05000245/LER-1997-019, Forwards LER 97-019-00 Which Documents Event That Occurred at Mnps,Unit 1 on 970326.Commitments Made within Ltr, Submitted

From kanterella
(Redirected from 05000245/LER-1997-019)
Jump to navigation Jump to search
Forwards LER 97-019-00 Which Documents Event That Occurred at Mnps,Unit 1 on 970326.Commitments Made within Ltr, Submitted
ML20138C722
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/25/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138C726 List:
References
B16395, NUDOCS 9704300185
Download: ML20138C722 (2)


LER-2097-019, Forwards LER 97-019-00 Which Documents Event That Occurred at Mnps,Unit 1 on 970326.Commitments Made within Ltr, Submitted
Event date:
Report date:
2452097019R00 - NRC Website

text

. _ . - --- .-- _- __ -_ .- .-

Northeast *~ f * ""ge Ferry Hd , Waterford, LT g\h l Utilities System r.o. iw n8 j Waterford, CF 063M-0128

) (860) 447-1791 APR t5197T l Docket No. 50-245 B16395 l Re: 10CFR50.73(a)(2)(i) l U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 1

I This letter forwards Licensee Event Report (LER) 97-019-00, documenting an event that j occurred at Millstone Nuclear Power Station, Unit No.1 on March 26, 1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(i).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only.

l B16395-1 NNECO commits that the chemistry procedure will be changed to a surveillance l procedure and revised to implement the assumptions and conditions from the Offsite i Dose Calculation Manual (ODCM) concerning use of the liquid radwaste monitor I l default setpoint by July 30,1997.

B16395-2 .NNECO commits to perform a review of the unit chemistry procedures to ensure compliance with efiluent Technical Specifications by July 31,1997.  !

l  !

B16395-3 NNECO commits to revise the admmistrative procedure governing ODCM revisions l to require the Unit Chemistry Manager's review and signature for revisions by July 30,1997, i l B16395-4 NNECO commits to revise the ODCM to allow flexibility during shutdown to l address special conditions when determining efiluent monitor setpoints by December 31,1997.

Very tnily yours, NORTHEAST NUCLEAR ENERGY COMPANY Oe P.lITEnenkamp

)U0D ( x V

,)I I

Director, Unit Operations l

9704300185 970425 PDR ADOCK 05000245 8 PDR' '

aconnns

.s s . . < i -

Attachment:

LER 97-019-00 cc: Dr. W. D. Travers, Director, Special Projects H. J. Miller, Region I Administrator S. Dembek, NRC Project Manager, Millstone Unit No.1 T. A. Eastick, Senior Resident inspector, Millstone Unit No. !

l l

4