1CAN038913, Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept

From kanterella
Jump to navigation Jump to search
Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept
ML20247E819
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/21/1989
From: James D
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247E824 List:
References
1CAN038913, 1CAN38913, NUDOCS 8904030246
Download: ML20247E819 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ .

1 ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 [501) 377-4000 March 21, 1989 l

1CANO38913 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station PI-137 Washington, DC 20555

SUBJECT:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Reactor Containment Integrated Leak Rate Test Gentlemen:

In accordance with the requirements of Section 4.4.1.1 of the Arkansas Nuclear One - Unit 1 Technical Specifications and 10CFR50 Appendix J(V)(B) and the submittal guidance of Regulatory Guide 10.1 attached is one (1) copy of the subject report.

Very truly ours, QAt' p.-

ale E. James Supe [vjor, Licensing DEJ:MCS:de Attachment i

7 8904030246 890321 FOR ADOCK 05000313

) YM MEMBEA MOOLE SOUTH UTILITIES SYSTEM

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _