05000336/LER-1997-033, Forwards LER 97-033-01,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970727.LER Submitted Per 10CFR50.73(a)(2)(ii) & 10CFR50.73(a)(2)(v)

From kanterella
(Redirected from 05000336/LER-1997-033)
Jump to navigation Jump to search
Forwards LER 97-033-01,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970727.LER Submitted Per 10CFR50.73(a)(2)(ii) & 10CFR50.73(a)(2)(v)
ML20217P030
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/03/1998
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217P034 List:
References
B17048, NUDOCS 9803090397
Download: ML20217P030 (5)


LER-2097-033, Forwards LER 97-033-01,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970727.LER Submitted Per 10CFR50.73(a)(2)(ii) & 10CFR50.73(a)(2)(v)
Event date:
Report date:
3362097033R00 - NRC Website

text

,

e pg Rope Ferry Rd. (bute 156), Eterford, CT 06385 Nuclear Energy wiii, tone Nuclear Power Station Northeast Nuclear Energy Company P.O. Box 128 Waterford, CT 06385-0128

  • (860) 447-1791 Fax (860) 444-4277

'ne Northeast Utilities System

%. 3 1998 Docket No. 50-336 B17048 Re: 10 CFR 50.73(a)(2)(ii) 10 CFR 50.73(a)(2)(v)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 2 Licensee Event Report 97-033-01 Design Deficiencies identified with ESAS Actuation Cabinet Power Supolies and Associated Fuses This letter forwards Licensee Event Report (LER) 97-033-01, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2, on July 27,1997. This LER was originally submitted pursuant to 10 CFR 50.73(a)(2)(ii) and 50.73(a)(2)(v).

Additional analyses and investigation of this event indicates that this event is not reportable in accordance with the requirements of 10 CFR 50.72 or 10 CFR 50.73.

There are no commitments contained within this letter.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY J. rice Dir r - Millstone Unit No. 2 I 4- /i cc: see page 2 9803090397 980303 PDR ADOCK 05000336 h,\hkhk l . .

0634224 REV.12-95 l

i

U.S. Nuclzr Regul: tory Commission B17048\Prge 2 Attachments: 1. List of Regulatory Commitments

. , 2. LER 97 033-01 cc: H. J. Miller, Region 1 Administrator D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 W. D. Travers, PhD, Director, Special Projects Office -

P. F. McKee, Deputy Director of Licensing, Special Projects Office W. D. Lanning, Deputy Director of Inspections, Special Projects Office 4

Docket No. 50-336

, B17048 n

Attachment 1 Millstone Nuclear Power Station, Unit No. 2 l

i Commitments u-1 .

, I l

l l

March 1998 J

l

U.S. Nucl: r R:gulatory Commission B17048%ttrchment 1\Prg31 Attachment 1 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Any other actions discussed in the submittal represent intended or planned actions by NNECO. They are described to the NRC for the NRC's information and are not regulatory commitments. The Director - Regulatory Affairs or Manager - Regulatory Compliance Unit 2 should be notified of any questions regarding this document or any associated regulatory commitments.

REGULATORY COMMI6 DENT COMMITTED DATE OR OUTAGE None 1

1 1

1 i

Docket No. 50-336

. B17048 1 .

I i

Attachment 2 Millstone Nuclear Power Station, Unit No. 2 LER 97-033-01 i l

i

.1

i. l l l l,

f l

March 1998 I^