3F0486-03, Monthly Operating Rept for Mar 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1986
ML20199J825
Person / Time
Site: Crystal River 
Issue date: 03/31/1986
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0486-03, 3F486-3, NUDOCS 8604090581
Download: ML20199J825 (5)


Text

-

f OPERATING DATA REPORT DOCKET NO.

50-302 DATE alt /AR COMPLETED BY n nenham TELEPHONE (904) 795-3802 OPERATING STATUS Notes

1. Unit Name:

Crystal River Unit 3

2. Reporting Period:

3/1/86 - 3/31/86 2544

3. Licensed Thermal Power (MWt):

890

4. Nameplate Rating (Gross MWe):

825

5. Design Electrical Rating (Net MWe):

8S0

6. Maximum Dependable Capacity (Gross MWe):

821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted,1f Any (Net MWe):

NA

10. Reasons For Restrictions,if Any:

NA This Month Yr to-Date Cumulative 744 2160

-79344

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 0

23.6 50324.6 0

0 1280.3

13. Reactor Resene Shutdown Hour,
14. Hours Generator On-Line 0

23.6 49114.4

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) n 55103 110523968
17. Gross Electrical Energy Generated (MWH) 0 19541 37761603
18. Net Electrical Energy Generated (MWH) n innan a59n3959
19. Unit Service Factor om 1.1 %

61.9 %

20. Unit Availability Factor.

0%

1.1 %

61.9 %

0%

1.0%

56.7 %

21. Unit Capacity Factor (Using MDCNet)
22. Unit Capacity Factor (Using DER Net) 0%

1.0%

54.8 %

100 %

98.9 %

22.1 %

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

NA

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

6/15/86

26. Units in Test Status (Prior io Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY l/30/77 COMMERCIAL OPER ATION 3/13/77 p

4 1

8604090501 860331 PDR ADOCK 05000302 (9/77)

R PDR

'b'Il'UI) ( NJ J p (n. j g Ofk Al I N(>

5f)-3r;g U%II Iqqggp 3

-c.

D A TI 4/1

~ ~/86 _.

COMPLE TE D B)1). (?r 'tfuerr MONTif TELEPiloNg (9t;4) 793_3gg, DAY AVERAGE DAILYPOWER LEVEL (MWe Net) g DAY AVER AGE DAILY POWER LEVEL 0

2 (MWe. Net >

g7 3

0 18 4

19 5

20 6

21 7

22 8

23 9

24 10 25 II 26 12 27 13 28 14 29 15 10 16 11 STRUcyjoy3 e r sf h51 rage da>h unn p,m t., ;c g 5

g w,~o,<,,,.,

quy,-

f A\\ l R AC.L D AILY 1: Nil l'OhlR LLYLL DOCKET NO.

50-302 UNil FLC R P-3

.DATE 4/1/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTy 3/86 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

(Mwe. Net) 0 1

37 0

2 18 3

19 4

2r 5

21 6

22 7

23 8

24 9

25 10 26 II 27 12 28 13 29 14 30 15 31 16 INSTRUCTIONS l

On this format, list the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

s I'l/77 )

l I

1 k

l e

DOCKET NO. 50-302

~

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME F LC R P-3 DATE 4/1/86 S. A. Stewart 3/86 COMPT.ETED BY REPORT MONTH TELEPHO,:E (904) 795-3802 E

E j?

3 j E3 Licensee E*

e.

Cause & Currective

~7

^ " " ' "

No.

Ihte g

3g jj$

Event g

f:

E gc Report #

in O EO Present Recurrence o

t U

6 86-01 860101 F

744.0 A

4 86-01 CB PUMPXX The four Reactor Coolant Pumps are being modified and repaired with new pump shafts.

l I

2 3

4 F: Forced Reason:

Method Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) for Preparation of Data

,_g*

  • g E""' She'8 5 fo' l'C'"

B Maintenance of Test 2-M n al seram C-Refueling 3-Auto Scram Event Report (l.I~ Ri fite int'RI G D-Regulatory Restriction 4-continued 0161)

E-Operator Training A Ucense Esaminati<m 5-Reduced Load 9-Other F-Adrninistrative G-Operational Error (Explain)

Exhibit I - Same Source (9/77)

Hother (E xplain)

[.

MONTHLY OPERATIONAL SLR01ARY STATDiOG DOCKET NO. 50-302 UNIT FLCRP-3 DATE 4/1/86 COMPLETED BY D. Graham i ~

TELEPHONE (904) 795-3802 MONTE March 1986 StBSIARY STATEMENT:

CR-3 remains off-line for repair of all Reactor Coolant Pumps.

e 4

e

~

b t

I j

1 i

.8 Power C OR POR ATION April 4, 1986 3F0486-03 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. OPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 March 1986 Monthly Operating Report.

These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

./

G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/ feb Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 1 \\

GEN ER AL OFFICE 3201 Thirty fourth street south e P.O. Box 14042, St. Petersburg, Florida 33733

  • 813-860-5151