) i f

, *- V MONTHLY OPERATIONAL

SUMMARY

STATEMENT

- t DOCKET NO.

50-302 UNIT FLCRP-3 DATE 5/1/87 COMPLETED BY J. O. Molton TELEPHONE (904) 795-3802 MONTH 4/87

SUMMARY

STATEMENT:

Crystal River Unit 3 remained on line all month with two major load reductions, each involving different condensate. pumps.

[.*

's 4

i o

e W

o*

t@.....gA a

a:

Florida Power CORPORA 7 ION May 8, 1987 3F0587-06 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit 3 April 1987 Monthly Operating Report.

This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, E. C. Simpson Acting Director, Nuclear Site Support AEF/sdr Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Mr. T. F. Stetka Resident Inspector ff0Y

'lf GENERAL OFFICE: 3201 Thirty-fourth Street South

  • P.O. Box 14042
  • St. Petersburg, Florida 33733 * (813) 866-5151 A Florida Progress Company