05000328/LER-1982-137, Forwards Updated LER 82-137/03X-1

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 82-137/03X-1
ML20079N911
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/24/1983
From: Green H
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20079N915 List:
References
NUDOCS 8303040465
Download: ML20079N911 (1)


LER-2082-137, Forwards Updated LER 82-137/03X-1
Event date:
Report date:
3282082137R00 - NRC Website

text

e-. __

7-.

I TENNESSEE VA'LLEY AUTHORITY l CHATTANOOGA. TENNESSEE 374o1 1750 Chestnut Street Tower II cc .

February 24, 1983 G cz

~m

$ MO Nb3

> wn Mr. James P. O'Reilly, Director j U.S. Nuclear Regulatory Commission -W Office of Inspection and Enforcement Region II >

101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 2 - DOCKET '

NO. 50-328 - FACILITY OPERATING LICENSE DPR REPORTABLE OCCURRENCE REPORT SQRO-50-328/82137 - REVISION 1 The enclosed report is a supplement to my letter to you dated December 21, 1982 concerning the inoperability of the upper head injection (UHI) system level switches and valve. This report is submitted in accordance with Sequoyah unit 2 Technical Specification 6.9.1.13.b.

Very truly yours, TENNESSEE VALLEY AUTHORITY SA' H. J. Green Director of Nuclear Power Enclosure cc (Enclosure):

Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 g NRC Inspector, Sequoyah

~$h U

g p 8303040465 830224 pgNt ADOCK 05000328 ,

o PDR /

U An Equal Opportunity Employer

.- -