3F0585-07, Monthly Operating Rept for Apr 1985

From kanterella
(Redirected from 3F0585-07)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1985
ML20117N752
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/30/1985
From: Graham D, Stewart S, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0585-07, 3F585-7, NUDOCS 8505170651
Download: ML20117N752 (5)


Text

_

  1. =

.,k .-

g I,

( .

OPERATING DATA REPORT DOCKET NO. 50-302 DATE 5-2-85 COMPLETED BY D. Craham TELEPHONE (ona) 70s.3802

_ OPERATING STATUS Crystal River Uriit 3 Not*5

1. Unit Name:
2. Reporting Period: 4/1/85 - 4/30/85
3. Licensed Thermal Power (MWI): 2544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825 ,
6. Maximum Dependable Capacity (Gross MWe):

860 821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted.If Any (Net MWe): NA
10. Reasons For Restrictions.lf Any: NA This Month Yr..to Date Cumulative
11. Hours In Reporting Period 719 2879 71303 ,
12. Number Of Hours Reactor Was Critical 0 1608.3 47524
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On-Line 0 1606.5 46524.3
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 2924173 '04586058
17. Gross Electrical Energy Generated (MWH) 0 1014639 35741856
18. Net Electrical Energy Generated (MWH) 0 o54750 119so741
19. Unit Service Factor 0% 55.8% 65.2%

07, 55.87. 65.27,

20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 0% 4 c . 47. s 9. gy, i22. Unit Capacity Factor (Using DER Net) 07. 40.27. 57.77.
23. Unit Forced Outage Rate ni n7. in.ni 24'. Shutdowns Scheduled Oser Next 6 Months (Type.Date, and Duration of Each1:

Refueling outage which began 3/9/85 and is scheduled to last 20 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: July 27. 1985
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICAL'T ' 1/1 A /77 INITIAL ELECTRfCl".Y 1/30/77 COMMERCIAL OPER ATION 3/13/77 02 (9/77)

PDR e / /

r

.. 6 I

AVERAGE DAILY UNIT P*WER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE 5-2-85 COMPLETED BY D. Craham TELEPHONE (904) 795-3802 MONTH April DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) IMWe-Net) 1 0 37 0 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 11 27 12 28 13 29 14 30 15 31 \/

16 INSTRUCTIONS On this format.hst the aserage daily unit power lese!in MWe-Net for each day in the reperting in.inth. Compute to the nearest whole rnegawait.

to177 6

sup UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-302 UNI T N AME FLCRP-3 '

DATE 5/2/85 HD n L A. Stewart REPORT MONTil ap.-il 1995 TELEPHONE (904) 795-3802 c

r c

- ,, =-

, i?  ; f i,, .::4 Iscensec ,g E

f. Cause & Corrective L. Dite i ~, g 4 jg& I: vent u7 c. ? Action to

$I E Repori a d'G $U Preseni Recurrence 3

5 Q:{: v 85-05 850308 S 719.0 C 4 NA NA NA Refueling Outage Continues

  • Type on the Mar ch 1985 report should have ieen S and not the number 5.

I 2 .I 4 l': Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 1-Automatic Scram. Event Repori iLER) Fde (NURIG-D Regulatory Restriction 4-Ot her (Explam) 0161)

I.-Operator Training & License I xamination F-Adminne rative 5 G-Operational I iror ( E xplain) I slubit I- Same Source l's/77 ) ll Other (I% plain)

. -i i

i- ,

, MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 5/2/85 COMPLETED BY S.A. Stewart TELEPHONE (904) 795-3802 MONTH April 1985

SUMMARY

STATEMENT:

Crystal River 3 remains shutdown for refueling and maintenance.

O l

l I

l.

k 1

t-I

  • l'  :

M Power COR POR AT TON May 7,1985 3F0585-07 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 April 1985 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb l

Attachments cc: Dr. 3. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 g I I GENERAL OFFICE 3201 Thirty fourth Street South e P.O. Dox 14042, St. Petersburg, Florida 33733 e 813-866-5151