f OPERATING DATA REPORT DOCKET NO.
50-302 DATE alt /AR COMPLETED BY n nenham TELEPHONE (904) 795-3802 OPERATING STATUS Notes
- 1. Unit Name:
Crystal River Unit 3
- 2. Reporting Period:
3/1/86 - 3/31/86 2544
- 3. Licensed Thermal Power (MWt):
890
- 4. Nameplate Rating (Gross MWe):
825
- 5. Design Electrical Rating (Net MWe):
8S0
- 6. Maximum Dependable Capacity (Gross MWe):
821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NA
- 9. Power Level To Which Restricted,1f Any (Net MWe):
NA
- 10. Reasons For Restrictions,if Any:
NA This Month Yr to-Date Cumulative 744 2160
-79344
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
23.6 50324.6 0
0 1280.3
- 13. Reactor Resene Shutdown Hour,
- 14. Hours Generator On-Line 0
23.6 49114.4
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) n 55103 110523968
- 17. Gross Electrical Energy Generated (MWH) 0 19541 37761603
- 18. Net Electrical Energy Generated (MWH) n innan a59n3959
- 19. Unit Service Factor om 1.1 %
61.9 %
- 20. Unit Availability Factor.
0%
1.1 %
61.9 %
0%
1.0%
56.7 %
- 21. Unit Capacity Factor (Using MDCNet)
- 22. Unit Capacity Factor (Using DER Net) 0%
1.0%
54.8 %
100 %
98.9 %
22.1 %
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
NA
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
6/15/86
- 26. Units in Test Status (Prior io Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY l/30/77 COMMERCIAL OPER ATION 3/13/77 p
4 1
8604090501 860331 PDR ADOCK 05000302 (9/77)
R PDR
'b'Il'UI) ( NJ J p (n. j g Ofk Al I N(>
5f)-3r;g U%II Iqqggp 3
-c.
D A TI 4/1
~ ~/86 _.
COMPLE TE D B)1). (?r 'tfuerr MONTif TELEPiloNg (9t;4) 793_3gg, DAY AVERAGE DAILYPOWER LEVEL (MWe Net) g DAY AVER AGE DAILY POWER LEVEL 0
2 (MWe. Net >
g7 3
0 18 4
19 5
20 6
21 7
22 8
23 9
24 10 25 II 26 12 27 13 28 14 29 15 10 16 11 STRUcyjoy3 e r sf h51 rage da>h unn p,m t., ;c g 5
g w,~o,<,,,.,
quy,-
f A\\ l R AC.L D AILY 1: Nil l'OhlR LLYLL DOCKET NO.
50-302 UNil FLC R P-3
.DATE 4/1/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTy 3/86 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(Mwe. Net) 0 1
37 0
2 18 3
19 4
2r 5
21 6
22 7
23 8
24 9
25 10 26 II 27 12 28 13 29 14 30 15 31 16 INSTRUCTIONS l
On this format, list the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
s I'l/77 )
l I
1 k
l e
DOCKET NO. 50-302
~
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME F LC R P-3 DATE 4/1/86 S. A. Stewart 3/86 COMPT.ETED BY REPORT MONTH TELEPHO,:E (904) 795-3802 E
E j?
3 j E3 Licensee E*
e.
Cause & Currective
~7
^ " " ' "
No.
Ihte g
3g jj$
Event g
f:
E gc Report #
in O EO Present Recurrence o
t U
6 86-01 860101 F
744.0 A
4 86-01 CB PUMPXX The four Reactor Coolant Pumps are being modified and repaired with new pump shafts.
l I
2 3
4 F: Forced Reason:
Method Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) for Preparation of Data
,_g*
- g E""' She'8 5 fo' l'C'"
B Maintenance of Test 2-M n al seram C-Refueling 3-Auto Scram Event Report (l.I~ Ri fite int'RI G D-Regulatory Restriction 4-continued 0161)
E-Operator Training A Ucense Esaminati<m 5-Reduced Load 9-Other F-Adrninistrative G-Operational Error (Explain)
Exhibit I - Same Source (9/77)
Hother (E xplain)
[.
MONTHLY OPERATIONAL SLR01ARY STATDiOG DOCKET NO. 50-302 UNIT FLCRP-3 DATE 4/1/86 COMPLETED BY D. Graham i ~
TELEPHONE (904) 795-3802 MONTE March 1986 StBSIARY STATEMENT:
CR-3 remains off-line for repair of all Reactor Coolant Pumps.
e 4
e
~
b t
I j
1 i
.8 Power C OR POR ATION April 4, 1986 3F0486-03 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. OPR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 March 1986 Monthly Operating Report.
These reports are submitted in accordance with Technical Specification 6.9.1.6.
Sincerely,
./
G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/ feb Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 1 \\
GEN ER AL OFFICE 3201 Thirty fourth street south e P.O. Box 14042, St. Petersburg, Florida 33733