3F0486-03, Monthly Operating Rept for Mar 1986

From kanterella
(Redirected from 3F0486-03)
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1986
ML20199J825
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/31/1986
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0486-03, 3F486-3, NUDOCS 8604090581
Download: ML20199J825 (5)


Text

-

f OPERATING DATA REPORT DOCKET NO. 50-302 DATE alt /AR COMPLETED BY n nenham TELEPHONE (904) 795-3802 OPERATING STATUS Crystal River Unit 3 Notes

1. Unit Name:
2. Reporting Period: 3/1/86 - 3/31/86 2544
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 8S0
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted,1f Any (Net MWe): NA
10. Reasons For Restrictions,if Any: NA This Month Yr to-Date Cumulative
11. Hours in Reporting Period 744 2160 -79344
12. Number Of Hours Reactor Was Critical 0 23.6 50324.6
13. Reactor Resene Shutdown Hour, 0 0 1280.3
14. Hours Generator On-Line 0 23.6 49114.4
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) n . 55103 110523968 -
17. Gross Electrical Energy Generated (MWH) 0 , _ . 19541 37761603
18. Net Electrical Energy Generated (MWH) n innan a59n3959
19. Unit Service Factor om 1.1 % 61.9 %
20. Unit Availability Factor . 0% 1.1 % 61.9 % _
21. Unit Capacity Factor (Using MDCNet) 0% 1.0% 56.7 %
22. Unit Capacity Factor (Using DER Net) __

0% 1.0% 54.8 %

23. Unit Forced Outage Rate 100 % 98.9 % 22.1 %
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

NA

25. If Shut Down At End Of Report Period, Estimated Date of Startup: 6/15/86
26. Units in Test Status (Prior io Commercial Operation): Forecast Achieved INITIAL CRITICALITY 1/14/77
  • INITIAL ELECTRICITY l/30/77 COMMERCIAL OPER ATION 3/13/77 ,

p 4

8604090501 860331 1 PDR ADOCK 05000302 (9/77)

R PDR

'b'Il'UI)

( NJ J p (n. j g Ofk Al I N(> 5f)-3r;g U%II Iqqggp 3

-c. -

- D A TI 4/1

~ ~/86 _.

COMPLE TE D B)1). (?r 'tfuerr MONTif TELEPiloNg (9t;4)- 793_3gg, DAY g

AVERAGE DAILYPOWER LEVEL (MWe Net)

DAY 0

2 g7 AVER(MWe. AGENet > DAILY POWER LEVEL 3 0 18 4

19 5

6 20 __

21 7

22 8 _

23 9

24 10 _

II _ _ _ _ 25 26 12 27 13 _______

28 14 29 _.___.____

15 _ _ _ _

10 16 11 STRUcyjoy3 5

e r sf h51 g rage da>h unn p,m t., ;c g w,~o,<,,,.,

quy,-

f .

A\ l R AC.L D AILY 1: Nil l'OhlR LLYLL DOCKET NO. 50-302 UNil FLC R P-3

.DATE 4/1/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTy 3/86 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (Mwe. Net) 0 0 1 37 2 18 3 19 4 2r 5 21 6 22 7 23 8 24 9 25 10 26 II 27 12 28 13 29 14 30 15 31 16 INSTRUCTIONS l

On this format, list the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

! s I'l/77 )

l I

1 k

l e DOCKET NO. 50-302 ~

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME F LC R P-3 DATE 4/1/86 COMPT.ETED BY S. A. Stewart REPORT MONTH 3/86 TELEPHO,:E (904) 795-3802

- E E j? 3 j E3 Licensee E*, e. Cause & Currective

^""'"

No. Ihte g 3g @ jj$ Event ~7 g EO

> E gc Report # in O Present Recurrence f: .

< t o

U 6

86-01 860101 F 744.0 A 4 86-01 CB PUMPXX The four Reactor Coolant Pumps are being modified and repaired with new pump shafts.

l I 2 3 4 F: Forced Reason: Method Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) ,_g* *g for Preparation of Data B Maintenance of Test 2-M n al seram E""' She'8 5 fo' l'C'"

C-Refueling 3-Auto Scram Event Report (l.I~ Ri fite int'RI G D-Regulatory Restriction 4-continued 0161)

E-Operator Training A Ucense Esaminati<m 5-Reduced Load 9-Other F-Adrninistrative $

G-Operational Error (Explain) Exhibit I - Same Source (9/77) Hother (E xplain)

[.

MONTHLY OPERATIONAL SLR01ARY STATDiOG DOCKET NO. 50-302 UNIT FLCRP-3 DATE 4/1/86 i~

COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTE March 1986 StBSIARY STATEMENT: CR-3 remains off-line for repair of all Reactor Coolant Pumps.

e 4

~

e b

t I

. . . . . . . , . . . . . . . .. .. j

i .

1 8

Power C OR POR ATION April 4, 1986 3F0486-03 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. OPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 March 1986 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely ,

./

G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/ feb Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 1\

GEN ER AL OFFICE 3201 Thirty fourth street south e P.O. Box 14042, St. Petersburg, Florida 33733

  • 813-860-5151