3F0585-07, Monthly Operating Rept for Apr 1985
| ML20117N752 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/30/1985 |
| From: | Graham D, Stewart S, Westafer G FLORIDA POWER CORP. |
| To: | Taylor J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F0585-07, 3F585-7, NUDOCS 8505170651 | |
| Download: ML20117N752 (5) | |
Text
_
- =
.,k g
I,
(
OPERATING DATA REPORT DOCKET NO.
50-302 DATE 5-2-85 COMPLETED BY D. Craham TELEPHONE (ona) 70s.3802
_ OPERATING STATUS
- 1. Unit Name:
Crystal River Uriit 3 Not*5 4/1/85 - 4/30/85
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWI):
2544
- 4. Nameplate Rating (Gross MWe):
890 825
- 5. Design Electrical Rating (Net MWe):
860
- 6. Maximum Dependable Capacity (Gross MWe):
821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NA
- 9. Power Level To Which Restricted.If Any (Net MWe):
NA NA
- 10. Reasons For Restrictions.lf Any:
This Month Yr..to Date Cumulative 719 2879 71303
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
1608.3 47524
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On-Line 0
1606.5 46524.3
- 15. Unit Reserve Shutdown Hours 0
0 0
0 2924173
'04586058
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 0 1014639 35741856
- 18. Net Electrical Energy Generated (MWH) 0 o54750 119so741
- 19. Unit Service Factor 0%
55.8%
65.2%
- 20. Unit Availability Factor 07, 55.87.
65.27,
- 21. Unit Capacity Factor (Using MDC Net) 0%
4 c. 47.
s 9. gy, i22. Unit Capacity Factor (Using DER Net) 07.
40.27.
57.77.
- 23. Unit Forced Outage Rate ni n7.
in.ni 24'. Shutdowns Scheduled Oser Next 6 Months (Type.Date, and Duration of Each1:
Refueling outage which began 3/9/85 and is scheduled to last 20 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
July 27. 1985
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICAL'T '
1/1 A /77 INITIAL ELECTRfCl".Y 1/30/77 COMMERCIAL OPER ATION 3/13/77 02 (9/77)
PDR e
/ /
r 6
I AVERAGE DAILY UNIT P*WER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 5-2-85 DATE COMPLETED BY D. Craham TELEPHONE (904) 795-3802 MONTH April DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
IMWe-Net) 0 0
1 37 2
18 3
19 4
20 5
21 6
22 7
23 8
24 9
25 10 26 11 27 12 28 13 29 14 30
\\/
15 31 16 INSTRUCTIONS On this format.hst the aserage daily unit power lese!in MWe-Net for each day in the reperting in.inth. Compute to the nearest whole rnegawait.
to177 6
sup DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNI T N AME FLCRP-3 DATE 5/2/85 HD n L A.
Stewart REPORT MONTil ap.-il 1995 TELEPHONE (904) 795-3802 c
r c
f i,,.::
=-
,g f.
Cause & Corrective E
4 Iscensec i?
L.
Dite i
~, g 4
jg&
I: vent u7
- c. ?
Action to 3 5 :{:
Repori a d'G
$U Preseni Recurrence
$I E
v Q
85-05 850308 S
719.0 C
4 NA NA NA Refueling Outage Continues
- Type on the Mar ch 1985 report should have ieen S and not the number 5.
I 2
.I 4
l': Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 1-Automatic Scram.
Event Repori iLER) Fde (NURIG-D Regulatory Restriction 4-Ot her (Explam) 0161)
I.-Operator Training & License I xamination F-Adminne rative 5
G-Operational I iror ( E xplain)
I slubit I-Same Source l's/77 )
ll Other (I% plain)
-i i
i-MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO.
50-302 UNIT FLCRP-3 DATE 5/2/85 COMPLETED BY S.A. Stewart TELEPHONE (904) 795-3802 MONTH April 1985
SUMMARY
STATEMENT:
Crystal River 3 remains shutdown for refueling and maintenance.
O l
l I
l.
k 1
t-I l'
M Power COR POR AT TON May 7,1985 3F0585-07 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 April 1985 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb l
Attachments cc:
Dr. 3. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 g
I I
GENERAL OFFICE 3201 Thirty fourth Street South e P.O. Dox 14042, St. Petersburg, Florida 33733 e 813-866-5151