3F0585-07, Monthly Operating Rept for Apr 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1985
ML20117N752
Person / Time
Site: Crystal River 
Issue date: 04/30/1985
From: Graham D, Stewart S, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0585-07, 3F585-7, NUDOCS 8505170651
Download: ML20117N752 (5)


Text

_

  1. =

.,k g

I,

(

OPERATING DATA REPORT DOCKET NO.

50-302 DATE 5-2-85 COMPLETED BY D. Craham TELEPHONE (ona) 70s.3802

_ OPERATING STATUS

1. Unit Name:

Crystal River Uriit 3 Not*5 4/1/85 - 4/30/85

2. Reporting Period:
3. Licensed Thermal Power (MWI):

2544

4. Nameplate Rating (Gross MWe):

890 825

5. Design Electrical Rating (Net MWe):

860

6. Maximum Dependable Capacity (Gross MWe):

821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted.If Any (Net MWe):

NA NA

10. Reasons For Restrictions.lf Any:

This Month Yr..to Date Cumulative 719 2879 71303

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 0

1608.3 47524

13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On-Line 0

1606.5 46524.3

15. Unit Reserve Shutdown Hours 0

0 0

0 2924173

'04586058

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 0 1014639 35741856
18. Net Electrical Energy Generated (MWH) 0 o54750 119so741
19. Unit Service Factor 0%

55.8%

65.2%

20. Unit Availability Factor 07, 55.87.

65.27,

21. Unit Capacity Factor (Using MDC Net) 0%

4 c. 47.

s 9. gy, i22. Unit Capacity Factor (Using DER Net) 07.

40.27.

57.77.

23. Unit Forced Outage Rate ni n7.

in.ni 24'. Shutdowns Scheduled Oser Next 6 Months (Type.Date, and Duration of Each1:

Refueling outage which began 3/9/85 and is scheduled to last 20 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

July 27. 1985

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICAL'T '

1/1 A /77 INITIAL ELECTRfCl".Y 1/30/77 COMMERCIAL OPER ATION 3/13/77 02 (9/77)

PDR e

/ /

r 6

I AVERAGE DAILY UNIT P*WER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 5-2-85 DATE COMPLETED BY D. Craham TELEPHONE (904) 795-3802 MONTH April DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

IMWe-Net) 0 0

1 37 2

18 3

19 4

20 5

21 6

22 7

23 8

24 9

25 10 26 11 27 12 28 13 29 14 30

\\/

15 31 16 INSTRUCTIONS On this format.hst the aserage daily unit power lese!in MWe-Net for each day in the reperting in.inth. Compute to the nearest whole rnegawait.

to177 6

sup DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNI T N AME FLCRP-3 DATE 5/2/85 HD n L A.

Stewart REPORT MONTil ap.-il 1995 TELEPHONE (904) 795-3802 c

r c

f i,,.::

=-

,g f.

Cause & Corrective E

4 Iscensec i?

L.

Dite i

~, g 4

jg&

I: vent u7

c. ?

Action to 3 5 :{:

Repori a d'G

$U Preseni Recurrence

$I E

v Q

85-05 850308 S

719.0 C

4 NA NA NA Refueling Outage Continues

  • Type on the Mar ch 1985 report should have ieen S and not the number 5.

I 2

.I 4

l': Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 1-Automatic Scram.

Event Repori iLER) Fde (NURIG-D Regulatory Restriction 4-Ot her (Explam) 0161)

I.-Operator Training & License I xamination F-Adminne rative 5

G-Operational I iror ( E xplain)

I slubit I-Same Source l's/77 )

ll Other (I% plain)

-i i

i-MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO.

50-302 UNIT FLCRP-3 DATE 5/2/85 COMPLETED BY S.A. Stewart TELEPHONE (904) 795-3802 MONTH April 1985

SUMMARY

STATEMENT:

Crystal River 3 remains shutdown for refueling and maintenance.

O l

l I

l.

k 1

t-I l'

M Power COR POR AT TON May 7,1985 3F0585-07 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 April 1985 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb l

Attachments cc:

Dr. 3. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 g

I I

GENERAL OFFICE 3201 Thirty fourth Street South e P.O. Dox 14042, St. Petersburg, Florida 33733 e 813-866-5151