1CAN038913, Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept

From kanterella
(Redirected from 1CAN038913)
Jump to navigation Jump to search
Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept
ML20247E819
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/21/1989
From: James D
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247E824 List:
References
1CAN038913, 1CAN38913, NUDOCS 8904030246
Download: ML20247E819 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ .

1 ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 [501) 377-4000 March 21, 1989 l

1CANO38913 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station PI-137 Washington, DC 20555

SUBJECT:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Reactor Containment Integrated Leak Rate Test Gentlemen:

In accordance with the requirements of Section 4.4.1.1 of the Arkansas Nuclear One - Unit 1 Technical Specifications and 10CFR50 Appendix J(V)(B) and the submittal guidance of Regulatory Guide 10.1 attached is one (1) copy of the subject report.

Very truly ours, QAt' p.-

ale E. James Supe [vjor, Licensing DEJ:MCS:de Attachment i

7 8904030246 890321 FOR ADOCK 05000313

) YM MEMBEA MOOLE SOUTH UTILITIES SYSTEM

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _